This train should be converted into superfast with an AC 2 tier cum AC 3 tier or with an AC 3 tier coach added.
The following stoppages can be removed: NNA, MNE, MOG, SPP, MNO, DES, SEE, BTT.
Stoppage durations should be reduced at RNY, NBQ, NOQ, NCB, DQG, KNE, KIR, BJU, CPR, SV, GKP, BE and MB.
The train should be extended upto...
more... Dibrugargh and if the deperature time is fixed at 06:45 and assuming 11Hr 5mins DBRG GHY travel time, the train can leave GHY at 18:00. Since, the train gets converted to Superfast, the timings would closely come to the present one by the time the train reaches Hajipur. The travel time would reduce Hajipur onwards as the train is converted to superfast.
In the North the train should be extended upto Udhampur also.
If any Rail Ministry official is reading this, he should take note of my suggestion. Comments are also expected from other readers and forum members.
Jai Hind.