Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 07:10:23 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 07:10:23 IST

Blog Entry# 912268  
Posted: Nov 21 2013 (09:01)

3 Responses
Last Response: Nov 21 2015 (19:15)
  
010
Station Tip
Amenities
0 Followers
3298 views
Nov 21 2013 (09:01)   TNA/Thane (10 PFs)

Konkan Railway*^~   13536 blog posts   12343 correct pred (64% accurate)
Entry# 912268            Tags   Past Edits
Train Arrival /Departures:-

PF 1 : - This Island Platform is a terminal located at CST End. Dedicated to only Thane EMUs towards Kurla, Dadar & CST

PF 2
...
more...
:- Dedicated to Slow EMUs towards Dombivli, Kalyan & Beyond. A few Thane - CSTM services are likely to be operated from here during the day.

PF 3:- Dedicated to Thane terminating/starting EMUs towards CST as well as towards Kalyan & Beyond..

PF 4:- Dedicated to Slow/Semi fast services towards DR & Beyond

PF 5: - Dedicated to Fast /SemiFast Services towards Dombivli, Kalyan & Beyond...It also serves as a halt for Long distance M/E trains having a stop at Thane (usually originating from CSTM & DR)

PF 6: - Dedicated to Fast Services towards CSTM .It also serves as a halt for Long distance M/E trains having a stop at Thane (usually terminating at CSTM & DR)

PF 7:- Dedicated to Long distance M/E trains having a stop at Thane (usually originating from LTT)

PF 8:- Dedicated to Long distance M/E trains having a stop at Thane (usually terminating at LTT )

PF 9 & PF 10 : - Dedicated to Suburban services starting from Thane towards Trans Harbour line viz Vashi / Nerul / Belapur / Panvel

Disclaimer: Please check the train arriving status in the Indicator and /or from announcements for arriving/departing Platforms. It can be subject to change any time. The usual movement of train traffic is only indicated above.

  
1919 views
Nov 23 2013 (22:13)
Harshad Pavagi~   5516 blog posts   29883 correct pred (79% accurate)
Re# 912268-1            Tags   Past Edits
"PF 2 :- Dedicated to Slow EMUs towards Dombivli, Kalyan & Beyond."
THANE-CST bound EMUs, also depart from PF2. They are like 2-3 of them during the day.
"PF 4:- Dedicated to Slow/Semi fast services towards CST & Beyond"
CST & beyond :)...pls edit :))

  
2183 views
Nov 24 2013 (08:35)
Konkan Railway*^~   13536 blog posts   12343 correct pred (64% accurate)
Re# 912268-2            Tags   Past Edits
Thanks ..... Now edited.....

  
1804 views
Nov 21 2015 (19:15)
brohan08   174 blog posts   160 correct pred (74% accurate)
Re# 912268-3            Tags   Past Edits
PF 7 also fast train from thane to cstm starts from here and now mandovi and konkankanya(towards mao) stops on pf 5

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site