Post gauge conversion of Aishbagh (ASH) - Sitapur (STP) section should NER start doubling & electrification so that an alternative route from Gorakhpur (GKP) and Lucknow (LJN) towards Moradabad (MB) for Delhi would be ready to reduce current load. Please vote...
Yes. post GC doubling & electrification should be started
75%
15
Yes. post GC only electrification can start. Doubling can be done later
5%
1
Only doubling is required
5%
1
No. doubling & electrification is not required
0%
0
Only electrification is required
15%
3
This route will not have any value
0%
0