Blog Posts by Aslam Shaikh
Page#    112 Blog Entries  next>>
  
Rail News
0 Followers
281 views
New Facilities/TechnologyCR/Central  -  
Feb 22 2017 (10:41)   Isolux Corsan wins Indian rail electrification projects

karbang   49 news posts
Entry# 2174184   News Entry# 294516         Tags   Past Edits
Isolux Corsan has been awarded work to electrify two sections of the main rail route connecting the cities of Mumbai and Chennai in southern India.
The contracts have a budget of €45m (£37m) and have an execution period of three years.
The first section, which has a length of 160km, is located in the state of Maharashtra and connects the cities of Bhigwan and Solapur. The 113km second section connects Solapur (in Maharashtra) and Gulbarga (in Karnataka).
The
...
more...
scope of the work includes the design, supply, erection, testing and commissioning of 25kV, 50Hz single-phase traction overhead equipment, switching stations and other associated works. Signalling and telecoms and the civil engineering works needed for the electrification are also included.

1 posts are hidden.

  
606 views
Feb 22 2017 (20:02)
Aslam Shaikh   175 blog posts
Re# 2174184-2            Tags   Past Edits
I guess they are electrifying only single line since doubling is not completed
  
Rail News
0 Followers
181 views
Major Accidents/DisruptionsML/Mumbai Local  -  
Feb 13 2017 (16:33)   Central Railways: Agitation on the tracks delays trains by 20 minutes

rdb*^   126123 news posts
Entry# 2163200   News Entry# 293788         Tags   Past Edits
There was at least a 20 minute delay on the central and trans-harbour lines this afternoon, after people living in slums near Thane-Airoli and Thane-Kalwa station staged a rail roko against the demolition of illegal structures by the local Corporation. It led to disruption of train services between Kalwa, Airoli and Thane on Monday afternoon. The protest affected Up and Down services on the Kalwa-Airoli route and Thane-Airoli route, with some commuters being stuck for around 20 minutes.
Speaking with Mirror, Narendra Patil, Chief Public Relations Officer, Central Railway, Mumbai, said, "It is very unfortunate that people unnecessarily target railways for their protests on any and every issue. Protests and violence on railways is a very sensitive issue as it impacts lives
...
more...
of many. Why block train services and make commuters suffer? This has become a regular activity now."
The incident occurred between 1.30 pm to 1.50 pm. He added, "The local authorities are demolishing illegal slums structures and encroachments so those who were affected staged their agitation on the railway tracks. They squatted on the railway tracks for twenty minutes, affecting the central and trans-harbour lines. As a result, the trains got delayed. Police officials reached the spot on time and took strict action against the protesters but twenty-five minutes lost are gone."
Recently, hundreds of people living in Indira Nagar slums near Titwala station staged a rail roko against the demolition of illegal structures by the Kalyan-Dombivli Municipal Corporation (KDMC), disrupting services between Kalyan and Kasara on the central line. In another incident, a mob had protested near Dombivli station to protest against demolition of slums on railway land.

  
990 views
Feb 13 2017 (19:11)
Aslam Shaikh   175 blog posts
Re# 2163200-1            Tags   Past Edits
This is bound to happen all were busy filling pockets when these illegal houses came up. Now poor people will struggled to find homes.
  
★  Info Update
0 Followers
2214 views
Feb 06 2017 (11:42)   SUR/Solapur (5 PFs)

Piyush S   1561 blog posts   65 correct pred (72% accurate)
Entry# 2153263            Tags   Past Edits
#PuneSolapurDoubling
Double line between Mohol and Vakav is operational from today.. :)
It will save 10-15 mins journey time as per railway officials..

5 posts are hidden.

  
785 views
Feb 13 2017 (07:56)
Aslam Shaikh   175 blog posts
Re# 2153263-6            Tags   Past Edits
From 2008 only 20 kms have been constructed very slow pace of work. What's the status of akkalkot to tilati is it already constructed?

3 posts are hidden.
  
Rail News
0 Followers
426 views
Commentary/Human InterestINT/International  -  
Jan 25 2017 (18:52)   Duty-bound cop in China gets married on railway platform

Jayashree ❖ Amita*^   35478 news posts
Entry# 2140018   News Entry# 292271         Tags   Past Edits
Beijing: Establishing a balance between work and personal life is something that every young working professional in the world can relate to, and when your job is to ensure security of a large number of people on a daily basis, it becomes even more difficult.
People missing out on important moments in life is not new in a hectic lifestyle for the present generation, but a police officer in China was about to miss his own wedding for his duty, when he and his significant other came up with a plan.
Zhang Qinghua
...
more...
and his bride Huang Mengjiao had planned to get married on January 23, but being a part of armed police, Zhang was busy in his duty for the upcoming celebrations on the 28th January for the Chinese New Year.
In order to make sure that duty didn’t come in the way of the special day, Huang took a train to Zhejiang province to meet Zhang and the couple tied the knot on the railway platform in a brief yet adorable wedding ceremony, with Zhang’s colleague’s in attendance.
The heart warming incident is a reminder of how police officials have to sacrifice a lot from their life and miss out on several moments in order to maintain dedication to their duty.

1 posts are hidden.

  
1307 views
Jan 25 2017 (19:24)
Aslam Shaikh   175 blog posts
Re# 2140018-2            Tags   Past Edits
Chinese are very efficient when it comes to work they never betray anybody.

1 posts are hidden.
TRIP HAS ENDED.
Blog  Time-Table

9 posts are hidden. Click to open.

  
372 views
Nov 26 2016 (07:53)
Aslam Shaikh   175 blog posts
Re# 2069733-10            Tags   Past Edits
Its no yet doubled still work is left to be completed hence it will take lots of time to complete.

17 posts are hidden. Click to open.
  
★★★  Info Update
3 Followers
11431 views
Oct 25 2016 (13:20)   SUR/Solapur (5 PFs)

Piyush S   1561 blog posts   65 correct pred (72% accurate)
Entry# 2035831            Tags   Past Edits
#DoublingUpdate
Good news.. Mohol to Wakav and Akkalkot Road to Tilati doubling work is completed and will be commissioned in November as past of Pune - Solapur - Gulbarga doubling.
If railway safety commissioner given green signal, then traffic will start from 1st Dec onwards on this second line.

17 posts - Sat Oct 29, 2016

  
1170 views
Oct 29 2016 (20:41)
Aslam Shaikh   175 blog posts
Re# 2035831-18            Tags   Past Edits
I was not able to click any pics when my train no 12702 reached gulbarga it was dark outside. What I could make out was that from wadi station uptil gulbarga outer wiring is done expect the main station regarding sub station I was not able to get a clear view about that.

  
1114 views
Oct 30 2016 (09:10)
skumarvkulkarni   1647 blog posts
Re# 2035831-19            Tags   Past Edits
Yes sir from wadi till gulbarga outer(pit line) wiring has been done except gulbarga martur and shahbad stations... And this is the status since last 5 months no progress after that..

  
1140 views
Oct 30 2016 (11:42)
Aslam Shaikh   175 blog posts
Re# 2035831-20            Tags   Past Edits
I feel this work may get completed by March 2017 and doubling is also going on in another maybe 10 years we can expect e locos

1 posts are hidden.

  
962 views
Nov 01 2016 (16:25)
SCR Godavari Express~   2353 blog posts   11 correct pred (92% accurate)
Re# 2035831-22            Tags   Past Edits
How about doubling between Wadi and Gulbarga?

11 posts are hidden.

  
1570 views
Nov 14 2016 (12:31)
Aslam Shaikh   175 blog posts
Re# 2035831-34            Tags   Past Edits
Whatever is written in the above news article is half correct. Yes travelled between daund to gulbarga below are the updates.
Between daund and bhigvan wires are hanging on ohe but section not electrified and sub station work is going on in between.
Coming to doubling in Maharashtra double was seen in patches somewhere near kem station after bhigvan at some places levelling work is done but no track work can be seen.
After
...
more...
mohol track work is seen between akkalkot and tilati with track linking work is done and signals are placed.
After tilati station small bridges were constructed looking at the pace of work I felt that the work maybe over in next two years as they are in no hurry to complete the work.
After akkalkot minor works here and there can be seen and the ground leveling work was already done by the old contractor though big bridges are not yet touched.
After that coming to gulbarga electrification done wires are hanging on ohe but not connected to substation and electrification work not done on main station and not connected between wadi station and the next station towards wadi.
Worst was that though some sections were electrified still diesel locs are running under wires which is waste of money. Last time in the month of august the situation was same as mentioned above just a few kms are added or wikk be added. Pathetic planning execution and waste of money by railways.

10 posts are hidden.
  
Rail News
0 Followers
968 views
New/Special TrainsCR/Central  -  IR Press Release 
Nov 11 2016 (18:38)   TWO RESERVED SPECIAL TRAINS BETWEEN BHUSAVAL AND VARANASI-Bookings open on 11.11.2016

Saurabh   3032 news posts
Entry# 2056742   News Entry# 285428         Tags   Past Edits
TWO RESERVED SPECIAL TRAINS BETWEEN BHUSAVAL AND VARANASI
Central Railway will run Two reserved special trains o­n Special Charges between Bhusaval and Varanasi to clear the extra rush of passengers. The details are as under-
01183 Special train will leave Bhusaval o­n 13.11.2016 at 12.40 hrs and will arrive Varanasi at 07.00 hrs next day.
01184 Special train will leave
...
more...
Varanasi o­n 14.11.2016 at 22.00 hrs and will arrive Bhusaval at 17.45 hrs next day.
HALTS: Burhanpur, Nepanagar, Khandwa, Itarsi, Pipariya, Jabalpur, Katni, Satna, Manikpur and Cheoki.
COMPOSITION: 16 Second Class.
Reservation: Bookings for 01183 o­n Special Charges will be opened o­n 11.11.2016 through Internet and all PRS locations.
---- ---- ---- ---- ---- --- -----
Date: November 10, 201

  
1055 views
Nov 11 2016 (22:28)
Aslam Shaikh   175 blog posts
Re# 2056742-1            Tags   Past Edits
Central railways should change its name and merge with NCR since its focus point is only up and Bihar.

  
2926 views
Nov 12 2016 (09:52)
Addicted To IRI®♔®   15083 blog posts   623 correct pred (62% accurate)
Re# 2056742-2            Tags   Past Edits
General Coach Lagake Reservation Full kamanewali bat..
  
Rail News
0 Followers
1849 views
Commentary/Human InterestCR/Central  -  
Oct 30 2016 (21:52)   Hint of EMU trains from Pune to Daund
 

Cheetah   91 news posts
Entry# 2042504   News Entry# 284394         Tags   Past Edits
PIMPRI CHINCHWAD: EMU trains can be a reality on the Lonavla-Pune-Daund route, provided the railways declare the Pune-Daund section a suburban area.
Divisional railway manager of Pune B K Dadabhoy said at a meeting of the railway users' committee on Thursday there was a proposal for running suburban local trains on the Lonavla-Pune-Daund section. Officials stressed if the railways announced the Pune-Daund section was a suburban area, the Pune division of the Central Railways could work on the proposal of running EMU trains.
EMU (electric multiple unit) trains can now run between Pune
...
more...
and Daund because the Rail Vikas Nigam Limited has completed the electrification work in the Pune-Daund-Bhigwan (102km) section. All trains are running on electric power now on this route now.
A total of 40 pairs of EMU trains run on the Pune-Lonavla route. There has been a long pending demand to run local trains in the Lonavla-Pune-Daund section. At present, local trains in the Pune-Daund section run on diesel engines.
Unlike diesel engine operated local trains which run at a slow speed, the EMU trains are much faster. On the Pune-Lonavla route (64kms), the EMU train takes 90 minutes. The same speed can be attained on the 76km Pune-Daund section. Express trains on Pune-Daund section takes about 70 minutes with a diesel locomotive. The time taken is likely to go down with the introduction of electric locomotives.

  
2007 views
Oct 30 2016 (22:00)
Aslam Shaikh   175 blog posts
Re# 2042504-1            Tags   Past Edits
When did daund and bhigvan electrification complete???

  
2232 views
Oct 30 2016 (22:07)
Cheetah   15176 blog posts   54753 correct pred (63% accurate)
Re# 2042504-2            Tags   Past Edits
By March 2017 !!

4 posts are hidden.
  
★★  General Travel
0 Followers
2660 views
Oct 28 2016 (19:13)   22443/Kanpur - Mumbai Bandra (T.) (Weekly) SF Express | CNB/Kanpur Central (10 PFs)

😍12033 Kanpur Shatabdi 12034😍^~   2458 blog posts   13551 correct pred (77% accurate)
Entry# 2040453            Tags   Past Edits
deen dayalu gs coach with improved ss psngrs fittings,wtr purifier,fire ext introduced in cnb-anvt, cnb-bdts & cnb-asr
.
source:- twitter

  
2346 views
Oct 29 2016 (10:30)
Aslam Shaikh   175 blog posts
Re# 2040453-2            Tags   Past Edits
First run k bad ka half dekna pata chalega
  
★★  General Travel
0 Followers
2139 views
Oct 27 2016 (18:40)   02837/Hatia - Ernakulam SpecialFare Inaugural AC SF Special | BKSC/WDM-3A/16568
 

SGNR HS Inaugural 27 Feb^~   78815 blog posts   5089 correct pred (78% accurate)
Entry# 2039104            Tags   Past Edits
Tweet by GM / SER
Hon'ble CM of Jharkhand Shri Raghubar Das flagging off Hatia- Ernakulam Express from Hatia Station on date.

5 posts are hidden.

  
1612 views
Oct 27 2016 (19:57)
Aslam Shaikh   175 blog posts
Re# 2039104-6            Tags   Past Edits
More people to migrate to other states meanwhile they will loot the state.

  
1605 views
Oct 27 2016 (19:58)
Boxer Bhai   38199 blog posts   12668 correct pred (61% accurate)
Re# 2039104-7            Tags   Past Edits
Ac se migrate hilarious

  
1520 views
Oct 27 2016 (20:27)
Aslam Shaikh   175 blog posts
Re# 2039104-8            Tags   Past Edits
Padhe like log migrate nahi karte kya dusre cities me.

  
1506 views
Oct 27 2016 (20:40)
©The Dark Lord™   5031 blog posts
Re# 2039104-9            Tags   Past Edits
To aapke hisab se Rail Connectivity= Migration??? BTW k=agar karte bhi honge to kya fark padta hai, aapna desh hai kahi kaam kare.
Page#    112 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 9
Trains with ARP 15 Dep on: Tue Mar 14
Trains with ARP 30 Dep on: Wed Mar 29
Trains with ARP 120 Dep on: Tue Jun 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site