Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 02:14:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 02:14:09 IST

Blog Entry# 2082790  
Posted: Dec 07 2016 (04:00)

11 Responses
Last Response: Dec 08 2016 (17:45)
  
Race Blog
0 Followers
2750 views
Dec 07 2016 (04:00)   12560/Shiv Ganga Express | NDLS/New Delhi (16 PFs)

🚅भारतीए रेल समर्थक🚅~   10808 blog posts   18225 correct pred (66% accurate)
Entry# 2082790            Tags   Past Edits
EXPECTED PARALLEL DEPARTURE OF TWO SAME ROUTE SAME DESTINATION SAME SOURCE TRAINS....4AM
12560 SG EXP
------
12582 MUV SF EXP
Let's see who wins the race till MUV.....

6 posts - Wed Dec 07, 2016

  
2202 views
Dec 07 2016 (13:28)
Trip to Nani Ghar aka Barauni^~   30222 blog posts   22623 correct pred (75% accurate)
Re# 2082790-7            Tags   Past Edits
Aaage kaun h?

  
2173 views
Dec 07 2016 (14:55)
🚅भारतीए रेल समर्थक🚅~   10808 blog posts   18225 correct pred (66% accurate)
Re# 2082790-8            Tags   Past Edits
Dono hi abhi cnb nhi aayin...aur aage 12582 hai.....60-80kms ahead of shivganga

  
2048 views
Dec 07 2016 (21:22)
🚅भारतीए रेल समर्थक🚅~   10808 blog posts   18225 correct pred (66% accurate)
Re# 2082790-9            Tags   Past Edits
Aur shivganga ne MUV sf ko overtake kr diyaa.....SG dep ald bt muv sf has 50kms to go for ald....

  
2027 views
Dec 07 2016 (22:09)
Trip to Nani Ghar aka Barauni^~   30222 blog posts   22623 correct pred (75% accurate)
Re# 2082790-10            Tags   Past Edits
shaam me hi ot ho gya tha
muv sf 30 min tk khdi rhi thi

  
1776 views
Dec 08 2016 (17:45)
🚅भारतीए रेल समर्थक🚅~   10808 blog posts   18225 correct pred (66% accurate)
Re# 2082790-12            Tags   Past Edits
ohhh very bad running for MUV.....why stranded for 30 mins......:/

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site