Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jun 23, 2017 23:17:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jun 23, 2017 23:17:10 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Nirmal
Page#    9 Blog Entries  next>>
  
General Travel
0 Followers
425 views
Jun 02 2017 (14:14)   13104/Bhagirathi Express

Nirmal   11 blog posts
Entry# 2304235            Tags   Past Edits
I am wondering who updates Arrival/Departure History. Yesterday (Jun 1) I was travelling in Bhagirathi Express 13104. It reached Sealdah at 10:50 am. But it is updated as 10:35 am. Totally imaginary time.

  
394 views
Jun 02 2017 (14:16)
कर्नाटक संपर्क क्रांति^~   4270 blog posts   3558 correct pred (68% accurate)
Re# 2304235-1            Tags   Past Edits
Fake updates by NTES.....this is not new....they generally do this...

  
373 views
Jun 02 2017 (14:17)
IR no more Safe^~   22464 blog posts   98904 correct pred (75% accurate)
Re# 2304235-2            Tags   Past Edits
10-15 mins every stn make less, to show punctual run.
  
Info Update
0 Followers
3849 views
Mar 17 2017 (07:09)   31873/Sealdah-Lalgola EMU Passenger | LGL/Lalgola (2 PFs)

4πu¶am*^~   5924 blog posts   42379 correct pred (87% accurate)
Entry# 2200164            Tags   Past Edits
Conversion of following trains to EMUs w.e.f. 17.03.2017 on trial basis.

2 posts are hidden.

  
1745 views
May 01 2017 (14:55)
Nirmal   11 blog posts
Re# 2200164-3            Tags   Past Edits
People of Lalgola are not getting benefit of double line. Time from Sealdah is same. Conversion of eloco to EMU may be beneficial to rail and good for short distance passenger, but for those who will be travelling from Sealdah to Lalgola sees no benefit. Saved 30 minutes go to stoppage at Krishnanagar.

  
1626 views
May 01 2017 (15:22)
May i have your attention plzz~   807 blog posts   3 correct pred (100% accurate)
Re# 2200164-4            Tags   Past Edits
Speed in a section depend upon the conditions of the railway tracks not on whether electrification is done or not although electric loco can accelerate much faster and give a better speed but only up to a limit

  
1610 views
May 01 2017 (15:32)
Nirmal   11 blog posts
Re# 2200164-5            Tags   Past Edits
I am talking about 30 min stoppage at Krishnagar. Had it been just 5 min, the train could reach Lalgola 25 mins earlier. After double line each train in Krishnagar Lalgola section is saving around 30 mins from zero crossing time; but it is not reflecting since 1. Timetable is not revised 2. Some train is running slow 3. Some train has been made EMU with 30 minute stoppage at Krishnagar.
  
General Travel
0 Followers
214 views
Mar 16 2017 (10:28)  

Nirmal   11 blog posts
Entry# 2199238            Tags   Past Edits
From News
Mar 16 2017 : The Times of India (Kolkata)
Darjeeling Mail likely to change route by year-end
Kolkata:


...
more...

Darjeeling Mail -the most prestigious train that connects Kolkata to north Bengal -is all set to follow a different route soon.
Instead of crossing the Vivekananda Bridge and passing Burdwan and Bolpur, the train will move through Barrackpore, Krishnagore and Murshidabad to Malda.This will not only shorten the distance between Sealdah and New Jalpaiguri and bring down travel time, the move will also decongest the busy stretch between Burdwan and Malda......
  
General Travel
0 Followers
224 views
Mar 15 2017 (12:57)  

Nirmal   11 blog posts
Entry# 2198403            Tags   Past Edits
After double line completion in Krishnanagar Lalgola section, any news on Timetable revision?
  
Info Update
0 Followers
852 views
Nov 14 2016 (18:10)  

Nirmal   11 blog posts
Entry# 2059765            Tags   Past Edits
Jiaganj to Cossimbazar new electrified down line (double line) is now functional in Sealdah Lalgola section. For Cossimbazar to Beldanga section new line is ready and electrification is going on. Should be completed by Jan 2017.

  
780 views
Nov 14 2016 (19:01)
Guest: 479db979   show all posts
Re# 2059765-1            Tags   Past Edits
good news !!!
Page#    9 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 3
Trains with ARP 15 Dep on: Sat Jul 8
Trains with ARP 30 Dep on: Sun Jul 23
Trains with ARP 120 Dep on: Sat Oct 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.