Blog Entry# 627733
Posted: Dec 31 2012 (20:26)
17 Responses
Last Response: Dec 31 2012 (21:53)
this train should be extended till TVC in one side and till SPJ in another side..
already tvc trains getting extended to ncj/ten because of insufficiency of yard