Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 27, 2017 08:01:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 27, 2017 08:01:36 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by jagawat
Page#    8 Blog Entries  
  
General Travel
0 Followers
4587 views
Sep 16 2016 (08:34)   22664/Jodhpur - Chennai Egmore SF Express | RANI/Rani (2 PFs)
 

jagawat   8 blog posts
Entry# 1992954            Tags   Past Edits
कृपया जोधपुर- चेन्नई एग्मोर - जोधपुर 16125 & 16126 के फेरे बढ़ाये जाये, साथ ही रानी (N.W.R.) पर हाल्ट किया जाये

  
4484 views
Sep 16 2016 (08:36)
©The Dark Lord™   5031 blog posts
Re# 1992954-1            Tags   Past Edits
Ye sab aap yaha kyu post ker rahe hai, Railway authorities ko bataye.

  
4526 views
Sep 16 2016 (08:38)
Boxer Bhai   38199 blog posts   12668 correct pred (61% accurate)
Re# 1992954-2            Tags   Past Edits
Follow one post, this pvt site, suggest halts via Twitter,fb,pg portal to railways
  
Rail News
0 Followers
975 views
IR AffairsSCR/South Central  -  
Nov 11 2015 (07:52)   Electrification of Wadi-Raichur-Guntakal track to be completed by March
 
Entry# 1645468   News Entry# 247415         Tags   Past Edits
The electrification of railway track between Wadi in Karnataka and Guntakal in Andhra Pradesh is expected to be completed by March next year.
Addressing presspersons at Raichur Railway Station here on Monday, A.. Sanjeeva Rao, Senior Divisional Electrical Engineer, Guntakal Division, South Central Railways, said the work on the 228 route-km stretch was in its final stage.
“The electrification of the stretch was taken up at a cost of Rs. 194.19 crore. The project is being executed by Rail Vikas Nigam and is expected to be completed within four months. Once the project
...
more...
is commissioned, we can seek more number of trains on the same track. It would be beneficial to public as well as the Railways,” he said. As per the details provided, electrification on the stretches between Wadi and Yedlapur, and Guntakal and Adoni have been completed and the stretch between Adoni and Raichur is under progress. “The completion of electrification between Wadi and Guntakal will enable us to run electric engines between Mumbai and Raichur,” he said.
Mr. Rao said Guntakal division, with 46 per cent of railway track electrification, was carrying 54.54 per cent of goods traffic and 25.12 per cent passenger traffic in the year 2015-16. “Guntakal division is the second largest division in the South Central Railway in terms of length of track network of 1,400 route-km, of which 635 route-km is electrified,” he said.
Mr. Rao said electrification of 46.2 route-km between Guntakal and Ballari section is being executed at a cost of Rs. 92.83 crore and is expected to be completed by November 2017. The electrification of 168 route-km on the Guntakal-Nadyal and Gooty-Pendekal sections is in progress at a cost of Rs. 51.54 crore and is expected to be completed by February 2017. The electrification of Guntakal-Kallur section, a 40.2 route-km stretch, has been awarded to the Rail Vikas Nigam. “Once all the ongoing projects of electrification are completed, the Guntakal division would be top among all the divisions in South Central Railway as far as electrification is concerned,” Mr. Rao said. He clarified that the recently built railway over-bridge would not be demolished for the purpose of track electrification.

1 posts are hidden.

  
3783 views
Nov 12 2015 (21:33)
jagawat   8 blog posts
Re# 1645468-2            Tags   Past Edits
But where is electrifying work going between pune & wadi
  
Predictions: 47
confirm: 46
rac: 1
wl: 0
Journey: Fri Jan 01, 2016 @ 19:09
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 69
Travel: SGD/Songadh   to   BDTS/Bandra Terminus   |   752 km / 780 km
12972/Bhavnagar (T.) - Mumbai Bandra (T.) Express
Entry# 1600319

Posted by: jagawat   8 blog posts
PNR: 863-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Sep 26 2015 (11:29)
Passenger 1: Can/Mod (Booking Status: RAC 10,GNWL)
Passenger 2: RAC 10 (Booking Status: RAC 11,GNWL)
Passenger 3: RAC 11 (Booking Status: RAC 12,GNWL)
Passenger 4: RAC 12 (Booking Status: W/L 1,GNWL)
Passenger 5: Waitlist# 1 (Booking Status: W/L 2,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 01 2016 (14:54)
Passenger 1: Can/Mod (Booking Status: RAC 10,GNWL)
Passenger 2: BX1,17 [LB] (Booking Status: RAC 11,GNWL)
Passenger 3: BX1,20 [LB] (Booking Status: RAC 12,GNWL)
Passenger 4: BX1,18 [MB] (Booking Status: W/L 1,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 2,GNWL)
Chart PREPARED

Full PNR Status History (4 statuses)
Status as of: Jan 01 2016 (14:54)
Passenger 1: Can/Mod (Booking Status: RAC 10,GNWL)
Passenger 2: BX1,17 [LB] (Booking Status: RAC 11,GNWL)
Passenger 3: BX1,20 [LB] (Booking Status: RAC 12,GNWL)
Passenger 4: BX1,18 [MB] (Booking Status: W/L 1,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 2,GNWL)
Chart PREPARED

Status as of: Jan 01 2016 (12:00)
Passenger 1: Can/Mod (Booking Status: RAC 10,GNWL)
Passenger 2: RAC 2 (Booking Status: RAC 11,GNWL)
Passenger 3: RAC 3 (Booking Status: RAC 12,GNWL)
Passenger 4: RAC 4 (Booking Status: W/L 1,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 2,GNWL)
Chart NOT Prepared

Status as of: Dec 31 2015 (11:21)
Passenger 1: Can/Mod (Booking Status: RAC 10,GNWL)
Passenger 2: RAC 3 (Booking Status: RAC 11,GNWL)
Passenger 3: RAC 4 (Booking Status: RAC 12,GNWL)
Passenger 4: RAC 5 (Booking Status: W/L 1,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 2,GNWL)
Chart NOT Prepared

Status as of: Dec 26 2015 (12:07)
Passenger 1: Can/Mod (Booking Status: RAC 10,GNWL)
Passenger 2: RAC 8 (Booking Status: RAC 11,GNWL)
Passenger 3: RAC 9 (Booking Status: RAC 12,GNWL)
Passenger 4: RAC 10 (Booking Status: W/L 1,GNWL)
Passenger 5: Can/Mod (Booking Status: W/L 2,GNWL)
Chart NOT Prepared


  
2845 views
Sep 27 2015 (23:11)
S Verma*^~   6016 blog posts   119448 correct pred (90% accurate)
Re# 1600319-1            Tags   Past Edits
#RACallocation 12 in AC-3 from SGD to BDTS.

1 posts are hidden.
  
General Travel
0 Followers
2390 views
Sep 22 2015 (18:50)   19419/Chennai Central - Ahmedabad Express
 

swamiye saranam ayyappa   1096 blog posts   1 correct pred (50% accurate)
Entry# 1597153            Tags   Past Edits
the timing of chennai ahmedabad must be changed it must depart chennai central at 10 a.m and arrive ahmedabad at 15:30 or 16:00 pm next day,,,,coz on return direction it takes one night but to ahmedabad it takes two nights,,,,it also coz disturbance to fast emu that depart mas at same 20:00pm,,,when ahmedabad chennai 19420 runs on perfect timetable,y 19419 must run on bad timetable with two nights witha long time,,,how many of them agreeing to my timetable of train departing mas at 10:00 am and arrive adi at 15:30pm,,,,

6 posts are hidden.

  
717 views
Sep 22 2015 (19:15)
jagawat   8 blog posts
Re# 1597153-7            Tags   Past Edits
Arrival time at adi before 4.30 AM SO ONWARD ARAVALI EXP CA CATCH

46 posts are hidden.
  
General Travel
0 Followers
550 views
Jul 30 2015 (20:57)  
 

jagawat   8 blog posts
Entry# 1554274            Tags   Past Edits
19419 mas-adi today start RT
3ac coach 2004jul
Not clean very bad small
Can't go in toilet
  
General Travel
0 Followers
772 views
Jul 06 2015 (19:27)  
 

jagawat   8 blog posts
Entry# 1533850            Tags   Past Edits
Pls add th stop at RANI (nwr) of 16125 & 16126 ms -ju-ms exp

  
687 views
Jul 06 2015 (19:30)
A capella*^~   9376 blog posts   2459 correct pred (77% accurate)
Re# 1533850-1            Tags   Past Edits
This is private site Sir. please take your request to your MP or Station master.

  
647 views
Jul 06 2015 (19:31)
SGNR HS Inaugural 27 Feb^~   78815 blog posts   5089 correct pred (78% accurate)
Re# 1533850-2            Tags   Past Edits
already it has many halts... rani halt not reqd ..
  
★★★  Rail Fanning
1 Followers
4600 views
Apr 04 2015 (17:04)   12850/Pune - Bilaspur SF Express (PT) | NGP/Nagpur Junction (8 PFs)
 

2017Year of hopes for JBP   3152 blog posts   44 correct pred (50% accurate)
Entry# 1417973            Tags   Past Edits
#MYRAILFANNING
Nagpur Jn. Diamond Crossing and i think d only crossing left in India and The greatest place for railfanning and what a marvelous peace of rail engineering n hats off to railway engineers !!!

7 posts are hidden.

  
1058 views
Apr 04 2015 (20:21)
jagawat   8 blog posts
Re# 1417973-8            Tags   Past Edits
yes another at BHUSAWAL Jn

  
763 views
Apr 04 2015 (20:23)
jagawat   8 blog posts
Re# 1417973-9            Tags   Past Edits
AND ALSO AT MARWAR Jn EARLIAR, BUT AFTER BG CONVERT I DONT KNOW!

  
1018 views
Apr 04 2015 (21:21)
2017Year of hopes for JBP   3152 blog posts   44 correct pred (50% accurate)
Re# 1417973-10            Tags   Past Edits
may b there at bsl jn. but i have nver seen it as i am travlng freqntly to CSTM/PUNE so i didnt got a chance to see it and even in kyn also i have never seen this type of crossing

  
789 views
Apr 04 2015 (21:56)
मोहम्मद राशिद खान*^~   5490 blog posts   8009 correct pred (86% accurate)
Re# 1417973-11            Tags   Past Edits
At Bhusaval. .... ????? Don't think so

  
1047 views
Apr 04 2015 (22:05)
2017Year of hopes for JBP   3152 blog posts   44 correct pred (50% accurate)
Re# 1417973-12            Tags   Past Edits
ok if u hav any photo of diamond crossing at bsl jn. then pls share

13 posts are hidden.
  
Greetings
0 Followers
1645 views
Apr 04 2015 (19:00)   JP/Jaipur Junction (6 PFs)
 

मेवाड़ एक्सप्रेस~   2030 blog posts   177 correct pred (77% accurate)
Entry# 1418128            Tags   Past Edits
वित्तीय वर्ष 2014-15 में पार किया 7000 करोड रू0 का आकड़ा
उत्तर पश्चिम रेलवे पर वर्ष 2014-15 के दौरान उच्च स्तरीय
कार्य निष्पादन के फलस्वरूप विभिन्न क्षेत्रों में आय में नये
कीर्तिमान बनाते हुये लगभग 7090 करोड रूपये की
आय
...
more...
प्राप्त कर सम्पूर्ण भारतीय रेलवे के अग्रणी
रेलों में स्थान प्राप्त किया है।
उत्तर पश्चिम रेलवे पर वर्ष 2014-15 में यात्री आय 1671.92
करोड़ रूपये प्राप्त हुई जोकि पिछले वर्ष की इसी
अवधि की तुलना में 16.77 प्रतिशत अधिक है। इसी
प्रकार माल भाडा से कुल आय से 4965.63 करोड़ रूपये अर्जित किये जोकि
गत वर्ष के 3972.34 करोड़ रूपये की तुलना में 25.01 प्रतिशत
अधिक है। अन्य कोचिंग आय से 278.87 करोड़ रूपये़ रूपये प्राप्त हुये है,
जोकि गत वर्ष की तुलना में 14.72 प्रतिशत अधिक है।
इसी के साथ 172.38 करोड रू0 की विविध आय प्राप्त
कर कुल 7088.80 करोड़ रूपये अर्जित की गई है, जोकि गत
वर्ष की इसी अवधि के 5806.97 करोड़ रूपये
की तुलना में 22 प्रतिशत अधिक है।
उत्तर पष्चिम रेलवे पर सूचना प्रौद्योगिकी के अधिकतम उपयोग व
आय में सुधार तथा खर्च को तर्क संगत कम कर उत्तर पश्चिम रेलवे ने
अपने परिचालन अनुपात में सुधार करते हुये 90.6 प्रतिशत का सार्थक
परिचालन अनुपात प्राप्त किया है।
Source- click here

1 posts are hidden.

  
1228 views
Apr 04 2015 (20:28)
jagawat   8 blog posts
Re# 1418128-3            Tags   Past Edits
16126/ 16125 JU-MAS VIA ABUROAD ALWAY W/L EVEN REGRET ON OPENING MINUTs
KYO NAHI USKE PHERE BADHYE JAYE
MAS - ADI KO JU TAK BADAYA JAYE

  
1229 views
Apr 04 2015 (20:31)
SGNR HS Inaugural 27 Feb^~   78815 blog posts   5089 correct pred (78% accurate)
Re# 1418128-4            Tags   Past Edits
During rail budget , mene Railway minister ko Jodhpur Rameswaram via chennai ka suggestion bheja tha lekin is budget me Ek bhi new train nahi chalayi
:(
Page#    8 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 9
Trains with ARP 15 Dep on: Tue Mar 14
Trains with ARP 30 Dep on: Wed Mar 29
Trains with ARP 120 Dep on: Tue Jun 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site