Electrification is there till Takkolam. Due to the presence of INS Rajali in right side of the track, it is still a diesel line. The Navy has agreed to give SR a total of 60 crore for the construction of the new line. However they have given only 30 crore. Once the second installment has been made, the new line can constructed