Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jun 24, 2017 13:04:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jun 24, 2017 13:04:07 IST

Blog Entry# 2081710  
Posted: Dec 06 2016 (08:37)

5 Responses
Last Response: Dec 07 2016 (19:40)
  
★  Info Update
0 Followers
4635 views
Dec 06 2016 (08:37)   53371/Koderma - Barkakana Passenger (UnReserved) | HZBN/Hazaribagh Town (3 PFs)

4πu¶am*^~   5931 blog posts   42380 correct pred (87% accurate)
Entry# 2081710            Tags   Past Edits
Introduction of newly built Hazaribagh Town-Barkakana section (57km) and extension of all Koderma-Hazaribagh Town Passenger trains to Barkakana.

  
4209 views
Dec 06 2016 (11:09)
18626 The Super £xpresssss~   1730 blog posts
Re# 2081710-1            Tags   Past Edits
So koderma barkakana is connected they can run koderma ranchi via muri, . Or will wait till New line construction!!!,

  
3899 views
Dec 07 2016 (08:38)
SER is the best~   3141 blog posts   129 correct pred (81% accurate)
Re# 2081710-2            Tags   Past Edits
I guess barkakana to tati silwai will also be inaugurated soon which will provide direct rail connectivity to ranchi and hazaribagh..

  
3936 views
Dec 07 2016 (08:40)
SER is the best~   3141 blog posts   129 correct pred (81% accurate)
Re# 2081710-3            Tags   Past Edits
Muri won't come in this route.. barkakana-tatisilwai is the next stage to be completed..

  
3789 views
Dec 07 2016 (16:46)
18626 The Super £xpresssss~   1730 blog posts
Re# 2081710-4            Tags   Past Edits
Yes muri dont come,but barkakana muri ranchi can also be used, and tatisilwai route is not much far from muri jn, both routes r closed enough.

  
3757 views
Dec 07 2016 (19:40)
SER is the best~   3141 blog posts   129 correct pred (81% accurate)
Re# 2081710-5            Tags   Past Edits
Tatisilwai to barkakana will be around 50 kms but via muri tatisilwai to barkakana will be around 110 kms.. So the distance is more than twice bro via muri..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jul 4
Trains with ARP 15 Dep on: Sun Jul 9
Trains with ARP 30 Dep on: Mon Jul 24
Trains with ARP 120 Dep on: Sun Oct 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.