Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Feb 22, 2017 11:49:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Feb 22, 2017 11:49:07 IST

Blog Entry# 2092365  
Posted: Dec 16 2016 (07:32)

39 Responses
Last Response: Dec 17 2016 (01:37)
  
General Travel
0 Followers
1993 views
Dec 16 2016 (07:32)   12596/Anand Vihar Terminal - Gorakhpur Humsafar Express (Via Basti) | GKP/Gorakhpur Junction (10 PFs)

Rahul Raj   5 blog posts
Entry# 2092365            Tags   Past Edits
With diesel traction Humsafar overtaking kaifiyat, wbsk, jharkhand express in ndls-cnb is doubtful

34 posts - Fri Dec 16, 2016

  
609 views
Dec 16 2016 (19:43)
Abhishek Jaiswal   44776 blog posts   18340 correct pred (69% accurate)
Re# 2092365-35            Tags   Past Edits
press release padh lete to aisa na bolte.

  
629 views
Dec 16 2016 (19:43)
MS Dhoni Best in World😎😎~   2357 blog posts   47 correct pred (53% accurate)
Re# 2092365-36            Tags   Past Edits
njp shatabdi ko wdp4d tb milta tha jb 130 nhi tha mps shatabdi 130 hone ke baad sirf wdp4 hi haul kiya hai njp shatabdi.....wdp4d 130 nhi kr skta....mps only 110....yes tested hai 135 tk but 110 ke upar nhi jaa skta

  
605 views
Dec 16 2016 (19:45)
suraj prakash   6500 blog posts   6662 correct pred (74% accurate)
Re# 2092365-37            Tags   Past Edits
Aahh..chalo koi na...Agla wala Bet sahi maarunga...Haar-Jeet toh Juye ke khel ka part hai..;)

  
426 views
Dec 17 2016 (01:34)
GKP 12595↔12596 ANVT HumSafar Express 🚄~   840 blog posts
Re# 2092365-38            Tags   Past Edits
Yes bro doubly electrified route h gkp-lko bs ye via barhni loop line ne fhasa dia h isko

  
498 views
Dec 17 2016 (01:37)
GKP 12595↔12596 ANVT HumSafar Express 🚄~   840 blog posts
Re# 2092365-39            Tags   Past Edits
Agreed with u that is why I'm telling u that WDP4 is required for diesel traction which is truly impossible due to lack of WDP4 or simply give eloco is the only option

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Mar 4
Trains with ARP 15 Dep on: Thu Mar 9
Trains with ARP 30 Dep on: Fri Mar 24
Trains with ARP 120 Dep on: Thu Jun 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site