Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Mar 23, 2017 10:19:44 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Mar 23, 2017 10:19:44 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Akash Patel
Page#    4 Blog Entries  
  
★★★  Rail Fanning
0 Followers
1534 views
Jul 25 2015 (21:58)  
 

Syed Zohaibullah   143 blog posts
Entry# 1550660            Tags   Past Edits
Quadruple formation of EMD locos arrive from Hubli Diesel shed into the station loop line.

  
1009 views
Aug 01 2015 (19:55)
Akash Patel   5 blog posts   63 correct pred (71% accurate)
Re# 1550660-1            Tags   Past Edits
There should be a pilot on the third loco. Was there any?
  
★  Rail News
0 Followers
1899 views
New Facilities/TechnologyNER/North Eastern  -  
Aug 01 2015 (08:09)   110 की स्पीड से गोरखपुर तक दौड़ी इलेक्ट्रिक ट्रेन
 

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   5239 news posts
Entry# 1555156   News Entry# 235958         Tags   Past Edits
भटनी/देवरिया। निसंभटनी से गोरखपुर तक विद्युतीकरण का काम पूरा होने के बाद शुक्रवार को मुख्य संरक्षा आयुक्त सदर और भटनी स्टेनशन पर रुक कर हाल जाना। स्पेशल ट्रेन से आए सीआरएस ने दोनों स्टेशनों का निरीक्षण किया। इसके बाद मुख्यसंरक्षा आयुक्त की इलेक्ट्रिक ट्रेन करीब 110 किमी की रफ्तार से गोरखपुर तक दौड़ी। मुख्य संरक्षा आयुक्त पीके वाजपेयी गोरखपुर से करीबन डेढ़ बजे सदर, भटनी में ढाई बजे पहुंचे। सदर रेलवे स्टेनशन पर एसएस उदय प्रताप से आवश्यक जानकारी ली। इस पर एसएस ने कुछ अम बातों को रखा। इसके बाद वह भटनी के लिए रवाना हुए। यहां पर डीआरएम वाराणसी एस के कश्यप, प्रवर मण्डल परिचालन पी के पाण्डेय, सीनियर डीएसटीई मानवेंन्द्र सिंह के साथ स्टेशन का निरीक्षण किया।मुख्य संरक्षा प्लेटफार्म नम्बर एक के पश्चिमी छोर पर निरीक्षण के दौरान विद्युतीकरण का काम कर रहे मेठ से तार बिछने से लेकर काम के दौरान सुरक्ष उपकरणों की जानकारी ली। उन्होंने...
more...
विद्युतीकरण के बाद छपरा से लेकर भटनी तक बिजली से हुई दुर्घटना की जानकारी एसएस से ली। छत पर यात्रियों के यात्र करने के बारे में पूछा। अधिकारियों से सुरक्षा पोस्टर, आपात कालीन उपचार का हाल जाना। सबकुछ देखने के बाद मुख्य सरंक्षा आयुक्त की ट्रेन भटनी से करीब 3:25 बजे गोरखपुर के लिए 110 किमी प्रति घन्टा की रफ्तार से रवाना हुई। अधिकारियों के अनुसार सुरक्षा आयुक्त की ट्रेन 4:40 बजे गोरखपुर पहुंच गई। स्टेशन अधीक्षक आ र के यादव, टीआई उमाकान्त, टीआई अजित कुमार, चीफ इंजीनियर इलेक्ट्रिक राजीव कटारिया, टीआई नूरूल इस्लाम, टीआई संजय श्रीवास्तव आदि मौजूद रहे

3 posts are hidden.

  
2725 views
Aug 01 2015 (11:56)
Akash Patel   5 blog posts   63 correct pred (71% accurate)
Re# 1555156-4            Tags   Past Edits
Where is the train?????

  
2537 views
Aug 01 2015 (13:38)
☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   12356 blog posts   3041 correct pred (65% accurate)
Re# 1555156-5            Tags   Past Edits
Which train??
  
★  Rail Fanning
0 Followers
2077 views
Jul 30 2015 (11:47)  
 

Akash Patel   5 blog posts   63 correct pred (71% accurate)
Entry# 1553757            Tags   Past Edits
Spotted brand new LHB rake with 2nd Class Sleeper coaches and Bio Toilets for South Western Railway at Sangli Railway Station. It was a rarity here and caught a few eyeballs, including me. Permissible speed: 160 km/h (see the rear of Generator Car)

  
1850 views
Jul 30 2015 (11:49)
Guest: 7df5da41   show all posts
Re# 1553757-1            Tags   Past Edits
Kaun Si Train Liye Ho Sakta Hai

  
1702 views
Jul 30 2015 (12:40)
SCR Godavari Express~   2353 blog posts   11 correct pred (92% accurate)
Re# 1553757-2            Tags   Past Edits
Of all the zones SCR is very poor in getting LHB rakes. Even thw rakes ir got for AC express are being given to other zones like ECR and SWR. See the power car it belongs to SC

  
1720 views
Jul 30 2015 (12:46)
Akash Patel   5 blog posts   63 correct pred (71% accurate)
Re# 1553757-3            Tags   Past Edits
But the whole rake is SW

  
1653 views
Jul 30 2015 (13:06)
SCR Godavari Express~   2353 blog posts   11 correct pred (92% accurate)
Re# 1553757-4            Tags   Past Edits
I know that. What I am saying is about the apathy shown by Railway Board to SCR always. They allocated so many LHB rakes for SWR where as for SCR ..nothing given. Even whatever given also being transferred to other zones.... though SCR has made good revenues consistently for the last 4 years...
  
Rail News
0 Followers
1865 views
New Facilities/Technology
Jun 26 2015 (18:18)   IRCTC to install 5 more servers to strengthen its e-ticketing system
 

विश्व नाथ*^   3552 news posts
Entry# 1525224   News Entry# 231039         Tags   Past Edits
The Indian Railway Catering and Tourism Corporation will install five high-capacity servers, imported from Singapore, to speed up its e-ticketing operations. The initiative to import five new servers from Singapore comes close on the heels of introduction of two new high-speed servers by IRCTC to Passenger Reservation System (PRS) earlier this month, which have doubled the peak-time efficiency for booking tatkal tickets at the railways’ ticketing website. With five more servers, the number of concurrent users is expected to go up from the existing 180,000 to 300,000 while the existing capacity to book around 15,000 tickets per minute will go up considerably. “Five new HP Itanium servers, to be installed shortly in the Passenger Reservation System (PRS), would considerably speed up the booking of e-tickets and streamline the Next Generation E-Ticketing System (NGET),” IRCTC Chairman and Managing Director AK Manocha on Friday said.“There are already five servers in the PRS and...
more...
with the addition of five new servers from Singapore, their number would go up to ten,” he said.
The operationalisation of five new high-speed servers is expected to substantially enhance the website’s performance. Also, the entire procedure of e-ticketing will get a face-lift with improvement in efficiency of the website, log-in time and payment gateway.
IRCTC is also planning to increase its network bandwidth from the existing 1.4 GB to 1.7 GB in order to enhance the performance of e-ticketing operations.
Earlier on June 1, IRCTC had installed two Linux-enabled servers, substantially raising the online booking capacity, much to the relief of passengers wanting to book a tatkal ticket. The website witnesses faces heavy rush in its first 15 minutes as tatkal reservation opens at 10 AM every day.
The introduction of five new servers, which are in the process of being installed, was vital, considering that 54 per cent train tickets in the country are booked through the IRCTC website.
The average daily sale of train tickets through the portal was around 5.5 to 6 lakh. It has registered a record 14,800 tickets per minute.
IRCTC, a PSU of Railways, had introduced e-ticketing in 2002 through its digital platform.

  
1151 views
Jun 26 2015 (19:49)
Akash Patel   5 blog posts   63 correct pred (71% accurate)
Re# 1525224-1            Tags   Past Edits
These imported HP Itanium servers are now outdated and are discontinued from product line. India is a dumping ground.

4 posts are hidden.
Page#    4 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 2
Trains with ARP 15 Dep on: Fri Apr 7
Trains with ARP 30 Dep on: Sat Apr 22
Trains with ARP 120 Dep on: Fri Jul 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site