Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Mar 27, 2017 16:27:41 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Mar 27, 2017 16:27:41 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Ashfak Ahmed Moosa
Page#    41 Blog Entries  next>>
  
★★★  General Travel
0 Followers
5678 views
Jan 03 2017 (11:49)   12141/Mumbai LTT - Patliputra SF Express (PT) | SQL/Sontalai (2 PFs)

2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Entry# 2114469            Tags   Past Edits
#ETALDELECTRIFICATIONUPDATES
#ELECTRIFICATIONSONTALAI
When i am travelling towards JBP from KYN via ET i have spotted work of electrification b/w ET-JBP section and also saw the work of doubling started in Bagratawa-sontalai section and i am happy to see that pace of work is very fast b/w ET-PPI section and around 95% work is completed between ET-PPI and work between PPI-NU is very slow but its good that in many places OHE holes has been digged and in some places work of digging OHE holes is going on so hopefully by this
...
more...
year mid we can expect OHE poles and wiring on PPI-NU section and on ET-PPI section only place remaining for fitting OHE pole is bagratawa bridge and even OHE poles with wires is being fitted before and after tunnel also and even hooks has been installed inside tunnel to fit OHE wiring also and spotted crew and wagons used for installing OHE and wires and hopefully they will be connecting the new line with the existing loop line before Bagratawa going towards NU and below is the details of pics-
1,2nd pic-Train stopped for crossing and spotted unfinished OHE wiring at sonatalai
3rd pic-shunting loco of OHE wiring van
4,5th pic-trees cutted to lay base for new BG line b/w sontalai-Bagratawa section and this work is started from sontalai end.
6,7,8,9,10,11th pic-going towards tawa bridge and OHE poles with wires installed
12th pic- OHE pole installed till the tawa bridge entry from sontalai side.
13th pic- crossing Tawa river and no OHE poles on the bridge but can be seen soon.
15,16,17th pic-going towards tunnel and OHE poles with wires can be seen.
18,19,20,21st pic- Going towards Bagratawa station and OHE poles with OHE wires can be seen.
22,23,24,25th pic- Loop line starts before entering Bagratawa station and Hole digging work beside existing loop line is going on so may be this loop line will connecting to the new line once its been laid b/w sontalai-bagratawa
26,27,28,29th pic- spotted OHE wiring van with wires and other equipments on existing loop line before Bagratawa.
30-32nd pic- entering already wired Bagratawa station
33,34th pic- spotted Sabarmati WDG4 monster with goods rake waiting for green signal at Bagratawa station.
so these all information i got while travelling towrds JBP on 24th Dec,2016 so if any member have any new information's aftr 24th pls share

8 posts are hidden.

  
Jan 04 2017 (23:45)
Ashfak Ahmed Moosa   62 blog posts
Re# 2114469-9            Tags   Past Edits
Pics of electrification work between jbp katni dumping near sihora station 70percent work completed work is going on good pace

  
635 views
Jan 04 2017 (23:50)
My new name Divans Aught Yup^~   32219 blog posts   23057 correct pred (76% accurate)
Re# 2114469-10            Tags   Past Edits
bhut tezi se electrification hua h yha

  
671 views
Jan 05 2017 (00:18)
Ashfak Ahmed Moosa   62 blog posts
Re# 2114469-11            Tags   Past Edits
Yes bro kam ab tezi se ho raha hai ye pics aj subah k hai video b hai par upload nai ho rahi hai

  
663 views
Jan 05 2017 (10:02)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2114469-12            Tags   Past Edits
means ek bar ET-PPI section elocos k liye shuru hoga to jald hi PPI-NU-JBP-KTE section bhi tayyar ho jayga so ab to keh sakte hai ki atleast Dec 2017 tak ET-JBP-KTE section me elocos dodne lagenge or bahut si trains ko ET me loco changing se chutkara mil jaygaa or apke paas or pics ho JBP-KTE section me OHE poles with wiring k sath to post kariye

  
2249 views
Jan 05 2017 (10:04)
2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Re# 2114469-13            Tags   Past Edits
waise agar CBI raid wala mamla nai hota to JBP-KTE section pehle hi complete ho chuka hota magar jo hota hai ache k liye hota hai isliye ab jo kaam ho raha hoga JBP-KTE section me wo sahi standards k hisaab se ho rha hoga so agar ET-PPI work ki pace jaise JBP-KTE me bhi kaam ho to ye bhi 2-4 mahine me complete ho jayga

4 posts are hidden.
  
★★★  General Travel
Dec 23 2016 (21:55)   12670/Ganga Kaveri Express | JBP/Jabalpur Junction (6 PFs) | ET/WDP-4B

12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Entry# 2102196            Tags   Past Edits
#ETALDELECTRIFICATION
In a nutshell, I've closely identified the progress of electrification work between Jabalpur and Itarsi. The details are given below.
1. Jabalpur (excl.)-Narsinghpur work is almost done. Wiring is complete. Work left is only on the two bridges over Narmada river. I think they are deciding to electrify KEQ-JBP at the end. Pic is given in my trip blog.
2. The pic
...
more...
no. 1 & 2 gives the good news we all have been waiting for. The final section i.e, Kareli-Pipariya work has started. Holes have been dug from Gardarwara till Pipariya. You can see works-man digging holes for poles. Soon they'll reach Kareli.
3. Pipariya station is completely under wires now. Pics 3,4,5 shows the status. Wiring from PPI-BGRT is done. At few poles it is to be tightened. I've seen works-man tighten the wires, but due to immense speed of the train (thanks to ET shed monster WDP4b :p ) i couldn't capture those instants. Pics- 8,9 shows BRGT station status.
4. The only single line section of ET-ALD route i.e, BRGT-SQL has also begun to come under wires. Poles and wires are installed and only tightening needs to be done. Pics 9,10,11 are evident. Even bridge over TAWA river is getting poles to be installed.
5. The section after SQL is completed. Only tightening of wires is left at 4-5 poles.
Work is going on at decent pace. CORE is all set to trail the electrified section of ET-PPI in January and is working on that. I hope that was useful :)

17 posts are hidden.

  
★  
5665 views
Jan 04 2017 (23:17)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-19            Tags   Past Edits
Jbp katni electrification work 70percent kam ho gaya hai sihora station k pas dumping yard hai jaha electrification mai lagney wala saman rakha hai

  
5689 views
Jan 04 2017 (23:42)
Mohammad Sharique Siddiqui   35 blog posts
Re# 2102196-20            Tags   Past Edits
Very happy to see that the work is restarted hope it finishes soon

  
5507 views
Jan 05 2017 (00:11)
12121 मध्य प्रदेश संपर्क क्रांति एक्सप्रेस~   410 blog posts   5 correct pred (100% accurate)
Re# 2102196-21            Tags   Past Edits
70% ho gya?

  
5644 views
Jan 05 2017 (00:25)
Ashfak Ahmed Moosa   62 blog posts
Re# 2102196-22            Tags   Past Edits
Yes bro aj hi dayodaya express sey jaipur se lauta hu tab mainey dekha hai70na sahi par 60percent to done hai
  
Rail News
0 Followers
2579 views
New Facilities/TechnologyWCR/West Central  -  
Jul 14 2016 (20:15)   Jabalpur - Itarsi Electrified route to be operational by July '17, MKP-MJG by Dec '16
 

OHE over JBP~   8 news posts
Entry# 1929885   News Entry# 273736         Tags   Past Edits
In a conference held in Shakti Bhavan, Jabalpur, Deadlines for Electrification were decided which is ongoing between Itarsi-Jabalpur and Jabalpur-Allahabad. The work was optimised to be completed at various sectional deadlines. Much hyped Itarsi-Jabalpur route is expected to be completed by July 2017 whereas MKP-MJG by 2016 Dec. Overall, the project was decided to conclude in March 2018 with STA-KTE being last section electrified.

3 posts are hidden.

  
Jul 15 2016 (00:28)
Ashfak Ahmed Moosa   62 blog posts
Re# 1929885-4            Tags   Past Edits
Par frnds mujhe lagta hai railway ko kte jbp et ko pahle complete kar dena chaiye tha taki kte mai loco change karke train elocos k sath agey mumbai aur south k liye ja sakti thi par railway k planing alag hi hai
  
★★★  Rail Fanning
0 Followers
6691 views
Jul 10 2016 (15:42)   10001/Satpura Express (NG) | GRG/Gwarighat (2 PFs)
 

Immortal Satpura Express 10001*^~   1302 blog posts   133 correct pred (53% accurate)
Entry# 1925046            Tags   Past Edits
Jabalpur - Balaghat Gauge Conversion work under full swing
New Building of Gwarighat Station
New FOB constructed at New Gwarighat Station
& tracks laid on narmada River Bridge

8 posts are hidden.

  
1226 views
Jul 10 2016 (22:29)
Ashfak Ahmed Moosa   62 blog posts
Re# 1925046-9            Tags   Past Edits
Great job sir nic pics

8 posts are hidden.
  
★  General Travel
0 Followers
4577 views
Jul 09 2016 (23:21)   JBP/Jabalpur Junction (6 PFs)
 

JaB DiL DhadaKtA h   52 blog posts
Entry# 1924235            Tags   Past Edits
Jabalpur- itarsi electrification update:
Wiring done Near Pipariya

2 posts are hidden.

  
2036 views
Jul 10 2016 (02:59)
Ashfak Ahmed Moosa   62 blog posts
Re# 1924235-3            Tags   Past Edits
Thanx frnd but apney detail report nai di aur kachpura jbp ka kya hua kam shuru hua yaha par

  
1754 views
Jul 10 2016 (10:36)
OHE over JBP~   1113 blog posts   64 correct pred (72% accurate)
Re# 1924235-4            Tags   Past Edits
KEQ-JBP ka kaam to shayad baad me hi shuru hoga. News me aya hai ki CORE abhi ET-PPI pe focus kar raha hai.

2 posts are hidden.
  
★★★  General Travel
Apr 25 2016 (07:35)   ET/Itarsi Junction (8 PFs)
 

Guest: 7fe915d9   show all posts
Entry# 1818949            Tags   Past Edits
Good news...
finally SQL/Sontalai BGTA/Bagra tawa, the only single line track of ET-JBP/ALD line will be going to double....
I saw inauguration board of project at ET/itarsi station PF 4/5 below the FOB..
requesting to Itarsi Rail-fans, pls capture n upload pic for it...
for
...
more...
that i also google for same but i found this one..

13 posts are hidden.

  
4302 views
Apr 26 2016 (00:05)
Ashfak Ahmed Moosa   62 blog posts
Re# 1818949-14            Tags   Past Edits
Frnds ye khabar sahi hai puraney bridge k pas hi naya bridge banega aur new railway line tunnel se 7 kms ghoom gar jayegi aur iska tender nikal chuka hai

1 posts are hidden.
  
★  General Travel
0 Followers
8350 views
Apr 05 2016 (12:52)   11266/Ambikapur - Jabalpur Express | JBP/Jabalpur Junction (6 PFs)
 

arydolly001   378 blog posts
Entry# 1790922            Tags   Past Edits
#JBPELECTRIFICATIONNEWS
#JBPALDELECTRIFICATIONNEWS
#JBPNEWS
Some random clicks of jbp ald electrification

Pics
...
more...
Taken Between sihora to Deori (jbp)
work have been started , its great news :)

3 posts - Wed Apr 06, 2016

  
2203 views
Apr 06 2016 (13:20)
OHE over JBP~   1113 blog posts   64 correct pred (72% accurate)
Re# 1790922-4            Tags   Past Edits
JBP-STA-MKP route pe irregular track-pole distance ko fix karne ka kya hoga? Same company ko tender mila h kya?

1 posts are hidden.

  
4479 views
Apr 06 2016 (21:43)
Ashfak Ahmed Moosa   62 blog posts
Re# 1790922-6            Tags   Past Edits
Cobra hi repairing k kam karegi har pole k pas4.5meter par dusra pole lagega support k liye dusri company ko contract deney sey project 2/3 sal k liye latak jayega railway iskeliye tayyar nahi hai satna news paper mai ye news chapi thi

  
3900 views
Apr 23 2016 (20:16)
Ashfak Ahmed Moosa   62 blog posts
Re# 1790922-7            Tags   Past Edits
Frnds aj hi papa rajasthan sey lautey unhone bataya ki poles adhartal station tak lag gaye hai aur ohe wires sihora tak lag gaye hai aur kam acha chal raha hai

  
4024 views
Apr 23 2016 (20:17)
Montez~   2716 blog posts   1582 correct pred (61% accurate)
Re# 1790922-8            Tags   Past Edits
Even on ET side poles can be found just after KEQ

  
3943 views
Apr 24 2016 (03:56)
OHE over JBP~   1113 blog posts   64 correct pred (72% accurate)
Re# 1790922-9            Tags   Past Edits
That's really great! Finally the work between JBP-KTE has caught some pace. Let's hope for the best :)

1 posts are hidden.
  
★  General Travel
0 Followers
4206 views
Mar 02 2016 (11:39)   JBP/Jabalpur Junction (6 PFs)
 

arydolly001   378 blog posts
Entry# 1755044            Tags   Past Edits

3 posts are hidden.

  
★  
Mar 02 2016 (23:19)
Ashfak Ahmed Moosa   62 blog posts
Re# 1755044-4            Tags   Past Edits
Frnds kal mai gwarighat station k site par gaya tha waha signal k poles lag gaye hai aur project k contractor mr surendra singh ji kalra say bat hui unhoney bataya k ap k soch say jyada tezi say kam chal raha hai bas thoda time khandari rob mai lag raha ha usmay b bas pillar par base dalna baki kam unhay har hal mai agley mah april tak sukri tak kam complete karney order mila hai
  
★★  Rail Fanning
0 Followers
6217 views
Feb 19 2016 (14:54)  
 

2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Entry# 1743305            Tags   Past Edits
#ETJBPelectrificationupdate
#jbpnews
In ET-JBP section ET-PPI section is where all OHE poles has been fitted and many places OHE lines also been installed and b/w MML-Narsinghpur OHE poles has been fitted along with OHE wires in many places and work of installing OHE poles at stations also going at full pace so we can hope ET-JBP section fully electrified by this yr DEC or 2017 JAN/FEB

3 posts are hidden.

  
1697 views
Feb 20 2016 (02:08)
Ashfak Ahmed Moosa   62 blog posts
Re# 1743305-4            Tags   Past Edits
Frnds jab tak katni jabalpur k kam nai hoga tab tak jbp ko fayda nahi milega kte jbp k kam hona jarury hai

  
1692 views
Feb 20 2016 (02:13)
Ashfak Ahmed Moosa   62 blog posts
Re# 1743305-5            Tags   Past Edits
Frnds par maine suna ke railway nai cipla cobra ko excuse de diya tha ke wo wo gadbad poles ko nikal kar fir se laga de koi latest news hai is barey mai

3 posts are hidden.

  
1671 views
Feb 21 2016 (00:33)
siddiquisharique   6 blog posts
Re# 1743305-9            Tags   Past Edits
They dont have any other choice but to rectify the construction no other contractors are going to take this work.but let's hope they restart it soon

5 posts are hidden.
  
Rail Budget
0 Followers
5063 views
Feb 19 2016 (15:06)   JBP/Jabalpur Junction (6 PFs)
 

2017Year of hopes for JBP~   3219 blog posts   44 correct pred (50% accurate)
Entry# 1743323            Tags   Past Edits
JABALPUR will Become a big junction and imp. station of WCR in near future after completion of the following projects-
1-ALD-JBP-ET electrification work- OFCL ending date of work is DEC 2017 (but can complete before also as per current speed of work)
2-JBP-NIR-BTC-G new BG line completion -ofcl date of completion is Mar 2018 (work b/w JBP-NIR is going on in full swing) and after completion JBP will become a big JN. for south trains and R/BSP/HWH/Durg bound trains just like ET/NGP is now and will decongest the route of ET-NGP-BPQ also
3-JBP-DAMOH
...
more...
new line completion will give many trains way to skip KTE to go to Delhi/NZM and will save much time also
if i forgot to add any other projects all r welcome to add here...

8 posts are hidden.

  
1941 views
Feb 20 2016 (02:03)
Ashfak Ahmed Moosa   62 blog posts
Re# 1743323-9            Tags   Past Edits
Manikpur to jabalpur ka kya hua koi latest news hai frnds

  
1966 views
Feb 20 2016 (02:31)
12293 ltt ald duronto   108 blog posts
Re# 1743323-10            Tags   Past Edits
Manikpur to Satna work in progress
Satna to Jabalpur totally stoped
Bhedaghat to narsinghpur great progress
Piparia to itarsi good progress

  
1959 views
Feb 20 2016 (02:58)
12293 ltt ald duronto   108 blog posts
Re# 1743323-11            Tags   Past Edits
Manikpur to Satna work in good pace
Satna to Jabalpur no progress no work totally stoped
Bhedaghat to narsinghpur great progress
Piparia to itarsi also work in progress with good pace

9 posts are hidden.
Page#    41 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Apr 6
Trains with ARP 15 Dep on: Tue Apr 11
Trains with ARP 30 Dep on: Wed Apr 26
Trains with ARP 120 Dep on: Tue Jul 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site