Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Wed Jul 30, 2014 06:27:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Aug 9, 2014
Trains with ARP 30 Dep on: Fri Aug 29, 2014
Trains with ARP 60 Dep on: Sun Sep 28, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Entry# 240062  
Posted: Sep 19 2011 (12:00PM)

7 Responses
Last Response: Sep 19 2011 (1:27PM)
0 Followers
2550 views
Sep 19 2011 (12:00PM)   22620/Tirunelveli - Bilaspur SF Express        
 

Guest: 7fcfa4a1   show all posts
Entry# 240062               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
This train should go via Madurai, Thiruchirappalli, Chennai Egmore, etc. to reach Bilaspur. It will help for the people from Madurai & Thiruchirappalli to reach Bilaspur.

2525 views
Sep 19 2011 (12:06PM)        

Journey from 9W to EK**   3507 blog posts   13828 correct pred (69% accurate)  
Re# 240062-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
railway ministry will give preference to kerala only... they won't give preference to tamilnadu... and specially south tamilnadu they won't give preference

2518 views
Sep 19 2011 (12:13PM)        

PKV**   17526 blog posts   35 correct pred (78% accurate)  
Re# 240062-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Sir, I think Tirunelveli has been made a terminal for this train by default because of insufficient capacity at TVC/KCVL. To cater to the needs of Tamilnadu IR should have a separate train on the route suggested by the guest blogger or maybe the present Chennai-Bilaspur Express can be extended to Tirunelveli on that route.

2508 views
Sep 19 2011 (12:19PM)        

Journey from 9W to EK**   3507 blog posts   13828 correct pred (69% accurate)  
Re# 240062-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
first they have to put double track frm villupuram to kanyakumari............. this project only not finished... IR is telling it will finish now and then..........but no result till now....bcoz of this reason most of the train are running via kerala and its reaching kanyakumari, nagercoil and tirunelveli

2455 views
Sep 19 2011 (12:54PM)        

Guest: 7f611c19   show all posts
Re# 240062-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
s sir you are correct. there are other train that are extended to TEN/ Nagarcoil due this reason..
Happa Tirunelveli Express
Gandhidam Nagarkoil Express
Shalimar nagarkoil xpress

2426 views
Sep 19 2011 (1:09PM)        

Guest: 5a9b7b28   show all posts
Re# 240062-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
hi roshan sir, gandhidhan nagercoil is not extended, the train is already running from many year from nagercoil to gandhidham.

2401 views
Sep 19 2011 (1:25PM)        

Guest: 78e16b19   show all posts
Re# 240062-7               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
sir it was initially plannd to run between TVC and Gandhidam. Since tvc station was saturated and KCVL was not developed, it was made to extend till Nagarcoil. So the train started its run from Nagarkoil instead of TVC

2394 views
Sep 19 2011 (1:27PM)        

Guest: 5a9b7b28   show all posts
Re# 240062-8               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
but the train is running from nearly 15 years from nagercoil to gandhidham i have travelled many times in this train.
Scroll to Top
Scroll to Bottom