Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 01:24:40 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 01:24:40 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by singsanjeev
Page#    14 Blog Entries  next>>
  
Rail News
0 Followers
156 views
Mar 27 2017 (09:10)   फिर शुरू हुआ रेल लाइन का निर्माण कार्य

ये क्या हो रहा है इंडियन रेलवे में~   249 news posts
Entry# 2212368   News Entry# 297742         Tags   Past Edits
शेखपुरा। एसडीओ सुबोध कुमार के हस्तक्षेप के बाद शनिवार से शेखपुरा-बिहारशरीफ रेल निर्माण का काम फिर से चालू हो गया। इसको लेकर शनिवार को प्रशासन को भारी मशक्कत करनी पड़ी। काम चालू कराने गए पहले सदर सीओ तथा रेलवे के ठेकेदार को ग्रामीणों ने काम करने नहीं दिया। बाद में मुख्यालय से एसडीओ सुबोध कुमार तथा एसडीपीओ अमित शरण ने मौके पर जाकर काम शुरू कराया। काम शुरू कराने के लिए प्रशासन को थोड़ी सख्ती भी दिखानी पड़ी। रेल लाइन का निर्माण रोक रहे चार लोगों को प्रशासन ने पकड़ कर हिरासत में ले लिया है। इसकी जानकारी देते हुए एसडीओ सुबोध कुमार ने बताया कि यह मामला सदर ब्लाक के मटोखर गांव है। उन्होंने बताया कि मुआवजे में अंतर को लेकर यहां के कुछ ग्रामीण पिछले कुछ समय से रेल लाइन का निर्माण कार्य करने नहीं दे रहे थे। उन्होंने बताया कि अधिक मुआवजे की मांग के लिए ग्रामीणों ने...
more...
कोर्ट में मुकदमा दर्ज किया है। एसडीओ ने बताया कि शनिवार से काम इस शर्त पर फिर शुरू किया गया है कि कोर्ट जो भी फैसला देगा उसी के मुताबिक जमीन का मुआवजा दिया जाएगा। बताया गया कि जबरन काम रोक रहे कुछ लोगों को हिरासत में लिया गया है। इधर ग्रामीणों ने रेल लाइन के निर्माण के लिए अधिकृत की गई जमीन का मुआवजा देने में मनमानी का आरोप प्रशासन पर लगाया है। जमीन देने वाले किसानों ने बताया कि मुआवजा के लिए जमीन की तीन तरह की श्रेणी तय की गई है। इसमें कृषि, आवासीय तथा व्यवसायिक। सड़क किनारे की जमीन को व्यवसायिक मुआवजा देने के बजाय कृषि जमीन का मुआवजा दिया जा रहा है।
यहां बताना भी जरूरी है कि शेखपुरा से बिहारशरीफ तक बनने वाली रेल लाइन का शिलान्यास तब के रेलमंत्री नीतीश कुमार ने साल 2002 में शेखपुरा में किया था, मगर तरह-तरह की अड़चनों की वजह से अभी तक जमीन अधिग्रहण का काम भी पूरा नहीं हो पाया है।

  
429 views
Mar 27 2017 (12:39)
singsanjeev   18 blog posts
Re# 2212368-1            Tags   Past Edits
this new section is not updated in Atlas.

  
88 views
Yesterday (16:44)
singsanjeev   18 blog posts
Re# 2212368-2            Tags   Past Edits
Admin, pl update new line in atlas.
  
Info Update
0 Followers
858 views
Mar 01 2017 (13:54)   14715/Sri Ganganagar - Tiruchchirappalli HumSafar Express

आम्ही कधीच नाही होणार म्हातारे~   2834 blog posts   1236 correct pred (71% accurate)
Entry# 2182266            Tags   Past Edits
The map around YPR seems to be wrong, as it shows a reversal which doesn't exist.
please correct the alignment

1 posts are hidden.

  
598 views
Mar 01 2017 (18:00)
singsanjeev   18 blog posts
Re# 2182266-2            Tags   Past Edits
also, section between mehsana-ahmadabad should be updated as BG....another line as narrow guage conversion should be highlighted as progress.
  
★★★  Rail Fanning
0 Followers
1499 views
Mar 01 2017 (12:50)   04715/Sri Ganganagar - Tiruchchirappalli - HumSafar Express Inaugural Special | PUNE/Pune Junction (6 PFs) | BRC/WAP-5/30067

Ayush Kamal~   5675 blog posts   60675 correct pred (88% accurate)
Entry# 2182197            Tags   Past Edits
INAUGURAL RUN : Sri Ganganagar - Tiruchchirapally HUMSAFAR EXPRESS | Pune Junction click here
.
"The Fourth edition of HUMSAFAR Express Family"
.
04715 (14715) Sri Ganganagar - Tiruchchirapally Humsafar Express hauled by Vadodara (BRC)
...
more...
WAP-5 30067 in AMUL livery arrived on PF-1 at Pune Junction with an delay of 90+ mins.
.
The bang on time running (upto Kalyan) Humsafar Express was delayed due to award winning controlling of CR. Letting it being overtaken by Mahalaxmi Express, Hussain Sagar Express, Mumbai - Latur SF Express, Mumbai - Solapur SF Express and Chalukya Express before reaching Pune.
.
The train arrived at around 2AM at Pune Junction and made an halt of around 30 mins here. The loco was changed from electric to diesel. PUNE WDM-3D 11406 took charge of SGNR - TPJ Humsafar Express from Pune onward..

3 posts are hidden.

  
249 views
Mar 01 2017 (13:38)
singsanjeev   18 blog posts
Re# 2182197-4            Tags   Past Edits
Admin to update the train route of 14715/Sri Ganganagar - Tiruchchirappalli HumSafar Express. Shown reversal at Jolarpettai & Yashvantpur...which is not correct. also, mehsana-Ahmadabad shown as gauge conversion in process where as this train operated on same route. pls update the color code in Atlas between mehsana-Ahmadabad section as BG.

1 posts are hidden.

  
268 views
Mar 01 2017 (13:44)
Take a bow Kuldeep Yadav~   2357 blog posts   73 correct pred (62% accurate)
Re# 2182197-6            Tags   Past Edits
MSH ADI needs no correction. Second line parallel to BG Main Line is undergoing BG conversion.

7 posts are hidden.
  
Rail News
0 Followers
448 views
New/Special Trains
Feb 27 2017 (23:14)   Humsafar Express, Antyodaya Express flagged off by Ministry of Railways: Timing, schedule, route and other details

HA1 Naani Ka sher~   86 news posts
Entry# 2181031   News Entry# 294912         Tags   Past Edits
Humsafar express and Antyodaya express flagged off earlier in the day
New Delhi, Feb 27: Speaking on the occasion Ministry of Railways, Shri Suresh Prabhakar Prabhu said that “This is the fourth Humsafar Express to be launched and it will cross the entire country from North to South. Humsafar train is a fully Air Conditioned 3 AC service having facilities like GPS based Passenger Information System, Passenger announcement System, fire and smoke detection and suppression system, CCTVs, comfortable seats, mobile and laptop charging points, integrated Braille display, LCD display above compartment doors in the aisle, Fire retardant curtains, etc.”
He
...
more...
also said that, “Today we are launching the country’s first Antyodaya Express to be launched. Tejas and UDAY Express will be launched soon. Antyodaya Express is a long-distance, fully unreserved, superfast train service, for the common man to be operated on dense routes. Antyodaya Express will have facilities like Cushioned luggage racks which can serve as seats Additional hand holds in doorway area, J-Hook near longitudinal luggage racks, Multiple Unit cables at both ends of the coach, Vestibuled ends for internal movement of the passengers, Potable Drinking water dispenser, Mobile charging points, Fire Extinguisher with anti-theft lock, FRP (Fibre Reinforced Plastic) Modular Toilets, Pleasing interior colour scheme, Toilet Occupation indication display board, LED Lights, SS Slip-free flooring at Doorway & Gangway, Anti-Graffiti coating for exterior painting, etc.”
Shri Prabhu further said that “In this new Catering Policy food production and food distribution will be delinked. This will be a marriage between the best of both worlds. Food can be cooked anywhere like the state of the art kitchens of IRCTC in a hygienic manner using mechanized system. Food can be distributed using professionals from the hospitality industry. For making of food SHGs especially women SHGs can be used which will benefit them.”

He also said that “Parcel is the fastest moving freight business of Indian Railways. Through this new Business Parcel Policy not only India Post but any private player can also book space in trains for movement of their Business Parcel. Before rolling out this scheme on All India basis test was done on 2 trains viz, Train No. 15959 Howrah-Guwahati-Dibrugarh Kamrup Express between Howrah and Guwahati and Train No. 12721 Hyderabad-Nizamuddin Deccan Express between Hyderabad and Nizamuddin . After the success of the test today this scheme is rolled out at All India level.”
Salient Features of Services / Policies launched:
Humsafar Express
Indian Railways introduced a new Humsafar Express between Sriganganagar and Tiruchchirapalli viz. 14715/14716 Sriganganagar-Tiruchchirapalli Humsafar Express (Weekly). The train service inaugurated on 27.02.2017 by Minister of Railways through video conferencing from Rail Bhawan, New Delhi. As announced in Railway Budget 2016-17, Humsafar Express are fully air-conditioned third AC service with an optional service for meals. Till date, 3 Humsafar Express trains have been introduced on Indian Railways.
The abstract schedule including timings, composition, stoppages etc. of the train service to be introduced is as under:
14715/14716 Sriganganagar-Tiruchchirapalli Humsafar Express (Weekly)

Arrives Departs Stoppage Day ↑ Station Code Station Name Distance (km) Day ↓ Arrives Departs Stoppage
13:30 Thu ↑ TPJ Tiruchchirappalli Junction 0 Thu ↓ 23:30
11:27 11:30 3m Thu ↑ KRR Karur Junction 76.2 Fri ↓ 1:07 1:10 3m
10:54 10:55 1m Thu ↑ NMKL Namakkal 110.1 Fri ↓ 1:39 1:40 1m
9:55 10:05 10m Thu ↑ SA Salem Junction 161.8 Fri ↓ 2:45 2:50 5m
6:08 6:10 2m Thu ↑ BWT Bangarapet Junction 357 Fri ↓ 6:42 6:45 3m
5:08 5:10 2m Thu ↑ KJM Krishnarajapuram 413.3 Fri ↓ 7:38 7:40 2m
4:48 4:50 2m Thu ↑ BAND Banaswadi 419.4 Fri ↓ 7:53 7:55 2m
3:20 3:25 5m Thu ↑ TK Tumakuru (Tumkur) 498.4 Fri ↓ 11:15 11:20 5m
1:30 1:35 5m Thu ↑ ASK Arsikere Junction 594.7 Fri

  
1003 views
Feb 28 2017 (13:38)
singsanjeev   18 blog posts
Re# 2181031-1            Tags   Past Edits
Admin, pls update the train route of 14715/Sri Ganganagar - Tiruchchirappalli HumSafar Express. Shown reversal at Jolarpettai & Yashvantpur...which is not correct. also, mehsana-kalol shown as gauge conversion in process where as this train operated on same route. pls update the color code in Atlas between mehsana-kalol section as BG.

  
2554 views
Mar 01 2017 (13:27)
singsanjeev   18 blog posts
Re# 2181031-2            Tags   Past Edits
same status..admin pls update in atlas.
  
★★★  Info Update
0 Followers
3082 views
Feb 24 2017 (07:46)   22417/Mahamana SF Express | NDLS/New Delhi (16 PFs) | GZB/WAP-7(I)/30509

Abhishek™   6 blog posts
Entry# 2176301            Tags   Past Edits
Here comes the first indigenous WAP-7 produced by DLW, Varanasi.
HOG Equipped GZB WAP-7 #30509 came as dead with 22417 Mahamana Express..

5 posts are hidden.

  
635 views
Feb 24 2017 (16:20)
singsanjeev   18 blog posts
Re# 2176301-6            Tags   Past Edits
How to identify the loco whether HOG or EoG by just viewing from outside?

  
Feb 24 2017 (16:38)
The elusive and rare WDP3 and WDM3~   2453 blog posts
Re# 2176301-7            Tags   Past Edits
I've highlighted the features in the yellow boxes in the attached pic. HOG locos have all the highlighted features. (Photo credits: Aditya Siddarth,
source: IRI gallery : /blog/post/2009105)

  
584 views
Feb 24 2017 (17:10)
singsanjeev   18 blog posts
Re# 2176301-8            Tags   Past Edits
thanks dear for information.

12 posts are hidden.
  
Rail News
0 Followers
1458 views
Other NewsER/Eastern  -  
Feb 15 2017 (12:07)   28 फरवरी तक निरस्त रहेंगी ये ट्रेनें / Train cancelled till 28 february

rks1975   58 news posts
Entry# 2165292   News Entry# 293952         Tags   Past Edits
गोरखपुर: पूर्वोत्तर रेलवे ने घने कोहरे तथा खराब मौसम से परिचालनिक कठिनाइयों के कारण निम्न गाड़ियों का निरस्तीकरण, आंशिक निरस्तीकरण तथा आवृत्ति में कमी तथा मार्ग परिवर्तन 15 फरवरी तक किया गया था। अब 28 फरवरी तक बढ़ाये जाने का निर्णय लिया गया है।
28 फरवरी तक निरस्तीकरण
- 12537 मुजफ्फरपुर-मंडुवाडीह एक्सप्रेस
- 15117 मंडुवाडीह-जबलपुर एक्सप्रेस
-
...
more...
15118 जबलपुर-मंडुवाडीह एक्सप्रेस
- 15111 छपरा-वाराणसी सिटी एक्सप्रेस
- 15112 वाराणसी सिटी-छपरा एक्सप्रेस
- 14213 वाराणसी-गोंडा एक्सप्रेस
- 14214 गोंडा-वाराणसी एक्सप्रेस
- 15909 डिब्रूगढ़-लालगढ़ अवध-असम एक्सप्रेस
- 15910 लालगगढ़-डिब्रूगढ़ अवध-असम एक्सप्रेस
- 14005 सीतामढ़ी-आनंद विहार टर्मिनस लिच्छवी एक्सप्रेस
- 14006 आनंद विहार टर्मिनस-सीतामढ़ी लिच्छवी एक्सप्रेस

8 posts are hidden.

  
3152 views
Feb 16 2017 (16:08)
singsanjeev   18 blog posts
Re# 2165292-9            Tags   Past Edits
as per paper cancellation till 28th Feb but 15026- Anvt-Mau cancelled till 3rd Mar...as per IRCTC login...booking not allowed, train cancelled.
  
General Travel
0 Followers
529 views
Feb 13 2017 (11:43)   15026/Anand Vihar Terminal - Mau Express

singsanjeev   18 blog posts
Entry# 2162538            Tags   Past Edits
Additional 3AC added with 15026- ANVT-MAU Express. Pls update coach composition for the train.

  
533 views
Feb 13 2017 (11:46)
Pran Pratim Ghosh   20255 blog posts   94868 correct pred (75% accurate)
Re# 2162538-1            Tags   Past Edits
updated.
  
Rail News
0 Followers
682 views
Rail BudgetNER/North Eastern  -  
Feb 01 2017 (09:33)   सहजनवा-दोहरीघाट रेल लाइन के लिए बोर्ड को भेजी डीपीआर

Aditya Immortal ™ ©~   233 news posts
Entry# 2147863   News Entry# 292738         Tags   Past Edits
गोरखपुर। बुधवार को पेश हो रहे आम और रेल बजट में रेलवे के लिए अलग से सेफ्टी फंड घोषित होने की उम्मीद है। लगातार हो रही दुर्घटनाओं पर अंकुश लगाने के लिए यह फंड मिलेगा। इस मद में रेलवे को 12 हजार करोड़ रुपये आवंटित होने की उम्मीद है।फंड से पुरानी पटरियों को बदलने, जर्जर पुलों की जगह नए पुल, कमजोर हो चुके पुलों की मरम्मत कराने के साथ ही दुर्घटनाओं को रोकने के लिए नई तकनीक विकसित करने के लिए अतिरिक्त बजट जारी किया जाएगा। एक लाख करोड़ की मांग: सूत्रों के अनुसार रेलवे ने पांच सालों के लिए सेफ्टी फंड के मद में एक लाख करोड़ रुपये की डिमांड की है। हालांकि उम्मीद है कि करीब 12 हजार करोड़ रुपये मिलने की उम्मीद है।
किलोमीटर
...
more...
लाइन के लिए 746 करोड़ का है बजट
साल का समय लग सकता है लाइन बिछाने में

  
1300 views
Feb 01 2017 (14:31)
singsanjeev   18 blog posts
Re# 2147863-1            Tags   Past Edits
Indira-Dohrighat meter guage to broad guage conversion still not updated in atlas.

  
1139 views
Feb 01 2017 (14:32)
Abhishek Jaiswal*^~   45229 blog posts   18374 correct pred (70% accurate)
Re# 2147863-2            Tags   Past Edits
Has work started there?
  
★  General Travel
0 Followers
1583 views
Nov 24 2016 (13:07)   22408/Anand Vihar Terminal - Varanasi Garib Rath Express

singsanjeev   18 blog posts
Entry# 2069809            Tags   Past Edits
22408- ANVT-BSB Garib rath: Addl coach G18 added on permanent basis. Pls update coach composition for the train. Snap date: 21 Nov'16
  
General Travel
0 Followers
300 views
Nov 11 2016 (15:59)  

singsanjeev   18 blog posts
Entry# 2056358            Tags   Past Edits
Indara-Dohrighat approved for BG conversion. pls update same in Atlas.
Page#    14 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site