Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Apr 28, 2017 08:18:11 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Apr 28, 2017 08:18:11 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Arunkumar Verma
Page#    12 Blog Entries  next>>
  
General Travel
0 Followers
757 views
Oct 16 2015 (11:24)  
 

Arunkumar Verma   14 blog posts
Entry# 1618721            Tags   Past Edits
visiting site after long time new opinion tab comes as _/\_ good to see that

  
757 views
Oct 16 2015 (11:25)
NAGA RAJU   2677 blog posts   881 correct pred (80% accurate)
Re# 1618721-1            Tags   Past Edits
well come back
  
General Travel
0 Followers
881 views
Apr 08 2015 (14:16)  
 

Arunkumar Verma   14 blog posts
Entry# 1422135            Tags   Past Edits
Why i m unable to rate tips on -ve marking auch as not useful

  
882 views
Apr 08 2015 (14:19)
Saurabh*^~   8730 blog posts   3231 correct pred (73% accurate)
Re# 1422135-1            Tags   Past Edits
"You need to yourself have received at least 100 positive ratings on your own Blogs/Tips to mark negative ratings and objections. This is just a safeguard against spam.
Thanks for understanding."
-Moderator Sir
/blog/post/1421826/1
  
General Travel
0 Followers
1085 views
Apr 08 2015 (10:15)  
 

Arunkumar Verma   14 blog posts
Entry# 1421826            Tags   Past Edits
Why i m unable to rate tips on -ve marking auch as not useful

  
Apr 08 2015 (10:30)
moderator*^~   5479 blog posts   20 correct pred (61% accurate)
Re# 1421826-1            Tags   Past Edits
You need to yourself have received at least 100 positive ratings on your own Blogs/Tips to mark negative ratings and objections. This is just a safeguard against spam.
Thanks for understanding.

  
831 views
Apr 08 2015 (12:09)
Railfan Bilaspur~   1612 blog posts   2820 correct pred (66% accurate)
Re# 1421826-2            Tags   Past Edits
Be a little more active than you will also have this option.
  
★★  Rail Fanning
0 Followers
2092 views
Apr 08 2015 (09:59)   12295/Sanghamitra SF Express (PT) | GDYA/Ghoradongri (3 PFs) | ET/WAP-4/22986
 

Ujjawal Kashyap~   810 blog posts
Entry# 1421793            Tags   Past Edits
On a rainy afternoon, AC equipped ET WAP-4 #22986 approaches GDYA in style with the 23 coach rake of 12295 SBC-PNBE Sanghamitra SF Express.

  
Apr 08 2015 (10:10)
Arunkumar Verma   14 blog posts
Re# 1421793-1            Tags   Past Edits
Nice capture
  
Rail Fanning
0 Followers
5496 views
Apr 07 2015 (21:32)   59503/Viramgam - Okha Fast Passenger (UnReserved) | WKRC/Wankaner City (1 PFs)
 

Rony   4053 blog posts   788 correct pred (65% accurate)
Entry# 1421536            Tags   Past Edits
What is this going on?

10 posts are hidden.

  
1091 views
Apr 08 2015 (09:54)
Arunkumar Verma   14 blog posts
Re# 1421536-11            Tags   Past Edits
Once i traveld valsad to vadodara in 2012 and just 1 or 2 station before Ankleshwer guard selling tickets

  
1133 views
Apr 08 2015 (10:00)
Rony   4053 blog posts   788 correct pred (65% accurate)
Re# 1421536-12            Tags   Past Edits
I think that should be Sanjali, though I have not seen the station but that is very small so possibility of having no ticket counter. But this is between Rajkot and Surendranagar.

  
1115 views
Apr 08 2015 (10:07)
Arunkumar Verma   14 blog posts
Re# 1421536-13            Tags   Past Edits
Sir i share my experience not your because i never traveled ahead of adi in viramgam direction

8 posts are hidden.
  
★★★  General Travel
0 Followers
3870 views
Mar 11 2015 (01:20)   12480/Suryanagari SF Express (PT) | BDTS/Bandra Terminus (7 PFs)
 

Bring Back Golden Days of IRI*^~   31001 blog posts   68125 correct pred (81% accurate)
Entry# 1392920            Tags   Past Edits
What is extra marking on only NWR coach seen more the 5 trans having this type of coach

2 posts are hidden.

  
1399 views
Apr 08 2015 (10:03)
Arunkumar Verma   14 blog posts
Re# 1392920-3            Tags   Past Edits
Normaly one coach have 18 months poh schedule but these marking coach have 24 month poh schedule

4 posts are hidden.
  
General Travel
0 Followers
5352 views
Apr 08 2015 (09:27)   GKP/Gorakhpur Junction (10 PFs)
 

passionatesandy~   1519 blog posts   166 correct pred (68% accurate)
Entry# 1421765            Tags   Past Edits
NEXT »
इसी माह दौड़ेगी गोरखपुर से छपरा तक विद्युत ट्रेन

Tue, 07 Apr 2015 10:51 PM (IST)
जागरण संवाददाता, गोरखपुर : पूर्वोत्तर रेलवे में पैच डबलिंग (दोहरीकरण) के बाद विद्युतीकरण का कार्य
...
more...
तेज गति से चल रहा है। अगर सबकुछ ठीक रहा तो जून तक लखनऊ से छपरा तक बिजली की ट्रेनें दौड़ने लगेंगी। फिलहाल, गोरखपुर से भटनी तक 65 किमी रेल खंड का विद्युतीकरण पूरा हो चुका है। 20 से 25 अप्रैल तक रेल सुरक्षा आयुक्त (सीआरएस) इस रूट का निरीक्षण कर सकते हैं। इस माह के अंत तक गोरखपुर से छपरा तक विद्युत ट्रेन दौड़ने लगेगी।
पूर्वोत्तर रेलवे में बाराबंकी से छपरा तक लगभग 425 किमी रेल खंड का विद्युतीकरण होना है। वाराणसी मंडल में भटनी से छपरा 115 किमी रेल खंड का विद्युतीकरण पिछले वर्ष से ही पूरा हो गया। इस रूट पर मालगाड़ी चल रही हैं। अब गोरखपुर से भटनी 65 किमी रूट का भी विद्युतीकरण हो चुका है। रेल संरक्षा आयुक्त की हरी झंडी मिलते ही छपरा से गोरखपुर तक बिजली की ट्रेन दौड़ने लगेंगी। अब बचा लखनऊ मंडल का कार्य। यहां भी बाराबंकी से गोंडा रूट पर विद्युतीकरण हो चुका है। मालगाड़ियां चल रही हैं। बाकी, गोंडा से गोरखपुर तक का कार्य भी जून तक पूरा कर लिया जाएगा। इसके बाद लखनऊ से छपरा तक सीधे इलेक्ट्रिक गाड़ियां फर्राटा भरने लगेंगी। पूर्वोत्तर रेलवे के मुख्य जनसंपर्क अधिकारी आलोक कुमार सिंह ने बताया कि गोरखपुर जंक्शन पर भी चार लाइनों पर विद्युतीकरण पूरा हो चुका है। अन्य लाइनों पर भी तेजी से काम चल रहा है। हर हाल में जून तक बाराबंकी से छपरा तक का विद्युतीकरण पूरा कर लिया जाएगा। महाप्रबंधक राजीव मिश्र के दिशा- निर्देश में गोरखपुर से गोंडा रूट पर चल रहे कार्य को भी तेज कर दिया गया है। गोरखपुर से भटनी रूट के सीआरएस निरीक्षण के लिए रेलवे बोर्ड को प्रस्ताव भेजा जा चुका है। निरीक्षण के बाद विद्युत ट्रेनों के लिए लाइन खुल जाएगी। यहां जान लें कि वर्ष 2008 में तत्कालीन रेलमंत्री लालू प्रसाद यादव ने विद्युतीकरण की घोषणा की थी। 2012 तक लगभग 600 करोड़ में पूरा होने वाली यह परियोजना के लिए रेलवे को करीब 800 करोड़ रुपये खर्च करने पड़ रहे हैं। फिलहाल, सेंट्रल आर्गनाइजेशन फार रेलवे इलेक्ट्रिफिकेशन ने टाटा प्रोजेक्ट को विद्युतीकरण का कार्य सौंपा है।
---
मिलेगी राहत,
- रेलवे के खर्च में आएगी कमी।
- पर्यावरण में प्रदूषण नहीं फैलेगा।
- समय की बचत होगी, ट्रेनें बढ़ेंगी।
- स्टेशनों पर बिजली की व्यवस्था।
- तेल से संभावित दुर्घटनाएं खत्म।

  
1226 views
Apr 08 2015 (09:50)
Arunkumar Verma   14 blog posts
Re# 1421765-1            Tags   Past Edits
Good news now vaishali able to run end to end wap 4

7 posts are hidden.
  
★★★  Rail Fanning
0 Followers
4481 views
Apr 07 2015 (20:43)   01153/Chalisgaon - Mumbai CST Tatkal Special | VVH/Vidyavihar (2 PFs) | KYN/WCAM-3
 

Addicted To IRI®♔®~   15483 blog posts   627 correct pred (62% accurate)
Entry# 1421485            Tags   Past Edits
First Time Direct & Dedicated Connectivity DHULE/Chalisgaon To Mumbai
01153 Chalisgaon CST Express Ripping Pass Through Vidyavihar Speed Approx 105kmph

  
1145 views
Apr 08 2015 (09:48)
Arunkumar Verma   14 blog posts
Re# 1421485-1            Tags   Past Edits
105 at vidhyavihar not possible

  
1151 views
Apr 08 2015 (09:50)
Addicted To IRI®♔®~   15483 blog posts   627 correct pred (62% accurate)
Re# 1421485-2            Tags   Past Edits
10 Sec 11 Coach Khud hi Count Karlo aur bata Dena Aur Waise Bhi UP Maine Line Pe 105 Possible Hai Aap LTT Line Ka bol Rahe Ho Kya

11 posts are hidden.
  
★★★  Rail Fanning
0 Followers
6218 views
Apr 07 2015 (20:27)   74629/Banihal - Baramula DEMU | SINA/Srinagar Kashmir (3 PFs)
 

Soumitra Chawathe*^~   30223 blog posts   98197 correct pred (72% accurate)
Entry# 1421476            Tags   Past Edits
जहाँ पर होता है साक्षात "श्री" का निवास, उसी नगर को कहते है "श्रीनगर" !!
.
एक शाम श्रीनगर के नाम!!
कश्मीर की वादियों में, बर्फीली हवाओं में, नीले गगन के नीचे, वितस्ता (झेलम) के किनारे ... प्रस्तुत है जन्नत कश्मीर घाटी का दिल, श्रीनगर रेलवे स्टेशन (नौगाम) :)
.
...
more...

ठंडा ठंडा कूल कूल :D

2 posts are hidden.

  
Apr 08 2015 (09:48)
Arunkumar Verma   14 blog posts
Re# 1421476-3            Tags   Past Edits
Good capture even Good discription

1 posts are hidden.
  
★★★  Social
3 Followers
15823 views
Apr 06 2015 (12:59)   JBP/Jabalpur Junction (6 PFs)
 

2017Year of hopes for JBP~   3299 blog posts   44 correct pred (50% accurate)
Entry# 1419787            Tags   Past Edits
#JBPGBGPROJECT
A Very very good news for Jbp/BTC/Nainpur/Gondia people as enough fund has been alloted in rail budget 2015 for Jbp-BTC-G BG conversion so becoz of this the work of BG conversion has speeden up and many advanced machines has been coming to these sites to construct the route very speedly without any delay and so people can hope to travel by BG trains on this route-JBP-BTC-G within a yr or so
==============Jbp-Nainpr-BTC-G BG project k abhi tak hue or bache kaam k main points-============
1->Rail
...
more...
budget me iss project k liye bahut paisa mil gaya hai or isi karan jald BG conversion k liye issi saal Oct/Dec tak NG line band kr di jaygi kyunki bahut jagah BG wai bannana hai jaha abhi NG line hai
2->BTC-Gondia or BTC-Katangi route pehle hi BG ho chuka hai so ab bs BTC-Jbp ka kaam baaki hai jisme abhi Nainpur-BTC k beech 70% kaam ho chuka hai or nainpur-btc route k sabhi chote/bade bridges ban chuke hai+ BG k liye base bichaya ja rha hai or iske upar lagane k liye rail lines avlble kr di gai hai
3->Nainpur-Ghansor k bich pahad katke rail line daalne ka kaam jari hai or isi route pe bahut si pahadiyan hai so bahut si advanced machines mangai ja rai jisse pahado ko jaldi se katke rail line bichai ja sake
4->SECR ka pehla station Jbp-Nainpur route pe tayyar ho chuka hai jiska naam hai SAGDA or isi k paas Narmada river pe naya bridge tayyar hai or Jbp se SAGDA stn. tak 3 line bichane ki tayyari hai
5->Kachpura me station banane k liye base tayyar hai
6->Gwarighat-Tilwara k bich bada bridge bhi tayyar hai
7->Jbp-SAGDA stn. k bich padne waale high-tension (Electric line) line bhi shift kr dia gaya hai
8->Jbp-NAINPUR k bich forest land ka issue bhi resolve ho gaya hai jisse iss jagah pe jaldi line bichane ka kaam shuru hoga
9->Nainpur me 9 curves hai jisme pahad problem kr rai hai jisse katne ka kaam kia ja rha hai
10->Pindrai-Nigri section 14.9 kms lamba hai jaha abhi ki NG hatake BG daalna hai or yaha current sharp Curve ko hatake usse sidha kia jayga
11->Nigri-Ghansor section 7.35 kms lamba hai or yaha bi sharp curve khatam krne k liye pahadi kati ja rahi hai or yaha do bade rail bridge tayyar ho gaye hai+ 10 chote bridge bhi complete hone waale hai
12->Ghansor-Binekki section 8.95 lamba hai or yaha bi abhi ki NG line hatake BG line bichani hai or yaha 2 bade bridge+ 13 chote bridges pe kaam hona hai+ 6 curves ko hatake 7 sampaar banana hai
13->Binekki-Shikara section 11.75 kms lamba hai or yaha bi NG ki jagah BG line bichani hai + yaha 5 bade bridge or 6 chote bridge ka kaam chal rha hai + yaha pahadi katna baaki hai
14->Shikara-Sukari mangele section me 9 bade bridge me se 3 par kaam hona hai + 17 chote bridge tayyar ho gaye hai
15->Sukari Mangela-Bargi section 11.30 kms lamba haior yaha bi NG ki jagah BG bichana hai or base bichan hai BG k liye or 2 bade bridge +25 chote bridge hai jisme sirf 3 bridge ka kaam chal raha hai
16->Bargi-Gwarighat section 19.58 kms lamba hai or yaha per bahut se curves ki vajah se BG k naye route me change kia jayga or 5 bade bridge + 24 chote bridge tayyar kiye gaye hai + BG k liye base bichana baaki hai
17->Gwarighat-Kachepura section 15.64 kms lamba hai or yaha bi abhi ki NG ki jagah nai BG bichana hai or iss section me padne wala SAGDA stn. tayyar hai or isme pole shifting or kuch pahadi katne ka kaam baaki hai + iss section k 4 bade bridge + 20 chote bridge bana liye gaye hai
18->Kachepura-Jabalpur section me 3 line bichana hai or iss section me kachepura me ek platform banana hai jiska base tayyar hai + 3 line k liye base bichaya jaana hai
FACT FILE
>>Project estimate-429.64 crores n increased to 1200 crores bcoz of delay in completion
>>Project KMS-285.45 kms
>>Money invested till now-800 cr
>>project total stations- 22
>>Bridges (big & small both)-429
>>curves-149

33 posts are hidden.

  
1138 views
Apr 08 2015 (09:20)
Arunkumar Verma   14 blog posts
Re# 1419787-36            Tags   Past Edits
Looks imposible because bsp raj is filled from ngp

105 posts are hidden.
Page#    12 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon May 8
Trains with ARP 15 Dep on: Sat May 13
Trains with ARP 30 Dep on: Sun May 28
Trains with ARP 120 Dep on: Sat Aug 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site