Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Wed Sep 3, 2014 07:48:02 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

Blog Entry# 386102  
Posted: Apr 01 2012 (4:23PM)

17 Responses
Last Response: Feb 18 2013 (10:45AM)
1 Followers
1280 views
Apr 01 2012 (4:23PM)           
 

Subhash Singh   13 blog posts     Ph:+919391111580
Entry# 386102               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
can any1 please guide me how to book a spl coach of a train to accommodate all your family members around 100 to board a train for attending a marriage...
I want to book it from howrah to tatanagar on june 23rd.

Apr 01 2012 (4:57PM)        
 

broad gauge**   22200 blog posts   9651 correct pred (87% accurate)  
Re# 386102-10               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
on a serious note...
I had booked a sleeper coach from sbg to pnbe in er...
The following steps was done by me-
1.met station master of sbg,er
2.he asked me to write to chief passenger transportation manager
3.i did it 2 months in advance(rule is from 6 months to 1month in advance)
4.the application had train no.in which extra sleeper coach intended,date,total expected passenger and cause
5.the letter was sent for approval and i was called after 3 days
...
Read more...
6.after 3 days my letter was rejected
7.reason being i had asked for brahmaputra mail,a nr train,and no extra coaches could be attached as it was running upto its "full limit"
8.i was suggested farakka express
9.i agreed and paid rs.50000,as security fee
10.i was called after 10days for remaining fare
11.after 10 days i had to pay up and down fares for 72 passengers for 500km(the minimum chargeable distance for reserved coach,though sbg to pnbe is 298km)
12.two days prior to journey my extra coach was stationed at sbg
13.on the day of bookin farakka express became 13 hours late
14.i rcvd a call from drm mldt that do i want any alternate train
15.i opted for sdah bsb express
16.the coach was attached and we boarded and decorated the coach at sbg
17.coach was detached at dnr
18.same for reverse
19.on returning rly staff came and checked whether all the fans and other fittings were in place
20.after 7 days i was called and refunded my security by cheque
21.railways were thankful to me instead of me being thankful to them.....

12 posts - Sun Apr 01, 2012 - are hidden. Click to open.

3 posts - Tue Apr 03, 2012 - are hidden. Click to open.

587 views
Feb 18 2013 (10:44AM)        

Kishor CBE chain 1Σ17262 19275 14795 19330**   3798 blog posts   122 correct pred (62% accurate)  
Re# 386102-16               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Blog Entry Unlocked.
Public interest...

554 views
Feb 18 2013 (10:45AM)        

Kishor CBE chain 1Σ17262 19275 14795 19330**   3798 blog posts   122 correct pred (62% accurate)  
Re# 386102-17               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
This is referred to : /blog/post/673177
[/members/profile/87001|/members/profile/87001
Blog is written for easy understanding and lucidly...
Thanks BG

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 13, 2014
Trains with ARP 30 Dep on: Fri Oct 3, 2014
Trains with ARP 60 Dep on: Sun Nov 2, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1204822
    Yesterday (07:04PM)


    With the roll out of new TTs, we are introducing 3 new enhancements: . 1. "To Be Introduced" trains: As the title implies, Admins may add Trains that are announced in the Budget and Not yet introduced, to this list, with WHATEVER tentative TT is available, and whatever sketchy or vague information...
  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
Scroll to Top
Scroll to Bottom