Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Thu Feb 23, 2017 12:46:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 12:46:27 IST

Blog Entry# 2096588  
Posted: Dec 19 2016 (18:47)

6 Responses
Last Response: Dec 24 2016 (14:37)
  
General Travel
0 Followers
2078 views
Dec 19 2016 (18:47)   15211/Jan Nayak Express (UnReserved) | SCC/Sitapur Cantt. (2 PFs) | CNB/WAP-4

shantanudutta34   1 blog posts
Entry# 2096588            Tags   Past Edits
electric loco in sitapur cantt

1 posts - Thu Dec 22, 2016

  
1687 views
Dec 22 2016 (09:17)
Koush12461^~   78715 blog posts   5089 correct pred (78% accurate)
Re# 2096588-2            Tags   Past Edits
What you trying to say ... Write full statement

  
1713 views
Dec 22 2016 (09:23)
passionatesandy~   1470 blog posts   166 correct pred (68% accurate)
Re# 2096588-3            Tags   Past Edits
if 15211/12 running with e loco .then it should have a traction change at gkp as it goes via narkatiagunj.previously it has a traction change at mb

  
1553 views
Dec 24 2016 (14:23)
GKP LKO Section 120kmph Sucessful Trail Done~   2401 blog posts   4 correct pred (100% accurate)
Re# 2096588-4            Tags   Past Edits
15209/15210 between ASR_BJU
15211/15212 between ASR_GKP
Above all four train is now on electric transaction👍

  
1574 views
Dec 24 2016 (14:25)
GKP LKO Section 120kmph Sucessful Trail Done~   2401 blog posts   4 correct pred (100% accurate)
Re# 2096588-5            Tags   Past Edits
But now change at Gorakhpur😊

  
1543 views
Dec 24 2016 (14:37)
shuk RAILWAY is my first crush~   557 blog posts   265 correct pred (55% accurate)
Re# 2096588-6            Tags   Past Edits
Bhai koi pic ho to bhejo

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site