Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Apr 25, 2017 15:54:31 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Apr 25, 2017 15:54:31 IST

Blog Entry# 2098189  
Posted: Dec 21 2016 (08:49)

16 Responses
Last Response: Dec 24 2016 (13:17)
  
Rail News
0 Followers
2434 views
New Facilities/TechnologySWR/South Western  -  
Dec 21 2016 (08:22)   Government may partially meet commuter rail demand

karbang~   152 news posts
Entry# 2098189   News Entry# 289230         Tags   Past Edits
Under public pressure to start a suburban train service in Bengaluru, the South Western Railway (SWR) is likely to introduce new trains on two existing lines that connect the city centre with the suburbs.
More trains could run from Bengaluru City to Bangarpet (via Whitefield) and Ramanagaram, given the feasibility to operate the services on the two lines. The two lines have been listed under Phase A, Stage 1, of the Bengaluru suburban railway project, whose detailed project report (DPR) was prepared by RITES, a Central government-owned engineering consultancy.
“After several rounds of
...
more...
discussion with the railways, it has been decided to introduce new trains on these lines on priority. This can be done faster using the existing infrastructure.
It’s also possible to add more trains on the Yeshwantpur-Tumakuru railway line,” a state government official, who oversees the city’s suburban project, told DH.
Phase A, Stage 1, entails introduction of seven new services or replacement of 15 existing conventional trains with Mainline Electric Multiple Unit (MEMU) trains. This will cost Rs 360 crore and needs the approval of the state Cabinet, he noted.
“Once the state government agrees to fund the project, it will take six to eight months to procure a rake (a group of coaches) and complete the signalling work. The electric-powered trains have engines and can move in both directions without having to take a turn like conventional trains,” the official said.
An extensive suburban train project for Bengaluru has been proposed to be spread over three stages and estimated to cost Rs 9,000 crore. It involves commuter train services from Bengaluru City to Hosur (41 km), Doddaballapur (37 km), Ramanagaram (46 km), Tumakuru (64 km), Chikkaballapur (57 km), Bangarpet (84 km) and Nelamangala (27 km).
According to K N Krishna Prasad of Karnataka Railway Vedike, all lines except the Lottegollahalli-Hosur stretch (via Hebbal and Banaswadi) are doubled and electrified, which makes it easy to introduce the suburban train services.
Urban mobility analyst Sanjeev Dyamannavar, however, said more commuter trains on the two routes would be of little help unless the railways prioritised them over outbound services. “Besides conventional passenger trains, the city has three MEMU and DEMU trains each. It would be difficult for people to switch to commuter services unless the SWR increases their frequency,” he added.

9 posts - Wed Dec 21, 2016

2 posts - Thu Dec 22, 2016

  
893 views
Dec 22 2016 (21:58)
Prometh Suresh~   187 blog posts   259 correct pred (69% accurate)
Re# 2098189-12            Tags   Past Edits
no chance for what?

  
851 views
Dec 23 2016 (10:16)
Mazi IRI   675 blog posts
Re# 2098189-13            Tags   Past Edits
CRS inspection of Bangaluru Maysuru electrification....

  
775 views
Dec 23 2016 (15:30)
Prometh Suresh~   187 blog posts   259 correct pred (69% accurate)
Re# 2098189-14            Tags   Past Edits
It will take minimum 6 months.

  
709 views
Dec 23 2016 (21:04)
Mazi IRI   675 blog posts
Re# 2098189-15            Tags   Past Edits
ok thanks...

  
3734 views
Dec 24 2016 (13:17)
Prometh Suresh~   187 blog posts   259 correct pred (69% accurate)
Re# 2098189-16            Tags   Past Edits
welcome

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri May 5
Trains with ARP 15 Dep on: Wed May 10
Trains with ARP 30 Dep on: Thu May 25
Trains with ARP 120 Dep on: Wed Aug 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site