Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jun 24, 2017 23:17:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jun 24, 2017 23:17:09 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ashfak Ahmed Moosa
Page#    41 Blog Entries  next>>
  
★★★  General Travel
0 Followers
7225 views
Jan 03 2017 (11:49)   12141/Mumbai LTT - Patliputra SF Express (PT) | SQL/Sontalai (2 PFs)

waiting for PPI JBP elfication~   3414 blog posts   44 correct pred (50% accurate)
Entry# 2114469            Tags   Past Edits
#ETALDELECTRIFICATIONUPDATES
#ELECTRIFICATIONSONTALAI
When i am travelling towards JBP from KYN via ET i have spotted work of electrification b/w ET-JBP section and also saw the work of doubling started in Bagratawa-sontalai section and i am happy to see that pace of work is very fast b/w ET-PPI section and around 95% work is completed between ET-PPI and work between PPI-NU is very slow but its good that in many places OHE holes has been digged and in some places work of digging OHE holes is going on so hopefully by this
...
more...
year mid we can expect OHE poles and wiring on PPI-NU section and on ET-PPI section only place remaining for fitting OHE pole is bagratawa bridge and even OHE poles with wires is being fitted before and after tunnel also and even hooks has been installed inside tunnel to fit OHE wiring also and spotted crew and wagons used for installing OHE and wires and hopefully they will be connecting the new line with the existing loop line before Bagratawa going towards NU and below is the details of pics-
1,2nd pic-Train stopped for crossing and spotted unfinished OHE wiring at sonatalai
3rd pic-shunting loco of OHE wiring van
4,5th pic-trees cutted to lay base for new BG line b/w sontalai-Bagratawa section and this work is started from sontalai end.
6,7,8,9,10,11th pic-going towards tawa bridge and OHE poles with wires installed
12th pic- OHE pole installed till the tawa bridge entry from sontalai side.
13th pic- crossing Tawa river and no OHE poles on the bridge but can be seen soon.
15,16,17th pic-going towards tunnel and OHE poles with wires can be seen.
18,19,20,21st pic- Going towards Bagratawa station and OHE poles with OHE wires can be seen.
22,23,24,25th pic- Loop line starts before entering Bagratawa station and Hole digging work beside existing loop line is going on so may be this loop line will connecting to the new line once its been laid b/w sontalai-bagratawa
26,27,28,29th pic- spotted OHE wiring van with wires and other equipments on existing loop line before Bagratawa.
30-32nd pic- entering already wired Bagratawa station
33,34th pic- spotted Sabarmati WDG4 monster with goods rake waiting for green signal at Bagratawa station.
so these all information i got while travelling towrds JBP on 24th Dec,2016 so if any member have any new information's aftr 24th pls share

8 posts are hidden.

  
Jan 04 2017 (23:45)
Ashfak Ahmed Moosa   62 blog posts
Re# 2114469-9            Tags   Past Edits
Pics of electrification work between jbp katni dumping near sihora station 70percent work completed work is going on good pace

  
841 views
Jan 04 2017 (23:50)
Guest: 3908e828   show all posts
Re# 2114469-10            Tags   Past Edits
bhut tezi se electrification hua h yha

  
888 views
Jan 05 2017 (00:18)
Ashfak Ahmed Moosa   62 blog posts
Re# 2114469-11            Tags   Past Edits
Yes bro kam ab tezi se ho raha hai ye pics aj subah k hai video b hai par upload nai ho rahi hai

  
865 views
Jan 05 2017 (10:02)
waiting for PPI JBP elfication~   3414 blog posts   44 correct pred (50% accurate)
Re# 2114469-12            Tags   Past Edits
means ek bar ET-PPI section elocos k liye shuru hoga to jald hi PPI-NU-JBP-KTE section bhi tayyar ho jayga so ab to keh sakte hai ki atleast Dec 2017 tak ET-JBP-KTE section me elocos dodne lagenge or bahut si trains ko ET me loco changing se chutkara mil jaygaa or apke paas or pics ho JBP-KTE section me OHE poles with wiring k sath to post kariye

  
3125 views
Jan 05 2017 (10:04)
waiting for PPI JBP elfication~   3414 blog posts   44 correct pred (50% accurate)
Re# 2114469-13            Tags   Past Edits
waise agar CBI raid wala mamla nai hota to JBP-KTE section pehle hi complete ho chuka hota magar jo hota hai ache k liye hota hai isliye ab jo kaam ho raha hoga JBP-KTE section me wo sahi standards k hisaab se ho rha hoga so agar ET-PPI work ki pace jaise JBP-KTE me bhi kaam ho to ye bhi 2-4 mahine me complete ho jayga

4 posts are hidden.
  
★★★  General Travel
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express | JBP/Jabalpur Junction (6 PFs) | ET/WDP-4B

New Katni Junction Electric Loco Shed~   474 blog posts   10 correct pred (59% accurate)
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

17 posts are hidden.

  
★  
8922 views
Jan 04 2017 (23:17)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-19            Tags   Past Edits
Jbp katni electrification work 70percent kam ho gaya hai sihora station k pas dumping yard hai jaha electrification mai lagney wala saman rakha hai

  
9062 views
Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   41 blog posts
Re# 2102196-20            Tags   Past Edits
Very happy to see that the work is restarted hope it finishes soon

  
8752 views
Jan 05 2017 (00:11)
New Katni Junction Electric Loco Shed~   474 blog posts   10 correct pred (59% accurate)
Re# 2102196-21            Tags   Past Edits
70% ho gya?

  
9020 views
Jan 05 2017 (00:25)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-22            Tags   Past Edits
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
  
Rail News
0 Followers
3437 views
New Facilities/TechnologyWCR/West Central  -  
Jul 14 2016 (20:15)   Jabalpur - Itarsi Electrified route to be operational by July '17, MKP-MJG by Dec '16
 

🚅OHE over JBP🔰~   8 news posts
Entry# 1929885   News Entry# 273736         Tags   Past Edits
In a conference held in Shakti Bhavan, Jabalpur, Deadlines for Electrification were decided which is ongoing between Itarsi-Jabalpur and Jabalpur-Allahabad. The work was optimised to be completed at various sectional deadlines. Much hyped Itarsi-Jabalpur route is expected to be completed by July 2017 whereas MKP-MJG by 2016 Dec. Overall, the project was decided to conclude in March 2018 with STA-KTE being last section electrified.

3 posts are hidden.

  
Jul 15 2016 (00:28)
Ashfak Ahmed Moosa   62 blog posts
Re# 1929885-4            Tags   Past Edits
Par frnds mujhe lagta hai railway ko kte jbp et ko pahle complete kar dena chaiye tha taki kte mai loco change karke train elocos k sath agey mumbai aur south k liye ja sakti thi par railway k planing alag hi hai
  
★★★  Rail Fanning
0 Followers
8230 views
Jul 10 2016 (15:42)   X10001/Satpura Express (NG) | GRG/Gwarighat (2 PFs)
 

Immortal Satpura Express 10001*^~   1333 blog posts   170 correct pred (52% accurate)
Entry# 1925046            Tags   Past Edits
Jabalpur - Balaghat Gauge Conversion work under full swing
New Building of Gwarighat Station
New FOB constructed at New Gwarighat Station
& tracks laid on narmada River Bridge

8 posts are hidden.

  
1415 views
Jul 10 2016 (22:29)
Ashfak Ahmed Moosa   62 blog posts
Re# 1925046-9            Tags   Past Edits
Great job sir nic pics

8 posts are hidden.
  
★  General Travel
0 Followers
5432 views
Jul 09 2016 (23:21)   JBP/Jabalpur Junction (6 PFs)
 

JaB DiL DhadaKtA h   52 blog posts
Entry# 1924235            Tags   Past Edits
Jabalpur- itarsi electrification update:
Wiring done Near Pipariya

2 posts are hidden.

  
2405 views
Jul 10 2016 (02:59)
Ashfak Ahmed Moosa   62 blog posts
Re# 1924235-3            Tags   Past Edits
Thanx frnd but apney detail report nai di aur kachpura jbp ka kya hua kam shuru hua yaha par

  
2035 views
Jul 10 2016 (10:36)
🚅OHE over JBP🔰~   1268 blog posts   74 correct pred (71% accurate)
Re# 1924235-4            Tags   Past Edits
KEQ-JBP ka kaam to shayad baad me hi shuru hoga. News me aya hai ki CORE abhi ET-PPI pe focus kar raha hai.

2 posts are hidden.
Page#    41 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jul 4
Trains with ARP 15 Dep on: Sun Jul 9
Trains with ARP 30 Dep on: Mon Jul 24
Trains with ARP 120 Dep on: Sun Oct 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.