Timeline UpdatesTrip UpdatesNews PostsPvt PostsPvt PostsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Thu Jul 31, 2014 19:00:44 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
PNR Super Search
PNR Entry# 404853  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Mon Apr 23, 2012 @ 15:00
12614/Tippu Express
Entry# 404853
 
   Posted by: APS**   3329 blog posts   17 correct pred (55% accurate)
PNR: 485-xxxxxxx (PRS)   |   Chair Car - CC   |   Tot Seats: Avbl >59   |   Charting: < 11:01   |   Similar PNRs
SBC/Bangalore City Junction   to   MYS/Mysore Junction   |   137 km / 137 km
Original Status as of: Apr 23 2012 (9:58AM)
Passenger 1: Confirmed (Booking Status: C1,65,GN)
Passenger 2: Confirmed (Booking Status: C1,64,GN)
Passenger 3: Confirmed (Booking Status: C1,57,GN)
Passenger 4: Confirmed (Booking Status: C1,34,GN)
Chart NOT Prepared

I plan to log this trip thru my BSNL data Card. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status as of: Apr 23 2012 (3:29PM)
Passenger 1: C1,65 (Booking Status: C1,65,GN)
Passenger 2: C1,64 (Booking Status: C1,64,GN)
Passenger 3: C1,57 (Booking Status: C1,57,GN)
Passenger 4: C1,34 (Booking Status: C1,34,GN)
Chart PREPARED

929 views
Apr 23 2012 (3:20PM)        

APS**   3329 blog posts   17 correct pred (55% accurate)     Ph:+919435268733
Re# 404853-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
train running at optimum speed.
my berths were scatterd .
I exchanged 63 with 65
& 33 with 57

919 views
Apr 23 2012 (3:26PM)        

APS**   3329 blog posts   17 correct pred (55% accurate)     Ph:+919435268733
Re# 404853-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
IN the train TIPPU Exp is not written.
Its Dharwad-bangalore-Mysore
i was confused.

979 views
Apr 23 2012 (3:27PM)        

mesatyaswarooparrow215   4 blog posts   12 correct pred (44% accurate)  
Re# 404853-3               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
ghumo ghumo

968 views
Apr 23 2012 (3:27PM)        

APS**   3329 blog posts   17 correct pred (55% accurate)     Ph:+919435268733
Re# 404853-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
now it is running in speed.......

981 views
Apr 23 2012 (3:28PM)        

Murder of the Legend 12639*^   19882 blog posts   7264 correct pred (63% accurate)  
Re# 404853-5               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
The RSA board for this train is always confusing! BTW train left on time??
They actually have 2 boards-one as Dharwar-Bangalore-Mysore(siddhaganga-Tippu RSA) and other as Mysore-Bangalore-Shimoga(Tippu-SMET intercity board)-they dont mention tippu or siddhaganga anywhere-in mid stations even announcers confuse us by calling Mysore-dharwar Express is entering the platform

968 views
Apr 23 2012 (3:32PM)        

Anand Nambyar**   6150 blog posts   5909 correct pred (62% accurate)  
Re# 404853-6               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
wish u a happy journey, howz your dad's health now ?

1809 views
Apr 23 2012 (3:47PM)        

APS**   3329 blog posts   17 correct pred (55% accurate)     Ph:+919435268733
Re# 404853-7               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
I can see lots of coconut trees outside.
but the coach is old & not comfortable.
2 TV sets attached , But not working

3409 views
Apr 23 2012 (3:52PM)        

APS**   3329 blog posts   17 correct pred (55% accurate)     Ph:+919435268733
Re# 404853-8               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
train left on time

4980 views
Apr 23 2012 (3:53PM)        

APS**   3329 blog posts   17 correct pred (55% accurate)     Ph:+919435268733
Re# 404853-9               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Papa is fine now. Sleeping in cold atmosphere. Actually i could not bear the heat in bangalore

4979 views
Apr 23 2012 (3:55PM)        

Anand Nambyar**   6150 blog posts   5909 correct pred (62% accurate)  
Re# 404853-10               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
nice to hear that

3332 views
Apr 27 2012 (7:47PM)        

Gopal**   12196 blog posts   17528 correct pred (72% accurate)  
Re# 404853-11               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Sir,How is your Dad now?

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 10, 2014
Trains with ARP 30 Dep on: Sat Aug 30, 2014
Trains with ARP 60 Dep on: Mon Sep 29, 2014

  
  

Rail News

  • 50 मिनट में गंगानगर  News Entry# 187669
    by: IRF  Today (6:29PM)


    हनुमानगढ़। रोडवेज बसों के पहिए बुधवार को पूरी तरह से थमे रहे लेकिन हनुमानगढ़-श्रीगंगानगर रेलवे मार्ग पर चलने वाली ट्रेनों की रफ्तार बढ़ने से यात्रियों को राहत मिली। बुधवार को इस रेल मार्ग पर 100 किमी प्रति घंटे की रफ्तार से ट्रेनें चली। इससे पूर्व में इस मार्ग पर 50...
  • हाइस्पीड ट्रेन नहीं चल पाई तय गति से  News Entry# 187668
    by: Jayashree▪◘▪Amita**  Today (6:18PM)


    कुछ दिनों पूर्व दिल्ली से आगरा के बीच चलाई गई सेमी हाइस्पीड ट्रेन ने आधी दूरी भी 160 किलोमीटर प्रति घंटा की गति से तय नहीं की थी। लगभग 200 किलोमीटर के इस ट्रैक पर दिल्ली से आगरा के बीच पड़ने वाले कई जर्जर पुलों, पटरियों पर तीखे घुमाव व...
  • नई ट्रेन सेवा से माता वैष्‍णो देवी जाने वाले श्रद्धालुओं में भारी वृद्धि  News Entry# 187667
    by: Jayashree▪◘▪Amita**  Today (6:17PM)


    जम्‍मू : माता वैष्णो देवी के लिए सीधी रेल सेवा शुरू हो जाने के बाद यहां आने वाले श्रधालुओ की संख्या में भारी वृद्धि हो रही है। प्रधानमंत्री नरेंद्र मोदी की ओर से चार जुलाई को रेल सेवा का उद्धघाटन किए जाने के बाद 60 हजार से भी ज्यादा श्रद्धालु...
  • जयपुर-बांदीकुई के बीच शीघ्र ही चलेगी डीएमयू ट्रेन  News Entry# 187666
    by: IRF  Today (6:10PM)


    बांदीकुई | डीआरएमवीरेंद्र कुमार ने कहा कि शीघ्र ही जयपुर-बांदीकुई के बीच डीएमयू ट्रेन का संचालन शुरु किया जा रहा है। इससे यात्रियों को फायदा मिलेगा। पत्रकार वार्ता के दौरान डीआरएम ने कहा कि इसके लिए पहले ट्रायल हो चुका है। हमने डीएमयू ट्रेन के रेक को ठीक करने भेजा...
  • Railways to Install 5000 more Automatic Ticket Vending Machines at Stations  News Entry# 187665
    by: Jayashree▪◘▪Amita**  Today (6:09PM)


    New Delhi: Automatic Ticket Vending Machines operated by Smart Card are already functional over Indian Railways. It is proposed to add another 5000 such machines across all zonal railways, out of which 2000 will be coin operated and 3000 smart cart operated. The procurement will start from this financial year. 
    ...

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Scroll to Top
Scroll to Bottom