Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jun 28, 2017 19:44:56 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jun 28, 2017 19:44:56 IST

Blog Entry# 2074100  
Posted: Nov 28 2016 (18:14)

1 Responses
Last Response: Nov 28 2016 (18:14)
  
Rail News
0 Followers
453 views
New Facilities/TechnologyCR/Central  -  IR Press Release 
Nov 28 2016 (13:48)   Setting up of Rolling Stock Component Factory at Lote Parshuram, MIDC, District Ratnagiri, Maharashtra

I M BACK^~   5 news posts
Entry# 2074100   News Entry# 287003         Tags   Past Edits
Setting up of Rolling Stock Component Factory at Lote Parshuram, MIDC, District Ratnagiri, Maharashtra
Central Railway
Press Release
Setting up of Rolling Stock Component Factory at Lote Parshuram, MIDC,
District Ratnagiri, Maharashtra
Shri
...
more...
Suresh Prabhu, Hon’ble Minister of Railways, will lay the foundation stone for Rolling Stock Component Factory at Lote Parshuram, Near Ratnagiri soon. Cost of erection of this factory is Rs. 297.28 crore. For this, 50 acres of land has been acquired from MIDC in Lote Parshuram area in Ratnagiri district.
Centralized Railway Rolling Stock Components Factory can discharge the works of overhaul and rehabilitation of safety sub-assemblies of railway rolling stock, dedicated overhaul equipment and rehabilitation lines coupled with dedicated workers will ensure consistent and world class quality at low cost. This factory will meet the needs of not o­nly Central Railway but also the adjoining railways like Konkan Railway Corporation, Western Railway, South Central Railway, South Western Railway, etc.
From Rolling Stock Component Factory, Indian Railways will accrue following vital benefits:
·Improvement in reliability of wagons and coaches.
·Increased availability, leading to higher revenue generation.
·Higher rolling stock and reliability.
Being the first big project in the area, this factory will pave way for ancilliary activities in the adjoining areas of Khed and Chiplun in Ratnagiri district. This project is also expected to speed up the development of the region through employment generation of around 500.
--- --- ---
Date: November 26, 2016
This news comes to you from the Public Relations Department, Central Railway, Chhatrapati Shivaji Terminus Mumbai

  
1771 views
Nov 28 2016 (18:14)
srinivasvasanthi~   3909 blog posts   13 correct pred (50% accurate)
Re# 2074100-1            Tags   Past Edits
Hope its for LHB coaches not for ICF coaches

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jul 8
Trains with ARP 15 Dep on: Thu Jul 13
Trains with ARP 30 Dep on: Fri Jul 28
Trains with ARP 120 Dep on: Thu Oct 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.