Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 29, 2017 01:11:38 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 29, 2017 01:11:38 IST

Blog Entry# 2081238  
Posted: Dec 05 2016 (16:38)

7 Responses
Last Response: Dec 05 2016 (20:50)
  
★  General Travel
0 Followers
998 views
Dec 05 2016 (16:38)   MFP/Muzaffarpur Junction (6 PFs)

©The Dark Lord™~   7689 blog posts   1 correct pred (80% accurate)
Entry# 2081238            Tags   Past Edits
कल रात मुजफ्फरपुर जंक्शन के अनारक्षित विश्राम गृह का हाल कुछ ऐसा था...

2 posts - Mon Dec 05, 2016

  
679 views
Dec 05 2016 (16:57)
Indian Railways the life line of our Nation~   16104 blog posts   137 correct pred (82% accurate)
Re# 2081238-3            Tags   Past Edits
Aaj kal yaha ka passenger movement bohot badh gaya hai

  
642 views
Dec 05 2016 (16:59)
JBP ET OHE OMG 😲 WAITING FOR SVDK TRIP 😍😎~   13136 blog posts   22 correct pred (42% accurate)
Re# 2081238-4            Tags   Past Edits
भीड़ तो परीक्षा देने आए लड़कों समान नजर आ रही है

  
589 views
Dec 05 2016 (17:02)
Indian Railways the life line of our Nation~   16104 blog posts   137 correct pred (82% accurate)
Re# 2081238-6            Tags   Past Edits
ha,ye sab students hai jo exam dene ke liye train ka intzaar kar rahe hai

  
648 views
Dec 05 2016 (20:38)
©The Dark Lord™~   7689 blog posts   1 correct pred (80% accurate)
Re# 2081238-7            Tags   Past Edits
Yaha bhi haal waisa hi hai, UR waiting hall full hone ke baad log circulating area me baithe rehte hai plastic sheet bicha ker. Thand ke mausam me bhi platform ke bahar bhi kuch aisa hi najara rehta hai.

  
611 views
Dec 05 2016 (20:50)
DBG SC RXL HYB Express MUST Be Brought Back😡~   2071 blog posts   1 correct pred (100% accurate)
Re# 2081238-8            Tags   Past Edits
Not a single train is running on time and laying on circulating area without sheds in this weather is like a torture for them!
Railway is not even increasing no. Of UR waiting halls here in DBG!
Sometimes they end up getting home when trains like swatantrata senani gets cancelled or rescheduled!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jul 9
Trains with ARP 15 Dep on: Fri Jul 14
Trains with ARP 30 Dep on: Sat Jul 29
Trains with ARP 120 Dep on: Fri Oct 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.