Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Apr 28, 2017 02:16:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Apr 28, 2017 02:16:10 IST

Blog Entry# 346284  
Posted: Feb 09 2012 (16:45)

112 Responses
Last Response: Mar 02 2012 (23:11)
  
★★  
2 Followers
10844 views
Feb 09 2012 (16:45)   HYB/Hyderabad Deccan Nampally (6 PFs)
 

Guest: 795d062a   show all posts
Entry# 346284            Tags   Past Edits
*****
Here is the some of proposed AP important railways lines. Which reduces the pressure of HWH-MAS,HWH-MAS,BBS,VSKP-SC,MUMBAI railway routes. Also new trains can be run via these routes which helps for these india mail routes.
New routes are in blue color. All proposed in various budgets and line survey also done nothing i have given newly. Some of the lines already under construction. All these routes are under from 500crs to 1500cr budget only not more than that like our speed trains. These line not only helps AP also whole
...
more...
india by reducing pressure of mainlines which are built 100 years ago.
These route are given below.
*****
1.Kovvur-Badrachalam
2.Manuguru-Ramagundam
3.Kotipalli-Narasapur
4.Repalle-Machilipatnam/Gudivada
5.Giddalur-Hossam
6.Gadwal-Raichur
7.Vishupuram-Jaggayyapeta
8.Jagityal-Nizamabad
9.Kirandul-Manuguru
****
High budget routes of AP will follow.

85 posts are hidden.

  
2004 views
Feb 29 2012 (00:17)
Amjad Ali Khan*^~   6374 blog posts   103236 correct pred (68% accurate)
Re# 346284-103            Tags   Past Edits
There is not at all any place to build extra tracks for these train. There are only 4 platforms at Nellore and there is no water filling facility. There's a small town called Kovur and with a small distance of 6 kms from Nellore. And there is enough space to build any of the Tracks everything. If they develop kovur with all facilities. Then as discussed Intercities and Overnight expresses are possible.

24 posts are hidden.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon May 8
Trains with ARP 15 Dep on: Sat May 13
Trains with ARP 30 Dep on: Sun May 28
Trains with ARP 120 Dep on: Sat Aug 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site