Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Apr 30, 2017 11:08:15 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Apr 30, 2017 11:08:15 IST

Blog Entry# 2094512  
Posted: Dec 17 2016 (21:01)

17 Responses
Last Response: Dec 18 2016 (14:04)
  
★  Info Update
0 Followers
2197 views
Dec 17 2016 (21:01)   KYND/Kalyandurga (2 PFs)

Foamer~   1803 blog posts
Entry# 2094512            Tags   Past Edits
The latest addition to IR network - Kalyandurga.
-
Yesterday the CRS inspection was completed. So today I went to this new station to click some pics and get the update on when the train services would start. Here are few pics.
-
Also
...
more...
please refer to /blog/post/2094517 for more info.
-
Pic 1 & 2 : Station Building.
Pic 3 & 4 : PF 1 boards on either side.
Pic 5: PF 2's board being painted.
Pic 6: Ticket counter.
Pic 7: PF 2 work on in full swing.
Pics 8 & 9: Finishing touches being given to waiting room.
Pics 10, 11 & 12 Recently concretised PF 1.
Pic 13: Track towards RDG.
Pic 14: Track towards TK.
Pics 15 & 16: Pending works being completed.
Pics 17 & 18: Distance from KYND to TK.
Pic 19: Approach road from Kalyandurga Ring road to station was concretised today.
-
P.S. The spelling in IRI needs to be corrected.

12 posts - Sat Dec 17, 2016

  
1474 views
Dec 17 2016 (22:12)
Foamer~   1803 blog posts
Re# 2094512-13            Tags   Past Edits
Yes BSB train skips RDG.
-
When completed it will be alternate line to GTL from SBC.
-
This part of Ananthapur is the most backward.
-
...
more...

Villagers were so excited that more than 100 were at station from different nearby villages. Many taking selfies. Some lying down on the cool mosaic floor of the waiting room and sleeping :)
-
Yesterday more than a thousand gathered to watch the train it seems. They thought I was another Hindi-officer from Hubli, like the ones who came yesterday.
-
Benefits:
1. These parts of KA and AP when you notice is like a jigsaw puzzle - Madakashira (surrounded on 3 sides by KA), Pavagada (surrounded by 3 sides by AP). Because of this weird geographical alignment not many buses ply due to permit problem, though this route is shortest between Bengaluru and Ballari. Trucks seem non-existent. Also parched land. Both state govts. give monthly subsistence - a few thousands rupees per family. Because of red tape drawing of water line too from Madhugiri is stuck.
In such situation they are all opting to travel to Chitradurga, Tumkur or Ananthapur, Hindupur for livelihood. This line will help them a lot in migration. So surely passengers will fill train.
-
2. Freight: The steel plants in around Ballari/Hosapete will benefit from this line. Also NMDC-Donimalai.

  
1459 views
Dec 17 2016 (22:15)
Foamer~   1803 blog posts
Re# 2094512-14            Tags   Past Edits
Not opening. Some error.
-
It's ok. Thanks.
-
Instead of unnamed road - can you please add Kalyandurga Ring Road.

  
Dec 17 2016 (22:25)
Foamer~   1803 blog posts
Re# 2094512-15            Tags   Past Edits
One intermediate station between RDG and KYND. I couldn't ascertain the name as no official was present. Just villagers, some of whom gave the name Avuladatla, some said Ramanepalli. Not sure.
-
The next stations which will come up are Kambadur - Pavagada - Madakasira - Madhugiri - Koratagere. These I am sure as the land has been acquired and compensation is yet to reach many.
-
...
more...

The station code of Kalyandurga too, I looked around but couldn't ascertain. I am going as per IRI's previous existing info.

  
1440 views
Dec 17 2016 (22:26)
IR no more Safe^~   20952 blog posts   96264 correct pred (75% accurate)
Re# 2094512-16            Tags   Past Edits
KYND/Kalyandurga is correct.
i have checked from official site, the link i gave u earlier.

  
1227 views
Dec 18 2016 (14:04)
Foamer~   1803 blog posts
Re# 2094512-17            Tags   Past Edits
This will become the 4th section in AP-TS region to be operated without completion of signalling and by token system.
5th, if Lingampet-Jagityal - Karimnagar section too is by token.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 10
Trains with ARP 15 Dep on: Mon May 15
Trains with ARP 30 Dep on: Tue May 30
Trains with ARP 120 Dep on: Mon Aug 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site