Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode
 
Tue Apr 16 11:25:47 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 2084721
Posted: Dec 08 2016 (21:42)

7 Responses
Last Response: Dec 08 2016 (22:21)
Rail Budget
5407 views
2

Dec 08 2016 (21:42)  
shailshekhara
shailshekhara   35232 blog posts
Entry# 2084721              
Minister of Railways inaugurates Website of National Rail Plan, 2030
08-December-2016 17:21 IST

In a further move to take the Indian Railways at an advanced level, Minister of Railways Shri Suresh Prabhakar Prabhu in a programme held in Rail Bhawan today i.e. 08.12.2016 launched website of National Rail Plan, 2030. The website can be accessed at Click Here
...
more...
This dedicated website for National Rail Plan (NRP, 2030) has been developed for all stakeholders to give their inputs for purposeful study as Railways’ planning cannot be done in isolation. In order to provide long term perspective to planning for augmenting the railway network Ministry of Railways have decided to develop National Rail Plan (NRP 2030) in consultation with all the stakeholders including State Governments, public representatives and other relevant Central Ministries. NRP-2030 will endeavour to harmonise and integrate the rail network with other modes of transport and create synergy for achieving seamless multi modal transportation network across the country. This will also achieve the Hon’ble Prime Minister’s vision of integrated planning and cost optimization of the transportation network by laying the new railway lines and new highways together in tunnels and over mega-bridges.

Speaking on the occasion, Minister of Railways Shri Suresh Prabhakar Prabhu said that Indian Railways needs to form a concrete plan about its doings in the coming 10-20 years. He said that after receiving ideas Railways will capture all the requirements from the different stakeholders. He said that if we have a proper structured demand and decide the time to implement it, it will be very good for the country and the person making the demand. He said that Railways do not want to beat the other modes of transport by competing but want to work by complementing. He said that Railways will be including all the ideas received during recently held Rail Vikas Shivir in the National Rail Plan.

BACKGROUNDER : -

The Indian Railway Network is a key component of the Country’s Transport System. Transporting goods and passengers on a massive scale, the Indian Railways plays a critical role in India’s economic as well as social fabric, not to mention the security and cross-border strategic linkages. Pragmatic development of Indian Railway Network as part of the country’s overall multi-modal transport system is therefore, very important.

So far, the development of the network is taken up based on numerous individual requests received from various stakeholders such as State Governments, elected representatives, industries, etc. for sanction of railway projects in different parts of the country. Based upon these representations and based upon infrastructural gaps, operational requirements, bottlenecks strategic requirements, socio-economic considerations and participation by other stakeholders, new railway projects are sanctioned. However, these projects are sanctioned mostly in isolation and may not necessarily take holistic view of railway infrastructural needs of the Country.

Presently Railway planning is presently not based on some integrated plan. Surveys are initially done as per demands of Public representatives and the some of these lines are later sanctioned. Railways shall reverse the process. First the network plan should be there and accordingly surveys should be started. The network plan shall take into account connectivity to backward region, Congestion in the existing network and futuristic development of Industrial corridors. Deficits in existing network are to be planned for removal. There are huge regional imbalances.

To take a holistic approach, a beginning was made 2 years back when 24 clusters were identified and process of removal of their bottlenecks was initiated on a corridor basis. Projects were sanctioned to decongest the network and works have started.

To take this process to next level, National Rail Plan 2030 has been envisaged which shall not only take care of existing corridors but also the identification and development of new corridors & connections. This will facilitate easy movement of freight and passengers, and access to resources and services with reliability, safety and convenience to secure an environmentally efficient and long term sustainable rail transport system.

Participation of all stake holders is the key in development of NRP. Suggestions/expectations/inputs from all are needed for deliberation and inclusion in NRP. Accordingly dedicated website for National Rail Plan (NRP) 2030 has been developed for all stake holders to give their inputs for purposeful study as Railways planning cannot be done in isolation.

Railways are open to all ideas including any suggestion regarding how the plan should be prepared and implemented. National Rail Plan web site will be in public domain for consultation and shall be shared with all Stake holders in the transport sector including States, Different ministries involved with transportation, Federations such as CII and FICCI etc. All gaps in railway infrastructure are to be identified and ways to fill them up are to be worked out. There may be surplus infrastructure in some areas whereas deficit in other areas. All gaps are to be identified and balancing of views of all the stake holders in development of plan will be important.

This will also achieve the Hon’ble Prime Minister’s vision of integrated planning and cost optimization of the transportation network by laying the new railway lines and new highways together in tunnels and over mega-bridges.

Press Release

Website - National Rail Plan, 2030

Translate to English
Translate to Hindi
Show AI Response

2 Posts

2719 views
0

Dec 08 2016 (21:59)
shailshekhara
shailshekhara   35232 blog posts
Re# 2084721-3              
DEDICATED FREIGHT CORRIDORS

Among six Dedicated Freight Corridors, two corridors i.e Eastern and Western DFC Corridors are under construction and remaining four corridors i.e. East- West, North-South, East-Coast and Southern Corridors are at the planning stage. The length of these six Dedicated Freight Corridors are as follows:

North-South
...
more...
Corridor-2328 km
East-West Corridor-2328 km
East-Coast Corridor - 1115 km,
Southern Corridor-892 km,
Eastern Corridor-1318 km
Western Corridor-1482 km

Source

Translate to English
Translate to Hindi
Show AI Response

2451 views
0

Dec 08 2016 (22:03)
shailshekhara
shailshekhara   35232 blog posts
Re# 2084721-4              
HIGH SPEED RAIL CORRIDORS

Source
Translate to English
Translate to Hindi
Show AI Response

2562 views
0

Dec 08 2016 (22:06)
madanmohanmeena^~
madanmohanmeena^~   15465 blog posts
Re# 2084721-5              
Map me ro bahut si mistakes h.
Translate to English
Translate to Hindi
Show AI Response

2591 views
0

Dec 08 2016 (22:21)
Vishwanath   20299 blog posts
Re# 2084721-6               Past Edits
Bad Request - Invalid Hostname
HTTP Error 400. The requesthostname is invalid.
Correct link click here
Translate to English
Translate to Hindi
Show AI Response

2411 views
0

Dec 08 2016 (22:21)
Sanz~
Sanz~   8508 blog posts
Re# 2084721-7               Past Edits
Url: www.nationalrailplan.in
Remove the fullstop frm end.
Translate to English
Translate to Hindi
Show AI Response

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy