Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 27, 2017 14:47:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 27, 2017 14:47:59 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ludhiana dhuri jakhal hisar track needs doubling~
Page#    173 Blog Entries  next>>
  
Info Update
0 Followers
3637 views
Jan 24 2017 (10:19)   JHL/Jakhal Junction (3 PFs)

Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Entry# 2138150            Tags   Past Edits
Update on #electrification of ludhiana-dhuri-jakhal-hisar railway track. Work is expected to be complete by dec. 2017.

11 posts - Jan 2017

13 posts are hidden.

  
1183 views
Feb 09 2017 (19:56)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2138150-20            Tags   Past Edits
ludhiana to kila raipur doubling has been sanctioned.

  
1108 views
Feb 09 2017 (22:51)
Ashwani Mittal   26 blog posts
Re# 2138150-21            Tags   Past Edits
when will start the work?

  
1020 views
Feb 10 2017 (10:12)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2138150-22            Tags   Past Edits
abhi to sanction hua hai lets see kb start hota 1 saal ke bheetar hona to chahiye.

  
691 views
Feb 16 2017 (22:31)
bti jhl without cross~   288 blog posts   2 correct pred (67% accurate)
Re# 2138150-23            Tags   Past Edits
Electric loco WAG 7 arrived first time at JIND jn for trial and trial successful.(on 16/02/2017-9:30)

  
576 views
Feb 17 2017 (19:52)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2138150-24            Tags   Past Edits
wow thats the great news.
  
Rail News
0 Followers
582 views
Rail BudgetNR/Northern  -  
Feb 07 2017 (19:50)   लुधियाना से किला रायपुर और मुल्लांपुर के रेल ट्रैक 313 करोड़ से होंगे डबल

Ludhiana dhuri jakhal hisar track needs doubling~   2 news posts
Entry# 2155077   News Entry# 293354         Tags   Past Edits
वित्तमंत्री अरुण जेतली ने बजट के दौरान नॉर्दर्न रेलवे के फिरोजपुर डिवीजन के अधीन आते रेलवे ट्रैकों के दोहरीकरण प्रोजेक्ट की घोषणा की है। रेल मंत्रालय ने लुधियाना-किला रायपुर के लिए 19 किलोमीटर तक डबल रेलवे ट्रैक बिछाने,गिल रेलवे स्टेशन पर फ्रेट कॉरिडोर की लाइन के लिए 230 करोड़ 22 लाख रुपए और लुधियाना-मुल्लांपुर रेलवे ट्रैक को डबल करने के लिए 82 करोड़ 99 लाख रुपए जारी किए हैं। इन दोनों प्रोजेक्ट के लिए डिपार्टमेंट ने 313 करोड़ 21 लाख रुपए रखे हैं। अगले महीने इस प्रोजेक्ट पर काम शुरू कर दिया जाएगा।
गौरतलब है कि लुधियाना से दिल्ली वाया किला रायपुर 22 मेल और पैसेंजर और 10 से ज्यादा मालगाड़ियां जाती हैं। दिल्ली से जाखल तक डबल और उसके बाद 212
...
more...
किलोमीटर सिंगल लाइन है। इस ट्रैक का विकास होने से मेल और एक्सप्रेस ट्रेनों की स्पीड बढ़ेगी। माल गाड़ियों के आने-जाने में भी आसानी होगी। किला रायपुर में बन रहे कंटेनर यार्ड तक जाने वाली मालगाड़ियां भी समय पर पहुंच सकेंगी। साथ ही लुधियाना पहुंचने वाली ट्रेनों को आउटर साइड पर नहीं रोकना पड़ेगा।
इसी तरह मुल्लांपुर तक ट्रैक का विकास होने से भी रेलवे ट्रैफिक को चलाने में काफी आसानी होगी। बद्दोवाल रेलवे स्टेशन पर बन रहे मालगोदाम के लिए भी ट्रेनें आसानी से जा सकेंगी। इन दोनों ट्रैकों के पूरा होने से अप डाउन ट्रैफिक चालू होने से ट्रेनों की स्पीड बढ़ेगी।
सूत्रों की मानें तो पायलट प्रोजेक्ट के तौर पर पहले मुल्लांपुर का प्रोजेक्ट शुरू किया जाएगा। धूरी-जाखल रेलवे सेक्शन पर पहले ही इलेक्ट्रिफिकेशन पूरा हो चुका है।
^डबल ट्रैक होने से लुधियाना प्लेटफॉर्म पर रेलवे ट्रैफिक कम होगा। वहीं मालगाड़ियों के आने जाने की सुविधा भी बढ़ेगी। अप-डाउन ट्रैफिक चालू होने से ट्रेनों की स्पीड बढ़ेगी। मालगाड़ियां समय के अनुसार कंटेनर यार्ड तक पहुंच पाएंगी। इससे कारोबारियों के लिए आसानी होगी,क्योंकि मोगा की साइड से मालगाडिय़ों का काफी ट्रैफिक रहता है। इससे फिरोजपुर मंडल का रेवेन्यू भी बढ़ेगा।-अनुजप्रकाश,डिवीजनल रेलवे मैनेजर फिरोजपुर मंडल
लुधियाना से किला रायपुर और लुधियाना से मुल्लांपुर तक सिंगल ट्रैक के डबल होने से लुधियाना रेलवे स्टेशन पर पहुंचने वाली ट्रेनों को अब आउटर पर रुक कर ट्रैक खाली होने का इंतजार नहीं करना पड़ेगा। सिंगल ट्रैक होने के कारण माल गाड़ियां लाइन क्लियर होने के कारण लुधियाना रेलवे स्टेशन पर रुक जाती थीं,जिस कारण पैसेंजर गाड़ियों को आगे रास्ता क्लियर नहीं मिलने के कारण आउटर पर इंतजार करना पड़ता था। वहीं,ट्रैक के डबल होने से मालगाड़ियां अब सीधे किला रायपुर और मुल्लांपुर रेलवे स्टेशन पर जाकर रुकेंगी। इससे रेलवे के टाइम में होने वाली देरी से निजात मिलेगी।
रेलवे मंत्रालय द्वारा लुधियाना से किला रायपुर और लुधियाना से मुल्लांपुर स्टेशन तक के रेलवे ट्रैक के दोहरीकरण से शहर में ट्रैफिक की होने वाली समस्या से भारी राहत मिलेगी। क्योंकि इन दोनों लाइनों के डबल होने से मालगाड़ियों यहीं से डायवर्ट होंगी और सारे सामान की लोडिंग और अनलोडिंग भी यहीं पर होगी। अब तक शहर के भीतर माल गोदाम होने के कारण भारी वाहनों का आना-जाना रहता है और भारी वाहनों के कारण शहर में ट्रैफिक की समस्या भी रहती है। शहर से बाहर माल की लोडिंग और अनलोडिंग होने से वाहनों की आवाजाही शहर के बाहर से ही हो जाएगी।
स्पीड के साथ बढ़ेगी ट्रेनों की आवाजाही,प्लेटफॉर्म पर रश कम होने से आउटर पर नहीं रुकेंगी ट्रेनें

  
2026 views
Feb 07 2017 (20:02)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2155077-1            Tags   Past Edits
Update on #doubling
  
Rail Budget
0 Followers
820 views
Feb 04 2017 (01:12)   DUI/Dhuri Junction (4 PFs)

Somnath   71 blog posts
Entry# 2150852            Tags   Past Edits
Doubling line
Ludhiana kila raipur with freight line at Gill station on Ludhiana jakhal section

  
712 views
Feb 04 2017 (22:14)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2150852-1            Tags   Past Edits
Finally ab ldh jhl ke kuch part ki to doubling hogi!!!!
  
Rail Budget
0 Followers
1160 views
Feb 01 2017 (16:18)  

bti jhl without cross~   288 blog posts   2 correct pred (67% accurate)
Entry# 2147956            Tags   Past Edits
Is bar kya pink book aaygi?

5 posts are hidden.

  
486 views
Feb 04 2017 (07:35)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2147956-7            Tags   Past Edits
Ludhiana to kila raipur doubling in pink book
  
★  Info Update
0 Followers
2909 views
Feb 03 2017 (14:52)   BSB/Varanasi Junction (9 PFs)

I am Waiting for Patanjali Cold Drink   30265 blog posts   22623 correct pred (76% accurate)
Entry# 2150110            Tags   Past Edits
NR Doubling 2017-2018 in #PINK_BOOK
Ludhiana-Mullanpur (21 km)
Barabanki-Malhaur - 3rd & 4th Line (32.84 km)
Varanasi-Mughalsarai - 3rd line (16.72 km) with substructure of 2 lines on bridge No.11 (Malviya Bridge)
Ludhiana-Kila
...
more...
Raipur (19 km) with freight line at Gill station
Jaunpur Jn-Jaunpur City - Chord line (2.2 km)
Janghai-Phaphamau - Doubling with electrification (46.79 km)

17 posts are hidden.

  
Feb 03 2017 (21:03)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2150110-19            Tags   Past Edits
Finally ludhiana to quila raipur doubling sanctioned

1 posts are hidden.
  
★★  Rail Fanning
0 Followers
3061 views
Jan 24 2017 (14:01)   PTA/Patiala (4 PFs) | SSB/WDS-6AD/36318

Naveen~   2942 blog posts   33 correct pred (60% accurate)
Entry# 2138399            Tags   Past Edits
An SSB yellow hunk , performing shunting duty at Patiala.

3 posts are hidden.

  
964 views
Jan 26 2017 (20:23)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2138399-4            Tags   Past Edits
That will must be going towards malerkotla side.

  
1213 views
Jan 26 2017 (23:43)
Ashwani Mittal   26 blog posts
Re# 2138399-5            Tags   Past Edits
when will complete the work on ldh-hsr section and bti-rjp section?

9 posts are hidden.
  
★★★  General Travel
0 Followers
2470 views
Jan 17 2017 (01:29)   54803/Jodhpur - Ahmedabad Passenger (UnReserved) | BNS/Banas (1 PFs)

SGNR HS Inaugural 27 Feb^~   78815 blog posts   5089 correct pred (78% accurate)
Entry# 2129763            Tags   Past Edits
double stack electrification in ABR MJ Section
Pic owner Shivam Naik
One more pic of high rise OHE with double stack
/blog/post/1988518

19 posts are hidden.

  
682 views
Jan 26 2017 (20:37)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2129763-22            Tags   Past Edits
The locomotives will be fitted with high reach pantograph. The height of these high reach pantographs will be adjusted automatically with the help of hydraulics. Even when the locomotive is moving the height of pantograph will be adjusted by hydraulics. To connect normal height ohe with high rise the height of ohe will increase step by step. This gradual increase in the height of ohe will be adjusted by hydraulic system of panto. Also not entire delhi sarai to ahmedabad is going on high rise only dee-rewari, rewari-rengas-phulera and rani to palanpur will be done with high rise ohe. Recently the new wag 9 are fitted with high reach pantographs. I also came to know that the prima locos which will be used on dfc's wil be fitted with these panto's.
  
General Travel
0 Followers
7229 views
Jan 18 2017 (08:03)  

SGNR HS Inaugural 27 Feb^~   78815 blog posts   5089 correct pred (78% accurate)
Entry# 2130918            Tags   Past Edits
Projects going all over India
This is list of projects going all over India in various zones
Please update your zones project here I will add in main blog with credits
.
CR
ECR
...
more...
- DFC , Digha Bridge Doubling,Muzaffarpur Hajipur Doubling,Ramdayalu Hajipur Doubling ( By Subrat)
Narkatiyaganj Raxaul Gc , Bakhtiyarpur Rajgir Electrification (By Rahul )
ER - Rampurhat Malda Electrification , Bardhman Bandel 3rd line , Dankuni Bally 3rd line , Gauge Conversion Balgona Katwa ( By Rahul )
Sainthia -Rampurhat 3rd line with electrification , Chandanpur-Dankuni 4th line with electrification , Ahmedpur-Katwa gauge conversion , Katwa - Azimganj electrification , CC link doubling ( By Debarathi)
ECoR - Khurda Road- Bolangir, Paradeep - Haridaspur, Talcher- Bimalgarh, Puri- Konark, Jagdalpur- Rayagada Doubling, Titlagarh- Visakhapatnam Doubling, Raipur - Titlagarh Doubling, Sambalpur- Talcher- doubling, Talcher- Cuttack tripling, Nergundi- Bhadrak tripling, ( By afraaz)
KR - Roha to Veer Doubling , Roha to Thokur Electrification ( by Konkan)
NCR - DFC
NER
1. Ongoing doubling and electrification of ALY-MUV-BSB-ARJ-GCT-BUI-CPR in which doubling is completed between Varanasi City and Aunrihar Jn. rest is under process and is expected to be completed till 2019-20. ( By Bruce Wayne )
2. Construction of new line connecting BSB-AMH-GKP. ( By Bruce Wayne )
3. Construction of new line connecting MAU to TARIGHAT i.e. NER to ECR project has been started. New line is via Ghazipur Ghat station to Tarighat. ( By Bruce Wayne )
5. Electrification of single diesel line from Kanpur Anwarganj - Farrukhabad. ( By Bruce Wayne )
6. Electrification of single diesel line from Rampur Jn.- Kathgodam. ( By Bruce Wayne )
7. Construction of ELS at GorakhpurJn. , Construction of DEMU shed at Aunrihar Jn. & Construction of Basic Training Centre at Ghazipur. ( By Bruce Wayne )
8. Gauge conversion ASH-STP-MLN & GD-BRK ( By Ravi Prakash Shukla )
NFR- New Domohani New Alipurduar Doubling(excluding Jaldhaka, Torsa R. Bridge),KIR RQJ electrification,New y link at New Jalpaiguri ( By Prabir ji )
NR
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Mavli - Barisadri , Udaipur - Himmatnagar , Electrification in Ajmer Palanpur, Ajmer Udaipur , Rewari - Phulera
NL dausa ganagapur city , Dungarpur banswara ratlam , Thiyat sanu hamira ( by riz)
SCR
Guntakal-Wadi electrification and doubling - close to completion
Peddapalli-Nizamabad - Close to completion
Guntur-Guntakal-Bellary electrification - On-going, Guntur-Guntakal stretch in good progress.
Bhimavaram-Gudivada-Vijayawada Electrification and doubling - On-going ( Work had practically stopped due to lack of funds, the last time I checked)
Bidar-Gulbarga - Was struggling due to land issues, now going at a brisk pace.
Guntakal-Dharmavaram Doubling - No progress
Kacheguda-Mahbubnagar doubling -
Secunderabad-Bolarum electrification - On-going, poles erected.
Parbhani-Mudkhed doubling - Slow progress
Obulavaripalle - Krishnapatnam - On-going, Earth work completed for the entire route.
Vijayawada-Balharshah tripling - On-going, a short section on the Balharshah end is almost completed ( correct me if I am wrong).
Nadikude-Venkatagiri - Survey going on for land acquisition
Kotipalli - Narsapuram - Survey going on for Kotipalli-Amalapuram section, Tenders to be called soon for New Godavari Bridge.
Akola-Akot gauge conversion - Yet to begin. ( By D S P Anirudh )
SECR - dalli rajhara - raoghat- jagdalpur , korba - pendra road and balaghat- nainpur - sukrimangla guage conversion, raipur -durg tripling , jharsugda- bilaspur quadrupling ( By saurabh)
SER
SR
PTJ-POY gauge conversion. ( By Aditya Siddharth) , Villupuram Dindigul doubling, Takkolam Arakkonam new line, Pollachi Podanur Gauge conversion, Sengottai Punalur Gauge Conversion, Charvattur Mangalore electrification, Erode Trichy electrification. ( BY SOURAV)
SWR
electrification of MYS-SBC and doubling at S. ( By Aditya Siddharth)
Tumkur Kalyandurga new line, Doubling of Yelhanka to Dharmavaram, Hubli to Tumkur Doubling, Guntakal to Vasco da gama doubling ( BY SOURAV)
WCR - Kota Bina doubling , Itarsi Allahabad Electrification
WR - DFC ,
New Line --- Dahod Indore , Chhotaudepur dhar, Somnath kodinar , Patan bhildi , Modasa shamlaji
Gauge conversion ---Kalol mahesana tarnga hill , Ahmedabad himatnagar , Bhuj naliya , Ahmedabad botad , Jetalsar dhasa
Doubling -- Udhna jalgaon , Viramgam samakhiyali , Palanpur samakhiyali , Surendranagar RAJKOT , Vatwa Ahmedabad 3rd line , Vtwa Ahmedabad , Sabarmati 3 n 4 th line , Chitourgadh nimuch , Indore dewas ujjain
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )

41 posts are hidden.

  
919 views
Jan 19 2017 (12:12)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2130918-45            Tags   Past Edits
In nwr Electrification:-1. Hisar-bhiwani-rewari. In NR Doubling:- 1. Chandigarh-dhappar 2. Rajpura-dhuri-bathinda 3. Jammu-jalandhar. Electrification:- 1. Ludhiana-dhuri-jakhal-hisar 2. Rajpura-dhuri-lhm 3. Rohtak-jakhal-bathinda-lhm 4. Rohtak-bhiwani 5. Rajpura-mohali 6. Amb andura-una himachal New lines:- 1. Rajpura-mohali 2. Makhu-harike 3. Rohtak-hansi 4. Katra-banihal 5. Amb andura-daulatpur-talwara.

17 posts are hidden.
  
Info Update
0 Followers
4035 views
Jan 08 2017 (21:13)   SAG/Sangrur (2 PFs)

Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Entry# 2120535            Tags   Past Edits
Update on #electrification according to drm ambala the electrification on ludhiana-jakhal-hisar railway is going with full swing. The works like basic structure, erecting pole, wiring,power supply, signalling works are going with good speed. And also new platform for goods trains is being constructed with good speed. And also wiring work is started from hisar and according to rvnl work shall get complete by march 2017 on hisar jakhal track.

17 posts - Thu Jan 12, 2017

18 posts are hidden.

  
2470 views
Jan 13 2017 (10:55)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2120535-19            Tags   Past Edits
Abhi kuch nhi kaha ja skta magar yes ek saal se upar lagega abhi full complete hone mein

  
2358 views
Jan 15 2017 (09:54)
Ashwani Mittal   26 blog posts
Re# 2120535-20            Tags   Past Edits
2018 mei complete ho jaega means... aisa to ni na k 2-3 saal lgenge???

  
2258 views
Jan 15 2017 (15:42)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2120535-21            Tags   Past Edits
Cant say work ki pace pe depend karega agar issi speed se chalta raha kaam to 2018 mein complete ho jayega.

  
1991 views
Jan 17 2017 (19:44)
Ashwani Mittal   26 blog posts
Re# 2120535-23            Tags   Past Edits
have you any latest video or pics about ongoing workon ludhiana jakhal section

  
1929 views
Jan 17 2017 (21:39)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2120535-24            Tags   Past Edits
Sorry bro i dont have any pic.
  
General Travel
0 Followers
1117 views
Jan 15 2017 (15:09)  

bti jhl without cross~   288 blog posts   2 correct pred (67% accurate)
Entry# 2128042            Tags   Past Edits
Update on #electrification
this video shows electrification works going on from mansa to bathinda.

  
1086 views
Jan 15 2017 (15:22)
Ludhiana dhuri jakhal hisar track needs doubling~   436 blog posts   9 correct pred (53% accurate)
Re# 2128042-1            Tags   Past Edits
Work is going with good speed here.

1 posts are hidden.
Page#    173 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 9
Trains with ARP 15 Dep on: Tue Mar 14
Trains with ARP 30 Dep on: Wed Mar 29
Trains with ARP 120 Dep on: Tue Jun 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site