Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 25, 2017 03:03:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 25, 2017 03:03:43 IST

Blog Entry# 220703  
Posted: Aug 15 2011 (17:29)

35 Responses
Last Response: Mar 02 2012 (18:09)
  
1 Followers
3710 views
Aug 15 2011 (17:29)   17023/Tungabhadra Express
 

Guest: 3fbe7773   show all posts
Entry# 220703            Tags   Past Edits
The only intercity train to rayalaseems from Hyderabad city. I traveled by this train on 13 AUG from secunderbad to Kurnool. Traveled in CC along with my friend. Started at secunderabad at 7:33 am to its way to kurnool. This trains has a nice CC coach, plug points working fine. AC effect is almost ok. Even toilets also clean and good. The loco in charge was WDP4. When i booked the train on there are so many seats available but by the time it started all are full. Even general all jam packed. After its start stopped at KCG, in this route this is the slow train. So as expected it has so many stops. But for my surprise it stopped almost in every station. Very slow to its way to Kurnool. Reached Kurnool almost 30 min late. As i want to go 5 th Sakthi peet Alampur Jogulamba of Astadhasa...
more...
shakthi peets of india. I reached the nearest station Kurnool which is 30 km way. But actually there is halt for this express and passengers trains at a station called "Jogumamba halt" it has no platform so i am not able to recognize it, even it has no station code, IR has no information about it. But i have seen the board while i am going to Temple. I will post the pics and timings of that station.
Its difficult to get any to eat in this train so its better people arrange their food if they want to take this train. Even water bottles also hard to get. I took same train in return on aug 14 from kurnool. This time also CC only. But this time coach was very very old. Worst one. Hauled by WDP4, this time to SC its blasted it reaches 7:15 pm at Malakpet. As i have some work i got down there to go my home.
But it was a real nice trip. But i feel for a intercity it should much faster. I will post the pics of temple and the river Tungabadra.
Loco -- WDP4
Speed ---- 2.5/5
Cleanliness ----- 3/5
Comfort ----- 2.5/5
Over all 2.5/5

5 posts are hidden.

  
2254 views
Aug 15 2011 (17:47)
Guest: 84a4f8a4   show all posts
Re# 220703-7            Tags   Past Edits
So, it was hauled by WDP-4 as we seen earlier. Admins Please update the loco to WDP-4. As seen so many times. The loco was upgraded to WDM to WDP-4 :)

29 posts are hidden.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Feb 4
Trains with ARP 15 Dep on: Thu Feb 9
Trains with ARP 30 Dep on: Fri Feb 24
Trains with ARP 120 Dep on: Thu May 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2136570
    Yesterday (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
  • Entry# 2126247
    Jan 13 (11:57PM)


    Here are some guidelines for members regarding the new Report button and the revamped FM system: 1. If you have ANY complaint about a blog or ANY other issues, please USE the Report button and file a Complaint. Most complaints are resolved by FMs within seconds/minutes. (Some require further discussion). FMs have...
  • Entry# 2125399
    Jan 13 (08:58AM)


    Often we have some TL Entries seemingly in WaitList forever. Usually, the reason for this is that TLMs have already looked at the TL Entry but are not confident enough to Confirm it or are looking for more inputs from the Member regarding the source, etc. And this delay eventually causes...
  • Entry# 2122843
    Jan 10 (10:15PM)


    This is to address persistent and lingering questions about FM Appointments: . 1. Being an FM is a service. It is NOT supposed to be some kind of "reward" or "medal" to "deserving" members. The ULTIMATE OBJECTIVE of the process is to promptly handle/look into Reports filed by members, which is expected to...
Scroll to Top
Scroll to Bottom


Go to Mobile site