3-3AC and 2-2ND AC coaches have been allocated to this train getting shock after shock fromE-Cor this 3 rd ac coach which has been alloted from 10-feb 2014 and even i saw 5 wdm3d engines at vskp loco shed on 9 th while i was coming back to chennai and on the eng it had vskp wdm3d i cant belive