No RSA. Coaches available with SWR were used. SWR didnt get any LHB sleeper coaches AFAIK. These maybe ICF made coaches. Easy for transit to YPR. So they would have used these coaches for the inaugural run. Even TVC Mail is running with ER/CR coaches.