Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat May 27, 2017 06:32:31 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat May 27, 2017 06:32:31 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ysk.6669
Page#    52 Blog Entries  next>>
  
General Travel
0 Followers
1680 views
Mar 12 2016 (11:04)   17211/Kondaveedu Express (PT)
 

ysk.6669   152 blog posts
Entry# 1764561            Tags   Past Edits
This train is getting GY 4D for the past 2 trips.
Also it's running with 4 AC coaches 2 II A & 2 III A. Only 5 GS as of now.
Total 20 coaches.
  
★  Info Update
1 Followers
7384 views
Sep 23 2015 (06:10)   17225/Amaravati Express (PT) | BZA/Vijayawada Junction (10 PFs)
 

ysk.6669   152 blog posts
Entry# 1597423            Tags   Past Edits
Admins,
The following are a few updates regarding BZA & GNT divisions.
GNT:
1. The Guntur- Tenali stretch is undergoing doubling and electrification of the present single electrified line.
2. The Guntur - Guntakal stretch
...
more...
is undergoing electrification of single line and electric poles have reached past KM 200 & a little beyond Giddalur starting from GNT.
BZA:
1. The doubling and electrification works are in progress from Vijayawada to Bhimavaram. Work started in 2013. But, as of electrification, OHE poles haven't come up yet for most of the stretch.
2. Works on Gudiwada - Machilipatnam. Bhimavaram- Nidadavolu, Bhimavaram- Narsapur stretches are yet to start.
Please make a note of this and make necessary changes in the Atlas.
If you want pictures regarding the same I'll give u those that I have.
Thank you in advance.
#Moderator.

  
4208 views
Sep 23 2015 (09:11)
venkatmta0504   25 blog posts
Re# 1597423-1            Tags   Past Edits
Guntur- Guntakal track electrification: electric poles have reached Diguvametta starting from nallapadu( approx-200 km)
electric poles have reached Linganenidoddi starting from Guntakal ( approx- 49 km)
...
more...

Total track length nallapadu- guntakal - 400 km

13 posts are hidden.
  
General Travel
0 Followers
1898 views
Sep 07 2015 (14:08)   NDL/Nandyal Junction (3 PFs)
 

ysk.6669   152 blog posts
Entry# 1584475            Tags   Past Edits
KCG - GNT Pass waiting at Nandyal.

  
1733 views
Sep 22 2015 (13:41)
brandonbuffard^~   11184 blog posts   6076 correct pred (68% accurate)
Re# 1584475-1            Tags   Past Edits
my top 12 station
nice
  
★  General Travel
0 Followers
2537 views
Sep 08 2015 (18:56)   DKD/Donakonda (3 PFs)
 

ysk.6669   152 blog posts
Entry# 1585547            Tags   Past Edits
BZA - UBL Pass waits with a GTL ALCo as DHNE - GNT Pass rolls up a grade for a halt at Donakonda led by MLY ALCo.

  
1841 views
Sep 08 2015 (19:00)
SRG*^~   35572 blog posts   169352 correct pred (76% accurate)
Re# 1585547-1            Tags   Past Edits
Nice Snap...Can see Electrification in progress, poles erected...

  
Sep 09 2015 (11:37)
ysk.6669   152 blog posts
Re# 1585547-2            Tags   Past Edits
OHE poles were up almost till KM 190 from GNT.

  
1977 views
Sep 09 2015 (12:47)
SRG*^~   35572 blog posts   169352 correct pred (76% accurate)
Re# 1585547-3            Tags   Past Edits
Oh good progress...Thanks for update, So its nearing Gudimetta then??

  
1949 views
Sep 09 2015 (12:49)
brandonbuffard^~   11184 blog posts   6076 correct pred (68% accurate)
Re# 1585547-4            Tags   Past Edits
nice to see that GNT-GTL section getting electrified
BTW great pic.

  
Sep 09 2015 (12:53)
ysk.6669   152 blog posts
Re# 1585547-5            Tags   Past Edits
Yes. Exactly.
  
★★  General Travel
0 Followers
3584 views
Sep 09 2015 (11:44)   VKN/Vinukonda (2 PFs)
 

ysk.6669   152 blog posts
Entry# 1585984            Tags   Past Edits
New substation for OHE power just outside Vinukonda.

  
1220 views
Sep 09 2015 (11:47)
tired f waitng4d PR SCRs train gets LHB rake~   1822 blog posts   36 correct pred (67% accurate)
Re# 1585984-1            Tags   Past Edits
SO is electrification of GNt- GTL getting priority than doubling or both will go simultaneously ?

  
1183 views
Sep 09 2015 (11:49)
ysk.6669   152 blog posts
Re# 1585984-2            Tags   Past Edits
As of now doubling yet to start.

30 posts are hidden.
  
★  General Travel
0 Followers
1427 views
Sep 09 2015 (11:36)   KEF/Krishnamma Kona (1 PFs)
 

ysk.6669   152 blog posts
Entry# 1585976            Tags   Past Edits
New loop being readied.
  
General Travel
0 Followers
1586 views
Sep 07 2015 (16:04)   CMZ/Chelama (1 PFs)
 

ysk.6669   152 blog posts
Entry# 1584570            Tags   Past Edits
Chelama on a Rainy day
  
★  General Travel
0 Followers
2385 views
Sep 07 2015 (13:44)   BMH/Betamcherla (2 PFs)
 

ysk.6669   152 blog posts
Entry# 1584449            Tags   Past Edits
A few shots of Betamcherla station.

4 posts - Mon Sep 07, 2015

  
1043 views
Sep 07 2015 (13:50)
ysk.6669   152 blog posts
Re# 1584449-5            Tags   Past Edits
Passenger reach ainde 1730 ki anna.
Didn't go anywhere. It was already dark.

  
1084 views
Sep 07 2015 (13:52)
ysk.6669   152 blog posts
Re# 1584449-6            Tags   Past Edits
Deserves a stop. Nandyal ninchi 40 KM, Dhone ninchi 30+KM. trains levga line meeda. So, justified.

1 posts are hidden.

  
1697 views
Sep 07 2015 (13:53)
Koilakuntla in IR~   7868 blog posts   7 correct pred (64% accurate)
Re# 1584449-8            Tags   Past Edits
Oh...... night stay ki risk emo kada!!!!
Cement factory permession kuda try cheyaledu emo!!

2 posts are hidden.

  
1662 views
Sep 07 2015 (14:02)
ysk.6669   152 blog posts
Re# 1584449-11            Tags   Past Edits
Rayalaseema MPs should pressure for getting Kondaveedu SF & daily tag. Once offices shift to BZA, this will be sort of Godavari for many MLAs & MPs.

  
1674 views
Sep 07 2015 (14:04)
Koilakuntla in IR~   7868 blog posts   7 correct pred (64% accurate)
Re# 1584449-12            Tags   Past Edits
especially for ATP dist Kondavedu exp and for Kurnool dist Amravati will help a lot...hope in 2018 or 2019 budget some trains to get introduced in this route
  
★★★  Greetings
1 Followers
10362 views
Aug 11 2015 (21:26)   22415/Andhra Pradesh AC SF Express
 

Guest: 52aca061   show all posts
Entry# 1562915            Tags   Past Edits
We already had trains like Swarna Jayanthi, which were not 24 coach trains and not to forget, with a better schedule. Its a bold move to snatch a train under ministerial whim from BZA, and lets see how good its patronage is. We had trains taking 32 hours and 34 hours in the likes of SJ and Samta. Now we are seeing an all time low, a fully air conditioned train taking freaking 36 hours. Honestly I do not know how people are feeling happy for this kind of service, when there is no demand at all for it to be extended to VSKP. This is how money is wasted.
All in all, if it has good amount of quota until Nagpur,
...
more...
may be people of Telangana and Maharastra could use this. I'm feeling happy for people of Peddapalli, Ramagundam, Sirpur Kaghaznagar for getting an AC train to New Delhi. The long pending demand of 12437/8 halt can finally come to an end.
My dear objectors, please mind that in the days where the AC Classes of existing trains are in a waiting lists which could be cleared with augmentation of 'one' extra coach, this full new AC Express is being flagged off. And for record purpose, we say IR is suffering from losses. I know this will get automatically closed with objections of VSKP activists, but I pity the narrow minds who object this 'just because they are from Vizag,' but all I do is hope that this train is utilized by people and hope that people who demanded this extension and the politicians behind this that they get some common sense of how to save money.

15 posts are hidden.

  
1223 views
Aug 12 2015 (07:52)
ysk.6669   152 blog posts
Re# 1562915-17            Tags   Past Edits
A pity that people object facts and say that objections be removed. Targeting a region is no big deal except when it is done on one particular place.
You have posted facts and it stays that a region who got the first train in almost a decade lost it even before it's introduction.

50 posts are hidden.
  
★★★  General Travel
1 Followers
4055 views
Aug 11 2015 (16:24)  
 

ysk.6669   152 blog posts
Entry# 1562683            Tags   Past Edits
AC Express rake being transferred to VSKP from BZA. It had more than 20 coaches including an EoG.

6 posts - Tue Aug 11, 2015

7 posts are hidden.

  
1298 views
Aug 11 2015 (16:50)
DD DISLODGED BBSKJM SLOT~   6154 blog posts
Re# 1562683-8            Tags   Past Edits
Will the SCR markings be removed on the coaches?

2 posts are hidden.

  
1311 views
Aug 11 2015 (17:03)
Abhishek Kumar~   10541 blog posts   9842 correct pred (76% accurate)
Re# 1562683-11            Tags   Past Edits
Going to VSKP any Reason ??

3 posts are hidden.

  
1623 views
Aug 11 2015 (17:16)
Bangalore to Kacheguda via kurnool Doubling~   2527 blog posts   2484 correct pred (76% accurate)
Re# 1562683-15            Tags   Past Edits
So if we fight for special status, they are giving AC express...
Something is better than nothing...No zone/No special status at least an AC express

  
1377 views
Aug 11 2015 (21:50)
DD DISLODGED BBSKJM SLOT~   6154 blog posts
Re# 1562683-16            Tags   Past Edits
Demand no more spl status ( real estate business) for early announcement of zone with VSKP as HQs.

  
1716 views
Aug 12 2015 (07:38)
Iri rules are different in different cases^~   81853 blog posts   5227 correct pred (78% accurate)
Re# 1562683-17            Tags   Past Edits
nice brand new shining coaches
but dont be surprised if in 3-4 months , NR replaces brand new coaches with 7-8 year old coaches .. After all its NR and anything is possible.

2 posts are hidden.
Page#    52 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jun 6
Trains with ARP 15 Dep on: Sun Jun 11
Trains with ARP 30 Dep on: Mon Jun 26
Trains with ARP 120 Dep on: Sun Sep 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site