Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Apr 25 02:12:11 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 2243226
Posted: Apr 20 2017 (15:02)

5 Responses
Last Response: Apr 26 2017 (06:15)
Rail News
4425 views
0

New Facilities/Technology
SECR/South East Central
Apr 20 2017 (07:50)   दुर्ग स्टेशन की तीन लिफ्ट तैयार, जल्द होंगी शुरू

AdittyaaSharma^~   67187 news posts
Entry# 2243226   News Entry# 300131         Tags   Past Edits
दुर्ग रेलवे स्टेशन के यात्रियों को जल्द ही तीन लिफ्ट की सुविधा मिलने जा रही है। लिफ्ट तैयार हो चुकी हैं और सप्ताहभर में शुरू हो...

1 Public Posts - Thu Apr 20, 2017

1 Public Posts - Fri Apr 21, 2017

2870 views
0

Apr 22 2017 (12:13)
A2Z~
A2Z~   17505 blog posts
Re# 2243226-3              
- ******* (DURG-BHILAI Requirements) *****
* Dear friend, Durg caters to a large number of people working in Bhilai Steel Plant (approx 70,000-80,000 employees+contractor labours) and most of them belonging to other states of our country (esp. UP, Bihar, Andhra, WB, Kerala, TN, etc and including almost every state) who frequently visit their home town and need rly connectivity. Hence, there is definte requirement for Durg station which stands in same league as Raipur & Bilaspur is there.
* Durg have very good connectivity for direct trains to Bihar & Eastern
...
more...
UP, but not so good for connectivity to western UP. It does not have direct connectivity to LKO.
* Large number of people board connecting trains at Raipur, NGP etc for want of direct connectivity/ availability of reservation. But it is not getting due attention from IR as it is not a Rly HQ unlike BSP (zonal HQ) & R (Div.HQ & state capital).
- ****** second Entry to DURG RS *****
Probably a single window ticketing counter operates from the North side of Durg station which cannot be called 2nd entry. Second entry means provision of platform, parking stand etc so that paxs can board the trains from that entry. Some long distance trains too should halt at the Northern Side platform (Nos. 4-5). More population (about 7 lacs) reside on Northern side of Durg station esp. in newly developing educational & residential area (Bhilai). These people board long distance train from Main entry resulting in crowding in narrow street leading to Durg RS.
-**** Coaching Complex *******
* Maroda coaching complex shall be a very good development, hope fully shall lead to more trains originating from Durg.
* I have not come across Official communication from IR about Maroda Coaching complex, but other sources are giving confirmation about development in Maroda.
- **** LTT - BBS/PUI Exp Stoppage *****
* There is a direct train from Durg-CTC/BBS/PUI originating at evening, but 12879/80 LTT-BBS Biweekly Exp & 12865/66 LTT-PUI Biweekly Exp leave from Mumbai at noon and all the regular trains for Durg depart from Mumbai at night and one at 6:00 am(Geetanjali). This is only train departing during day hours i.e. noon. This train morning time when there is no train and also in reverse direction all the regular trains depart for Mumbai from morning till noon (Gnaneswari 12:25) and this train departs for Mumbai in 19:55 (timing of Hatia-LTT sharing the slot from LTT-JSG)
* Stoppage of these 12879/80, 12865/66 trains at Durg is justified just
(1) due to its unique timings in both directions at Durg station
(2) due to high traffic from Durg-Bhilai (Earnings from R, BSP, Durg0Bhiali are in same league.
(3) due to fact that these trains stop at much smaller stations with much lesser revenue enroute. Durg deserve stoppage of all trains except Durontos, even Pune-Kamakhya Suvidha having lesser stop than these trains stop at Durg.
(4) due to fact that LTT-Hatia/VSKP trains sharing same timeslot stop at Durg
(5) due to fact due to fact that if your logic of denying a stoppage just for already having train connectivity is applied to all the trains all over the country, then a large number of stops to a large number of trains shall not be justified.
- **** stoppage LTT-Kamakhya Exp ****
* If IR does not think Durg important enough to give stoppage of Mumbai-Kamakhya train which stops at a station like Raigarh & Gondia, expecting a train originating from DURG to Kamakhya is just a wishful thinking.
* The stoppage of LTT-Kamakhya Exp at Durg should come first, then there is question of introducing Durg-GHY new train,
* I think increasing the frequency of this train with stoppage at Durg is a better option than having new Durg-Kamakhya new weekly train which may not get as good patronage as LTT-KYQ train.
- ******** LKO-R GR ******
* Survey for Durg-LKO& GHY/Dibrugarh train was conducted and a requirement of train was felt. But R-LKO GR and LTT-KYQ without a stoppage at Durg were introduced!
* R GR is an unsuccessful train as it runs with only 10ACIII coaches. GR runs full only during season days and not during off season
* a large number of people from UP and working at Bhilai steel plant board this train from R
* It should be extended by just 37 kms to serve No.2 city of chhatisgarh i.e. Bhilai-Durg(12 lacs population) so that it could get more paxs and can be augmented by a few coaches which could improve the profitability of the train.
- **** KOP-G extn to DURG ****
* Timing of KOP-G if extended to Durg is not bad. This train runs with just 19 coaches, which should be augmented to 22/24 coaches and extended to Durg (135kms) for additional traffic on extension.
* G-KOP timing is: G dep. 8:20 KOP arr 12:45 should be
Durg-KOP timing should be: DURG dep 6:10 G arr 8:10 dep 8:20 KOP arr 12:45
* KOP-G timing is: KOP dep. 15:30 NGP arr 17:20 dep 17:40 G 20:15, should be
KOP-DURG 15:30 NGP 17:20-17:40 G 19:50-20:00 Durg 22:00
-
* It is worth mention that Durg Rly Stn generated Rs 70 crores (& 33+ crores from Bhilai extra) through passenger and parcel revenue in 2014-15 i.e. qualify for highest A1 category of station. The revenue for should in 2016-17 should be about Rs 85-90 crores of Durg+40 crores of Bhilai. This industrial twincity is a member of top 50 club in India in matter of population as well as passenger revenue of station.
* I feel a lot of requirements are there at Durg, but if some residents of Durg does not need more facilities, then probably IR is right to deny more facilities which a Durg station & Bhilai-Durg twincity (12 lac population) which is aptly called "Mini-India", should deserve.

Translate to English
Translate to Hindi

2 Public Posts - Wed Apr 26, 2017

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy