Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jun 28, 2017 01:08:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jun 28, 2017 01:08:43 IST

Blog Entry# 2086664  
Posted: Dec 10 2016 (16:22)

1 Responses
Last Response: Dec 10 2016 (16:22)
  
Rail News
0 Followers
358 views
Other News
Dec 10 2016 (16:18)   A train two times faster than bullet train is coming to India

Jayashree ❖ Amita*^   36806 news posts
Entry# 2086664   News Entry# 288206         Tags   Past Edits
Indian Railway may soon put on track the next generation Maglev trains that will be two-times faster than the proposed bullet train between Mumbai and Ahmedabad. The Railway Ministry will be entrusting the task to its engineering wing RITES to explore the feasibility of developing the corridor on PPP model and the possible funding patterns.
Sources said the consultant will be asked to prepare a feasibility report and subsequently work will begin on preparing the detailed project report (DPR). A railway board official said the mechanical wing of the railways has sent a formal proposal to the finance department to work out the expenditure on the project.
...
more...
Since, the project would require huge investment, the government has no option but to develop the same on PPP model. An expression of interest was issued by the ministry to which six private companies including two global firms have responded so far. Top sources in railway ministry said once the project estimate is prepared, the railways may offer its vacant land for the construction purpose and also bear the cost partially. Since the Maglev train system will be entirely different from the existing railway network, the operation of these trains could be handed over to private agency.  Officials said the DPR will include the tentative routes, cost estimate and the fare structure. As per the plan, the corridor will be developed along congested stretches like Delhi -Howrah, Delhi-Mumbai and Delhi-Chennai so that it receives adequate passenger footfall. This will help in keeping the fares on the lower side. Earlier, two global companies, American Maglev Technology Inc. and SwissRapide AG, conveyed to the government their interest in developing high-speed trains using magnetic levitation technology for India. Apart from these two, four Indian applicants-state-owned Bharat Heavy Electricals Ltd (Bhel) and three lesser known entities-had also responded to the expression of interest sought by the ministry for developing high-speed trains.
Maglev stands for magnetic levitation, and is a transport system that uses magnetic levitation to suspend and propel vehicles with magnets without touching the ground.  Globally, only a small number of countries have used the Maglev systems including Germany, China, Japan, South Korea and the US.

  
359 views
Dec 10 2016 (16:22)
Guest: 346f03b0   show all posts
Re# 2086664-1            Tags   Past Edits
News waale bdi jaldi udne lgte h

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jul 8
Trains with ARP 15 Dep on: Thu Jul 13
Trains with ARP 30 Dep on: Fri Jul 28
Trains with ARP 120 Dep on: Thu Oct 26

  
  

Rail News

  • GST most significant reform since Independence: Railway Minister Suresh Prabhu  News Entry# 306710
    by: rdb*^  Yesterday (22:37)


    CHENNAI: GST is the single largest and most significant reform post-Independence and is a great positive step in the right direction, Union Minister of Railways Suresh Prabhu said here on Saturday. The Union Minister was in the city to attend the 100th GST seminar organised by the Southern India Regional Council...
  • Anticipating crowds, Metro arranges rides every 7 mins  News Entry# 306709
    by: rdb*^  Yesterday (22:36)


    KOCHI: Anticipating large crowds this weekend, Kochi Metro Rail Ltd (KMRL) will operate services every seven minutes. The Metro agency said that services would begin at 8am on Sunday instead of 6am. By 7pm on Saturday, the Metro agency's collection rose to Rs 18.73 lakh, while the ridership for the day...
  • Kochi Metro: They have jobs but no place to stay  News Entry# 306708
    by: rdb*^  Yesterday (22:34)


    KOCHI: Kochi Metro's landmark decision to employ transgender persons may have garnered international attention, but closer home social stigma continues to determine matters. Nine of the 21 transgender persons who were given jobs by Kochi Metro Rail Ltd (KMRL) in the ticketing and housekeeping departments have not reported for duty since...
  • Driverless metro trains to start operations from October  News Entry# 306707
    by: rdb*^  Yesterday (22:33)


    HIGHLIGHTS This line is planned to be opened in stages between October 2017 and March 2018 As the corridor will witness the first operations of driverless trains, DMRC is not taking any chances and rigorous trials are being carried out File photo of driverless metro train getting ready at Mukundpur depot...
  • Metro rail tunnels to north Chennai by year-end  News Entry# 306706
    by: rdb*^  Yesterday (22:31)


    CHENNAI: Before the end of 2017, a part of north Chennai will be connected through metro rail tunnels. Work to build tunnels for a 1km stretch between Washermenpet and Korukkupet is on at full swing. Chennain Metro Rail Ltd (CMRL) officials said they will complete the construction of the tunnels in...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.