Blog Entry# 2077806  
Posted: Dec 02 2016 (09:34)

3 Responses
Last Response: Dec 02 2016 (18:45)
  
Rail News
0 Followers
913 views
Commentary/Human InterestSR/Southern  -  
Dec 02 2016 (09:08)   Podanur - Pollachi gauge conversion likely to be completed by January

rdb*^   126004 news posts
Entry# 2077806   News Entry# 287384         Tags   Past Edits
The ongoing gauge conversion of the 40-km odd Podanur - Pollachi section providing a shorter and easy link to Western Tamil Nadu with Southern Tamil Nadu is likely to be completed by January and the Commissioner of Rail Safety would inspect it sometime in February, said Vashishta Johri, Southern Railway General Manager, on Thursday.
He was talking to reporters at the Pollachi Junction during his visit to the town from Palakkad. Mr. Johri. accompanied by Naresh Lalwani, Divisional Railway Manager of Palakkad Division, Sudhakar Rao, Chief Administrative Officer, Prafulla Verma, Chief Engineer, Ajith Kumar, Chief Signal and Telecom Engineer, and Vijayakumar, Chief Electrical Engineer, inspected the recently completed Palakkad - Pollachi section.
The
...
more...
GM also visited the en route railway stations, Meenakshipuram and Subbegoundenpudur, and took stock of the passenger amenities.
Mr. Johri said that majority of the gauge conversion work on the Podanur - Pollachi section was getting delayed only because of the difficulties in eliminating the rocky terrain for six km between Kinathukkadavu and Mayileripalayam.
He said that the works would be completed by January and the report would be sent to enable the inspection by Commissioner of Rail Safety in February.
Mr. Johri also promised to take steps to bring in Passenger Reservation System counter facility at the Pollachi Junction.

  
1231 views
Dec 02 2016 (09:34)
Mazi IRI   645 blog posts
Re# 2077806-1            Tags   Past Edits
good news..

  
878 views
Dec 02 2016 (16:52)
utkal andhra~   691 blog posts
Re# 2077806-2            Tags   Past Edits
podanur/coambatore --Rameswaram over night express train should be re introduced .

  
712 views
Dec 02 2016 (18:45)
rojaRAJU   290 blog posts
Re# 2077806-3            Tags   Past Edits
GM visit/ inspection would have improved speed of track laying/ ballast filling ... Can really expect finishing of this section soon if not by January, by Feb or Mar 2017 ... Kinathukadavu - Pothanur Ballast filling and Tamping of about 20 Kms would require roughly two months (guess) ...

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...