As railway electrification is not yet sanctioned ( Bhigwan - Gulbarga) ..272 Km.
But electrification has completed till bhigwan and other side Till gulbarga .
So CR is Striving to complete Doubling first and then electrification will start. of this patch.
this patch will get completely double till 2021 approx.
Due...
more... to Which many trains are still running with D loco. in FEDL route.
or some are having LC at WADI /DD.
As of this 272 km gets electrify than LC can be avoided .
Electrification must start of the existing line. Simultaneously Doubling will go on.
80%
16
Fisrt doubling must complete and than electrification must begin