Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 27, 2017 21:33:05 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 27, 2017 21:33:05 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by venkatmta0504
Page#    18 Blog Entries  next>>
  
General Travel
0 Followers
3078 views
Aug 30 2016 (07:49)   NDL/Nandyal Junction (3 PFs)
 

nawabjubair   72 blog posts
Entry# 1976044            Tags   Past Edits
can anyone update about gnt-gtl electrification.by when it will be opening???

2 posts are hidden.

  
1907 views
Aug 31 2016 (10:11)
venkatmta0504   24 blog posts
Re# 1976044-3            Tags   Past Edits
the electrification works are going in two phases.
1-phase: Nallapadu to digavametta---- Almost poles and wiring got completed. After buliding substations it can go for energising
Target date: March 2016 Completed by June 2016

2-
...
more...
phase: Diguvametta to guntakal ---- Poles are erected from Guntakal outer to nandyal outer-- Target date for completing this section was
Febraury 2017
Hopefully By 2018 we may expect electric trains in this route
  
General Travel
0 Followers
596 views
Aug 08 2016 (12:07)  
 

venkatmta0504   24 blog posts
Entry# 1955273            Tags   Past Edits
what is current status of Nallapadu-Guntakal Track electrification?.. pls update anyone having latest info....
  
General Travel
0 Followers
978 views
Jan 12 2016 (16:13)  
 

venkatmta0504   24 blog posts
Entry# 1708758            Tags   Past Edits
what is current status of Nallapadu-Guntakal Track electrificatio?.. pls update anyone having latest info....
  
General Travel
0 Followers
1505 views
Sep 25 2015 (12:27)  
 

venkatmta0504   24 blog posts
Entry# 1599555            Tags   Past Edits
Is this new electrical shed in Guntakal..????

  
1374 views
Sep 25 2015 (12:30)
Koilakuntla in IR~   7775 blog posts   7 correct pred (64% accurate)
Re# 1599555-1            Tags   Past Edits
At present only Electric Trip shed
Soon the same area used as ELS

  
1323 views
Sep 25 2015 (13:23)
Krishna Godavari Sangamam over now Krishna Penna   1772 blog posts   2 correct pred (67% accurate)
Re# 1599555-2            Tags   Past Edits
Plz tag it under GTL station wen members searched GTL its easy to identity for them
  
★  Info Update
1 Followers
6216 views
Sep 23 2015 (06:10)   17225/Amaravati Express (PT) | BZA/Vijayawada Junction (10 PFs)
 

ysk.6669   152 blog posts
Entry# 1597423            Tags   Past Edits
Admins,
The following are a few updates regarding BZA & GNT divisions.
GNT:
1. The Guntur- Tenali stretch is undergoing doubling and electrification of the present single electrified line.
2. The Guntur - Guntakal stretch
...
more...
is undergoing electrification of single line and electric poles have reached past KM 200 & a little beyond Giddalur starting from GNT.
BZA:
1. The doubling and electrification works are in progress from Vijayawada to Bhimavaram. Work started in 2013. But, as of electrification, OHE poles haven't come up yet for most of the stretch.
2. Works on Gudiwada - Machilipatnam. Bhimavaram- Nidadavolu, Bhimavaram- Narsapur stretches are yet to start.
Please make a note of this and make necessary changes in the Atlas.
If you want pictures regarding the same I'll give u those that I have.
Thank you in advance.
#Moderator.

  
3390 views
Sep 23 2015 (09:11)
venkatmta0504   24 blog posts
Re# 1597423-1            Tags   Past Edits
Guntur- Guntakal track electrification: electric poles have reached Diguvametta starting from nallapadu( approx-200 km)
electric poles have reached Linganenidoddi starting from Guntakal ( approx- 49 km)
...
more...

Total track length nallapadu- guntakal - 400 km

  
1797 views
Sep 23 2015 (12:46)
Vinukonda   18 blog posts
Re# 1597423-2            Tags   Past Edits
7 months back ohe poles crossed kurichedu, decent progress

12 posts are hidden.
  
★  General Travel
2 Followers
1755 views
Sep 10 2015 (14:30)  
 

venkatmta0504   24 blog posts
Entry# 1586971            Tags   Past Edits
Nallapadu-guntakal Electrification project - contractor company and target details....
po name:ELCORE/T/OHE/GR.177/116/PART-1- Electrificaton of Nallpadu (Excl) to Diguvametta Target date- 26-02-2016
po name: ELCORE T OHE GR 178 MOD 130-- Electrificaton of diguvametta to Guntakal(EXcl) Target date- 07-01-2017

  
1676 views
Sep 10 2015 (16:48)
Koilakuntla in IR~   7775 blog posts   7 correct pred (64% accurate)
Re# 1586971-1            Tags   Past Edits
By 2017 Complete electrification to be completed in GNT-GTL
  
General Travel
0 Followers
1697 views
Sep 09 2015 (17:30)   VKN/Vinukonda (2 PFs)
 

venkatmta0504   24 blog posts
Entry# 1586292            Tags   Past Edits
what is the current status of nallapadu -guntakal electrification.....
  
General Travel
0 Followers
1624 views
May 05 2015 (12:26)  
 

venkatmta0504   24 blog posts
Entry# 1455591            Tags   Past Edits
why it is showing temporary train....?

  
1348 views
May 05 2015 (12:28)
Maniaco*^~   2366 blog posts   221151 correct pred (73% accurate)
Re# 1455591-1            Tags   Past Edits
See the end date, 2099 ;-)

  
1325 views
May 05 2015 (12:29)
Thanks SWR   3894 blog posts   15 correct pred (79% accurate)
Re# 1455591-2            Tags   Past Edits
Interesting.....But no idea why is it temporary train and end date

  
1351 views
May 05 2015 (12:36)
venkatmta0504   24 blog posts
Re# 1455591-3            Tags   Past Edits
I think they are going to change 17226 timing from UBL TO BZA, and 18047 timing from HWH to Vascodagama

  
1362 views
May 05 2015 (12:42)
Thanks SWR   3894 blog posts   15 correct pred (79% accurate)
Re# 1455591-4            Tags   Past Edits
No idea!!!
Present timings are comfortable for 18047,if act return timings change will help more for HWH pass as many times 18048 reaches HWH late at odd hours.
If changed this may be given independent slot.
17226 UBL-BZA timings are also comfortable at present,have to check on what factors TT change are considered.

  
1317 views
May 05 2015 (13:05)
Venkat వెంకట్   13683 blog posts   13 correct pred (87% accurate)
Re# 1455591-5            Tags   Past Edits
Yes its temporary upto 2099 later possibilities of high speed trains may come
  
Site-Related
0 Followers
3864 views
Mar 31 2015 (13:23)   17225/Amaravati Express (PT)
 

Venkat వెంకట్   13683 blog posts   13 correct pred (87% accurate)
Entry# 1412780            Tags   Past Edits
This train just have 6 sleeper coaches. They are also not getting filled fully ??
Tue-Mar 31 RAC18 / RAC 8 GNWL# 11 / WL# 4 GNWL# 9 / WL# 1 0m old Refresh
Wed-Apr 01 GNWL# 2 / RAC50 GNWL# 8 / WL# 4 GNWL# 2 / RAC4 0m old Refresh
Thu-Apr 02 RAC25 / RAC 20 GNWL# 6 / WL# 2 GNWL# 2 / RAC1 0m old Refresh
Fri-Apr
...
more...
03 RAC14 / RAC 13 GNWL# 5 / RAC3 GNWL# 3 / WL# 1 0m old Refresh
Sat-Apr 04 GNWL# 46 / WL# 16 GNWL# 10 / WL# 2 GNWL# 7 / WL# 4 0m old Refresh
Sun-Apr 05 RAC20 / RAC 12 GNWL# 9 / WL# 5 GNWL# 6 / WL# 4

11 posts are hidden.

  
2553 views
Apr 02 2015 (16:26)
venkatmta0504   24 blog posts
Re# 1412780-14            Tags   Past Edits
to make 17225/17226 daily bay passengers association struggled for 2 years to make it.
particularly this train, passengers will book the tickets on same day. even i was booked at last moment and observed 100% occupancy during my journey. if you want to travel in holidays and festivals the situation will be quite opposite.
  
General Travel
0 Followers
1488 views
Feb 19 2015 (14:57)  
 

venkatmta0504   24 blog posts
Entry# 1373923            Tags   Past Edits
Guntur (Nallapadu) to Guntakal track electrification works are carried out at blistering-pace. By June end electric locos will run between guntur and narasaraopet.
Page#    18 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 9
Trains with ARP 15 Dep on: Tue Mar 14
Trains with ARP 30 Dep on: Wed Mar 29
Trains with ARP 120 Dep on: Tue Jun 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site