Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Wed Sep 3, 2014 10:15:20 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

Blog Entry# 227974  
Posted: Aug 27 2011 (10:12PM)

27 Responses
Last Response: Aug 28 2011 (8:06PM)
1 Followers
5348 views
Aug 27 2011 (10:12PM)   18311/Sambalpur Varanasi Express        
 

Guest: 7fe604a4   show all posts
Entry# 227974               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
There is no train from Visakhapatnam to connect Ganges. One special train was introduced recently from VSKP to Allahabad but it is discontinued now. When we visited Varanasi and Allahabad sometime back from Visakhapatnam, we had some difficulties catching connecting trains at Raipur on one way and at Ranchi from the other way. I found lot of people (piligrims) at Allahabad and Varanasi from Andhra coastal regions. I am sure they too might have had some difficulties or might have travelled on longer routes wasting lots of time. I do not know if 18311 can be extended to Visakhapatnam because of any operational difficulties but some new train to Varanasi or Haridwar (Via Raipur, Katni) from VSKP would ease people's travel from this region.

4782 views
Aug 28 2011 (12:09AM)        

Subhash Dhavala**   5049 blog posts   3854 correct pred (60% accurate)  
Re# 227974-13               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I hope there was a train announced from vskp to Jammu I hope thsi should cover all thye north indian states

11 posts - Sat Aug 27, 2011 - are hidden. Click to open.

6 posts - Sun Aug 28, 2011 - are hidden. Click to open.

17119 views
Aug 28 2011 (11:49AM)        

rdb**   20428 blog posts   250115 correct pred (77% accurate)  
Re# 227974-20               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
For ECoR:
click here
click here
click here
GRIEVANCES REDRESSAL ORGANISATION FUNCTIONING IN THE EAST COAST RAILWAY
Sl.No. Place Designated authority Telephone Numbers
1 East Coast Railway Headquarters at Chandrasekharpur, Bhubaneswar-751023. Director of Grievances & Sr. Dy.General Manager. 0674-2300230
2 Divisional HQ at Khurda Road.Pin-752050 Divisional Director of Grievances & Addl.Divisional Railway Manager. 0674-2490264
3 Divisional HQ at Sambalpur. Pin-768002 Divisional Director of Grievances & Addl.Divisional Railway Manager. 0663-2405312
4 Divisional HQ at
...
Read more...
Visakhapatnam. Pin-530004 Divisional Director of Grievances & Addl.Divisional Railway Manager. 0891-2746202
The Email Address in which complaint can be lodged in East Coast Railway Zone is dgm@eastcoastrailwaymail.com

17099 views
Aug 28 2011 (11:52AM)        

rdb**   20428 blog posts   250115 correct pred (77% accurate)  
Re# 227974-21               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

4999 views
Aug 28 2011 (11:59AM)        

Kishor CBE chain 1Σ17262 19275 14795 19330**   3798 blog posts   122 correct pred (62% accurate)  
Re# 227974-22               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Thank you for your essential information:
this is added to FAQ:
name title: GRIEVANCES REDRESSAL ORGANISATION FUNCTIONING IN THE EAST COAST RAILWAY
category: General.
On similar lines entry thread 227974-21 too is added with addition of 'SCR south central railway'.
Please give rest of the links if possible, so that we have 'complete database on 'greavance redressal authorities'
Thank you.

4985 views
Aug 28 2011 (12:12PM)        

Guest: 455d5fb3   show all posts
Re# 227974-23               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
the present spl train VSKP-ALD couldn't get further extension as clearance is pending from ALD Zone and operational problems like availability of platforms and maintenance issues.

4991 views
Aug 28 2011 (12:17PM)        

Guest: 3fbe7773   show all posts
Re# 227974-24               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

Here is SCR feed back link
click here
Even they have effective SMS feed back system also...try this too.
click here
SALIENT FEATURES
1. Complaint/suggestion can be registered at 8121281212 by sending an SMS
2. In response, an automated acknowledgement with a unique ID will be sent as an SMS
3. With the unique ID, passenger can know the status of the complaint by sending SMS:-
...
Read more...
"STATUS < SPACE > < REFERENCE ID>"
to 8121281212
or by logging on our website-www.scrailway.gov.in
4. Final reply will be sent through an SMS and will also be available on our website- www.scrailway.gov.in

4962 views
Aug 28 2011 (12:28PM)        

WDG 3A TNP 14616   2465 blog posts   58 correct pred (63% accurate)  
Re# 227974-25               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
you r right

4948 views
Aug 28 2011 (12:31PM)        

Guest: 455d5fb3   show all posts
Re# 227974-26               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I think it will surely come in the next budget, if the counterparts in ALD put pressure on North Central railway authorities.

4924 views
Aug 28 2011 (2:30PM)        

Divert ShalimarGorakhpur Express via BKSC**   3406 blog posts   2237 correct pred (75% accurate)  
Re# 227974-27               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
there is already 18311/18312 SBP-BSB Exp

4870 views
Aug 28 2011 (7:44PM)        

Saurabh*^   6105 blog posts   2358 correct pred (71% accurate)  
Re# 227974-28               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
for ncr allahabad zone
Important telephone no..
click here
feedback
click here
Public Grievance Redressal Machinery of NCR
click here

4834 views
Aug 28 2011 (8:06PM)        

Guest: 455d5403   show all posts
Re# 227974-29               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
representation made with NCR

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 13, 2014
Trains with ARP 30 Dep on: Fri Oct 3, 2014
Trains with ARP 60 Dep on: Sun Nov 2, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1204822
    Yesterday (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
Scroll to Top
Scroll to Bottom