Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon May 29, 2017 21:05:11 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon May 29, 2017 21:05:11 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ★★★BRC WAP 7😎~
Page#    367 Blog Entries  next>>
  
★  General Travel
0 Followers
585 views
May 25 2017 (16:56)   BMN/Bhimana (1 PFs)

Iri rules are different in different cases^~   81871 blog posts   5228 correct pred (78% accurate)
Entry# 2292553            Tags   Past Edits
tweet by Prabhu
Swarupganj-Bhimana dbling, part of Swarupganj-Abu commissioned today. Ist train has passed at 08:49 am.#MissionRailDev #FastImplement
click here

2 posts are hidden.

  
205 views
Today (15:10)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2292553-4            Tags   Past Edits
When would this happen ?

4 posts are hidden.
  
★  Info Update
0 Followers
539 views
Today (02:09)   JBP/Jabalpur Junction (6 PFs)

Waiting for elocos in ET JBP section😌~   59 blog posts
Entry# 2297638            Tags   Past Edits
Updates on electrification work of PPI-JBP section as on 28/05/2017.
1. From PPI to GARD the work of digging hole is completed.(GARD outer)
The work of digging hole is to be start on GARD station.
2. GARD-NU the hole work is completed. The work of OHE is going on KY station.
3.
...
more...
NU-SRID the work ohe pole and wiring is also completed.
Only some part of wiring has to be tightned.
4. SRID-KEQ hole work is completed and work of OHE is done till KEQ outer.
5. KEQ-JBP the work of digging holes is completed till 2nd No.bridge (almost JBP outer). The hole work is almost completed in MML station.(the work of OHE pole will be start soon). The work of digging hole will also be start soon in JBP station.
By this pace I think PPI-JBP section will be completed in the end of the year (December). And we can se elocos in this route by January 2K18.😌☺

1 posts are hidden.

  
413 views
Today (07:13)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2297638-2            Tags   Past Edits
From next year onwards wdp/alco action willbe too limited rest all on wap's

  
266 views
Today (11:39)
arydolly001~   542 blog posts
Re# 2297638-3            Tags   Past Edits
I LOVE " P " MORE THEN WAP :)
  
General Travel
0 Followers
1262 views
May 25 2017 (20:06)   12701/Hussain Sagar SF Express

LHB to Godavari Express~   562 blog posts   24 correct pred (52% accurate)
Entry# 2292820            Tags   Past Edits
This train can be extended to Warangal and should be made a 24 coacher

46 posts are hidden.

  
298 views
May 26 2017 (22:21)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2292820-49            Tags   Past Edits
Gitanjali exp vidarbha exp udyan exp siddheshwar exp sewagram exp konkan kanya express this all train are 24 coach train and there are otiginating from CSTM only few PF are not capable of 24 coach but remaining are capable of 24 coach so if CR wish they can make hussainsagar exp as 24 coach train

  
96 views
Today (11:04)
SLA   1034 blog posts
Re# 2292820-50            Tags   Past Edits
Yeah, I am aware of this and that is the reason I have said few restrictions.
  
★  General Travel
0 Followers
923 views
Yesterday (23:35)  

Proud atheist~   4387 blog posts   37 correct pred (63% accurate)
Entry# 2297592            Tags   Past Edits
A daily occurrence at MFP.. Look how punctuality of trains is at its lowest specially in Northern and Eastern india..Its .neither fog season nor any kind of mishap took place..still some trains are running even 14 hours late...Suresh prabhu undoubtedly is the worst railway minister as far as operation of trains is concerned..

  
249 views
Today (07:32)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2297592-1            Tags   Past Edits
Its a major delay but blame should not be on suresh prabhu as in WR section( BCT-ADI) trains are not at all delaying all trains with passenger are on time so this kind of blame should be on the controllers for poor controlling

1 posts are hidden.

  
221 views
Today (08:10)
UP 32 UP 72~   1399 blog posts
Re# 2297592-3            Tags   Past Edits
suresh prabhu aakar control karen.... tab shayad right time ho jae....bhai ke according...: P

2 posts are hidden.

  
109 views
Today (10:42)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2297592-6            Tags   Past Edits
Ab toh wahi kuch kar sakte ha

33 posts are hidden.
  
★  General Travel
0 Followers
1045 views
May 25 2017 (22:52)   12150/Danapur - Pune SF Express (PT) | PUNE/WDP-4B/40144

Tarunwap7~   219 blog posts
Entry# 2293101            Tags   Past Edits
IRFCA - #Video4 Honking Pune WDP-4D Speeds past at 110 km/hr | Danapur - Pune Superfast !
Link - click here
Section:- Katni - Jabalpur, West Central Railways.
Date:- 13-5-2017.
Locomotive:- Pune WDP-4D 40144.
...
more...

12150 Danapur - Pune Superfast Express Led by Pune WDP4D Storms past through a Scenic location of west central railway at 110kph MPS.
Enjoy & Stay tuned for the upcoming videos of the playlist! :D

5 posts are hidden.

  
225 views
Yesterday (19:32)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2293101-6            Tags   Past Edits
Iss saal toh complete hone wala nhi ha
may get complete in next syear starting months
  
Rail News
0 Followers
1230 views
New Facilities/TechnologyNFR/Northeast Frontier  -  
Nov 11 2016 (10:50)   Four elevated rail tracks to come up in Guwahati

Mazi IRI   34 news posts
Entry# 2055989   News Entry# 285397         Tags   Past Edits
Railways minister SP Prabhu announces Rs 5,000 crore joint venture with Assam government; project to eliminate 12 level crossings between Kamakhya and New Guwahati
BY OUR STAFF REPORTER
GUWAHATI, Nov 10: Announcing a slew of steps for rapid and large scale development of rail connectivity in the Northeastern region, Minister of Railways Suresh Prabhakar Prabhu on Thursday announced a Rs 5,000 crore joint venture with Assam government to construct four elevated railway tracks between Kamakhya and New Guwahati to eliminate 12 level crossing gates in Guwahati city.
Prabhu
...
more...
made the announcement while laying the foundation stone for the project of doubling of railway line from New Bongaigaon to Kamakhya via Goalpara town and the doubling of railway line from Digaru to Hojai at a glittering function held at the RPF Parade Ground at Maligaon. He also laid the foundation stone for the much-awaited railway electrification project for Raninagar Jalpaiguri – Guwahati via Rangiya railway line and flagged off the first passenger train services on the 10 kilometre Karimganj – Maishashan newly converted broad gauge section in Barak Valley.
Prabhu said construction of the elevated tracks connecting Kamakhya and New Guwahati would decongest city roads, free up railway land and enable railways to develop Guwahati station as a commercial hub. He also said the new projects would keep provisions for connectivity with the proposed metro rail system.
Speaking at the function, Assam Governor Banwarilala Purohit congratulated NF Railway team and the Railway Minister for their success in starting many projects in the Northeast on time.
While thanking the Railway Minister for his initiatives in development of rail network in the Northeast, Chief Minister Sarbanada Sonowal emphasized on speedy completion of all railway projects in the State. He also requested the Railway Minister to take up construction of railway lines so that every district headquarters of the State is connected by rail. The Chief Minister also requested Prabhu to initiate steps involving the Railways for skill development of the youth of the region.
The 10-km track between Karimganj and Maishashan was converted into broad gauge as part of the Lumding–Badarpur–Silchar gauge conversion project. Only a 30 km stretch between Baraigram and Durlavchera still remains to be converted into broad gauge, but the Railway Minister said this portion would also be converted into broad gauge by May 2017. Two pair of new trains – 55686/55685 Silchar–Maishashan Passenger & 55662/55661 Karimganj–Maishashan Passenger will start operating from tomorrow, he announced.
The doubling of 176-km long New Bongaigaon–Kamakhya railway line was sanctioned in 2015-16 Railway budget at an approximate cost of Rs 2,232 crore. The section will have 18 stations where construction of new station building and yard remodeling would be taken up.
The doubling of 102-km long Digaru–Hojai railway line was also sanctioned in 2015-16 Railway budget at an approximate cost of Rs 871 crore. The section has 15 stations. The doubling of Hojai to Lumding section had already been sanctioned for which the Railway Minister of State Rajen Gohain and Chief Minister Sarbananda Sonowal had laid foundation stone on September 12 this year.
The project for electrification from Raninagar Jalpaiguri to New Bongaigaon and then from New Bongaigaon to Guwahati was entrusted with Rail Vikash Nigam Limited (RVNL) in 2014 and 2015 respectively. The RVNL will execute the project on turnkey basis at a total cost of Rs 655.55 crore.
The function was also attended by Minister of State for Railways Rajen Gohain, General Manager of NF Railway Chahatey Ram, General Manager of NF Railway (Construction) HK Jaggi, Chief Managing Director of Rail Vikash Nigam Limited (RVNL) SC Agnihotri, other senior railway and RVNL officials and a host of invited guests.

4 posts are hidden.

  
382 views
Yesterday (14:08)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2055989-5            Tags   Past Edits
And what about electrification in njp ghy stretch

  
290 views
Yesterday (17:33)
Mazi IRI   704 blog posts
Re# 2055989-6            Tags   Past Edits
NJP-Raninagar Jalpaiguri section - I have no status
Raninagar Jalpaiguri- Ghy section- Nothing

2 posts are hidden.
  
★★  Info Update
0 Followers
742 views
Yesterday (09:55)   MFP/Muzaffarpur Junction (6 PFs)

ALI™~   1204 blog posts   2279 correct pred (67% accurate)
Entry# 2296453            Tags   Past Edits
एक कदम स्वच्छता की ओर : मुजफ्फरपुर स्टेशन के लाइन नंबर 4 का वाशेबल अप्रैन बनकर तैयार हो गया है । click here

5 posts are hidden.

  
400 views
Yesterday (14:21)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2296453-7            Tags   Past Edits
Washable apron is created on such PF from where train originate or halt for long time or train end station
Its used for cleaning the toilets as on a major station tracks get untidy very quickly for cleaning those tracks apron is created through which all waste goes to near by sewage line. And track gets clean.
I got this info when washable apron work was going on JAIPUR pf3 by railway official

2 posts are hidden.
  
Poll
0 Followers
891 views
19 votes
May 25 2017 (09:48)  

😘😘Sapt kranti Superfast😘😘~   148 blog posts
Entry# 2291696            Tags   Past Edits
Which DLS have Lots of Livery for his Alco's??
UDL0%0
SPJ79%15
GD0%0
LKO5%1
ERS0%0
TKD0%0
KJM0%0
VSKP0%0
IZN5%1
Mention other11%2

7 posts are hidden.

  
445 views
May 27 2017 (20:37)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2291696-8            Tags   Past Edits
Most EMD are with BGKT

  
370 views
Yesterday (01:30)
Ragi Sangati and Mutton Pulusu   249 blog posts
Re# 2291696-9            Tags   Past Edits
No UBL.

1 posts are hidden.
  
Rail Fanning
0 Followers
253 views
May 27 2017 (21:32)   GD/WAG-7/27199

Tushar Shandilya~   743 blog posts   5572 correct pred (67% accurate)
Entry# 2295938            Tags   Past Edits
Recently transferred from kanpur to gonda now become real gunda of gonda...GD WAG 7 27199 hauling some garibrath type train(sorry for bad quality of pic 😅)
Credit&Source-Sajan kumar paswan asst.loco pilot,Facebook

7 posts are hidden.

  
189 views
May 27 2017 (21:55)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2295938-8            Tags   Past Edits
BCT have full icf train ac
i.e. BCT ADI AC DURONTO ICF

  
187 views
May 27 2017 (21:56)
सजन रेडियो बजाईयो जरा*^~   31518 blog posts   69927 correct pred (81% accurate)
Re# 2295938-9            Tags   Past Edits
Ohh I Forgot it .. iske alava to nahi hai naa :P

  
172 views
May 27 2017 (22:04)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2295938-10            Tags   Past Edits
Only single icf ac train is this
  
Predictions: 11
confirm: 0
rac: 0
wl: 11
Journey: Sat May 27, 2017 @ 21:15
Class: Sleeper - SL   |   Tot Seats: Avbl 400   |   Charting: < 17:00
Travel: MAS/Chennai Central   to   CBE/Coimbatore Main Junction   |   495 km / 531 km
12671/Nilagiri (Blue Mountain) Express (PT)
Entry# 2294906

PNR: 475-xxxxxxx   |   Similar PNRs
Posted Status as of: May 27 2017 (09:26)
Boarding Point: MAS/Chennai Central
Resv To: CBE/Coimbatore Main Junction
Resv Quota: GN
Passenger 1: WL# 138 (Booking Status: WL# 237)
Passenger 2: WL# 139 (Booking Status: WL# 238)
Passenger 3: WL# 140 (Booking Status: WL# 239)
Total Fare:  945
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 27 2017 (17:16)
Boarding Point: MAS/Chennai Central
Resv To: CBE/Coimbatore Main Junction
Resv Quota: GN
Passenger 1: Confirmed: S9/31 [SL] (Booking Status: WL# 237)
Passenger 2: Confirmed: S9/32 [SU] (Booking Status: WL# 238)
Passenger 3: Confirmed: S9/67 [UB] (Booking Status: WL# 239)
Total Fare:  945
Chart PREPARED

Full PNR Status History (4 statuses)
Status as of: May 27 2017 (17:16)
Boarding Point: MAS/Chennai Central
Resv To: CBE/Coimbatore Main Junction
Resv Quota: GN
Passenger 1: Confirmed: S9/31 [SL] (Booking Status: WL# 237)
Passenger 2: Confirmed: S9/32 [SU] (Booking Status: WL# 238)
Passenger 3: Confirmed: S9/67 [UB] (Booking Status: WL# 239)
Total Fare:  945
Chart PREPARED

Status as of: May 27 2017 (16:18)
Boarding Point: MAS/Chennai Central
Resv To: CBE/Coimbatore Main Junction
Resv Quota: GN
Passenger 1: WL# 119 (Booking Status: WL# 237)
Passenger 2: WL# 120 (Booking Status: WL# 238)
Passenger 3: WL# 121 (Booking Status: WL# 239)
Total Fare:  945
Chart NOT Prepared

Status as of: May 27 2017 (12:19)
Boarding Point: MAS/Chennai Central
Resv To: CBE/Coimbatore Main Junction
Resv Quota: GN
Passenger 1: WL# 137 (Booking Status: WL# 237)
Passenger 2: WL# 138 (Booking Status: WL# 238)
Passenger 3: WL# 139 (Booking Status: WL# 239)
Total Fare:  945
Chart NOT Prepared

Status as of: May 27 2017 (09:25)
Boarding Point: MAS/Chennai Central
Resv To: CBE/Coimbatore Main Junction
Resv Quota: GN
Passenger 1: WL# 138 (Booking Status: WL# 237)
Passenger 2: WL# 139 (Booking Status: WL# 238)
Passenger 3: WL# 140 (Booking Status: WL# 239)
Total Fare:  945
Chart NOT Prepared


1 posts are hidden.

  
176 views
May 27 2017 (18:49)
★★★BRC WAP 7😎~   676 blog posts   772 correct pred (78% accurate)
Re# 2294906-2            Tags   Past Edits
Kuch toh jhol ha otherwise itna WL direct CNF nhi hota ha rarely RAC aata ha

  
184 views
May 27 2017 (18:53)
Hiriyanna*^   2094 blog posts   169833 correct pred (93% accurate)
Re# 2294906-3            Tags   Past Edits
Is Train ka clearance jhol jhall wala hi hai.... Kabhi bhi kisi ko samajh me nahi aaya hai...
Page#    367 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Jun 8
Trains with ARP 15 Dep on: Tue Jun 13
Trains with ARP 30 Dep on: Wed Jun 28
Trains with ARP 120 Dep on: Tue Sep 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site