Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Wed Apr 16, 2014 09:53:50 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 26, 2014
Trains with ARP 30 Dep on: Fri May 16, 2014
Trains with ARP 60 Dep on: Sun Jun 15, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Entry# 471846  
Posted: Jul 03 2012 (1:09PM)

21 Responses
Last Response: Jul 04 2012 (11:05AM)
General Travel
0 Followers
633 views
Jul 03 2012 (1:09PM)           
 

arya.rishav99*   3027 blog posts   590 correct pred (69% accurate)  
Entry# 471846               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Is Indian Railway tracks are feet for 150/kmph?

305 views
Jul 03 2012 (1:28PM)        

once a IRF always a IRF   35305 blog posts   1186 correct pred (72% accurate)  
Re# 471846-12               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
only ndls - agra section is fit for 150 sir at present .. They are working to make ndls cnb section for 150 as well..

17 posts - Tue Jul 03, 2012 - are hidden. Click to open.

335 views
Jul 04 2012 (12:00AM)        

Vijay railfan   797 blog posts   75 correct pred (56% accurate)  
Re# 471846-21               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
sir I have read that in news paper very long before.
I guess just before introduction of BPL shatabdi(probably in 2005 ) I read an article that BPL shatabdi is fastest train in India and for that entire NDLS-BPL stretch is made fit to run 150KMPH

330 views
Jul 04 2012 (12:27AM)        

Mahesh Gupta   1138 blog posts   68640 correct pred (70% accurate)  
Re# 471846-22               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
NDLS - TKD = 130 KMPH
TKD - AGC = 150 KMPH
AGC - LAR = 130 KMPH
LAR - BPL = 120 KMPH
This is the MPS for BPL Shatabdi.
The whole stretch between NDLS - BPL might have been designed for 160 KMPH but a train cannot do more than what has been put up above or in short cannot do more than the MPS.
Just for info i have learned that CNB-NDLS is designed for 160 KMPH operations but
...
Read more...
none of the trains is doing greater than 130 KMPH in this section.

314 views
Jul 04 2012 (12:38AM)        

Guest: 7bc12170   show all posts
Re# 471846-23               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
even KR railways has been designed for 160kmph.

246 views
Jul 04 2012 (11:05AM)        

arya.rishav99*   3027 blog posts   590 correct pred (69% accurate)  
Re# 471846-24               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
but today Sealdah New Delhi Duronto is the fastest train in India.
Sealdah New Delhi Duronto average speed 89/kmph.
Bhopal Shatabdi 87/kmph.
Scroll to Top
Scroll to Bottom