Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Tue Jul 29, 2014 10:07:25 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Aug 8, 2014
Trains with ARP 30 Dep on: Thu Aug 28, 2014
Trains with ARP 60 Dep on: Sat Sep 27, 2014

  
  

Rail News

  • कानपुर मेट्रो की डीपीआर में फंसा फंडिंग का पेच  News Entry# 187387
    by: sv  Today (9:55AM)


    अप्रूवल के लिए केंद्र को इस महीने भेजेंगे प्रपोजल, करोड़ों रुपये का है खर्च• वरिष्ठ संवाददाता, कानपुर
    प्रदेश सरकार ने भले ही कानपुर में मेट्रो प्रोजेक्ट के लिए केडीए को डीपीआर बनवाने का आदेश दिया है, लेकिन फिलहाल यह इतना आसान...
  • लालकुआं एक्स.के 4 कोच पटरी से उतरे  News Entry# 187386
    by: sv  Today (9:53AM)


    प्रमुख संवाददाता, लखनऊ डालीगंज स्टेशन पर ट्रेन बेपटरी होने के बाद यात्रियों को पैदल ही जाना पड़ा।
    डालीगंज स्टेशन के प्लेटफार्म पर सोमवार रात एक गाय व सांड़ लड़ते-लड़ते सिटी स्टेशन की ओर से आ रही लालकुआं एक्सप्रेस के इंजन से...
  • ट्रेन में रातभर सहमे रहे यात्री  News Entry# 187385
    by: sv  Today (9:46AM)


    किसी ने नहीं देखा हत्यारों को
    बुजुर्ग महिलाओं ने दिया युवतियों को सहारा
    आश्चर्य यह है कि रात एस-3 कोच के अन्य यात्रियों ने हत्यारे को देखने या फिर युवक की चीख...
  • लखनऊ मेट्रो का काम अक्टूबर से  News Entry# 187384
    by: sv  Today (9:43AM)


    संवाददाता, लखनऊ : मेट्रो का काम एक महीने और लेट होने के संकेत मिल रहे हैं। लखनऊ मेट्रो रेल कारपोरेशन की तरफ से सितंबर में काम शुरू करने के संकेत दिए जा रहे थे लेकिन अब ऐसा होता नहीं दिख रहा। विकास प्राधिकरणों की मुख्य सचिव आलोक रंजन के साथ...
  • पांच साल में AC होंगे स्लीपर डिब्बे!  News Entry# 187383
    by: sv  Today (9:39AM)


    दक्षिण रेलवे ने की पहल, एक स्लीपर कोच को एसी-3 में बदला• टीएनएन, कोच्चि
    अब वह दिन दूर नहीं है, जब ट्रेन में आम यात्रियों की पहली पसंद स्लीपर डिब्बे एसी कोच में तब्दील हो जाएंगे। दक्षिण रेलवे ने इसकी पहल...

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Entry# 407242  
Posted: Apr 25 2012 (3:31PM)

23 Responses
Last Response: Apr 27 2012 (7:40AM)
0 Followers
1022 views
Apr 25 2012 (3:31PM)   12228/Indore-Mumbai Central AC Duronto Express        
 

Guest: 8711bfaa   show all posts
Entry# 407242               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
while elephant, no demand even in summer months

712 views
Apr 25 2012 (4:12PM)        

Guest: 6060e20e   show all posts
Re# 407242-13               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
On a Monday working day, it reaches around 11 am. Who cares for this train?
Let it reach around 6-7am, then one should check.

21 posts - Wed Apr 25, 2012 - are hidden. Click to open.

812 views
Apr 27 2012 (7:33AM)        

i am back in Indore Duronto**   2102 blog posts   1818 correct pred (66% accurate)  
Re# 407242-22               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
this is train becomes full a couple of days before running.. it is a success.. all the trains between mumbai to indore viz, Avantika, Pune-Indore, Bandra Indore and this one Indore Mumbai duronto are a success.. u will always find them full when u board the train.. don't go on the acommodation availability

810 views
Apr 27 2012 (7:40AM)        

ArkChat921**   4634 blog posts   3428 correct pred (60% accurate)  
Re# 407242-23               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
It cannot be done.. This train is a fully AC LHB one, whereas SDAH-PURI is a composite A.c.-cum-non-A.C. Duronto with ICF rakes..
Scroll to Top
Scroll to Bottom