Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jun 28, 2017 11:18:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jun 28, 2017 11:18:30 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by ashishsagrawal
Page#    19 Blog Entries  next>>
TRIP HAS ENDED.
Blog  Time-Table

  
4516 views
Dec 10 2016 (22:01)
sandeepSILIGURI8906413723~   235 blog posts   4907 correct pred (66% accurate)
Re# 2080522-1            Tags   Past Edits
rac 6

1 posts are hidden. Click to open.
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Sat Dec 13, 2014 @ 06:50
Class: 2nd Sitting - 2S   |   Tot Seats: Avbl 851
Travel: TNA/Thane   to   AWB/Aurangabad   |   337 km / 606 km
17617/Tapovan Express
Entry# 1305762

Posted by: ashishsagrawal   1 blog posts
PNR: 873-xxxxxxx   |   Similar PNRs
Posted Status as of: Dec 12 2014 (21:05)
Passenger 1: CE 1, 66 (Booking Status: D3,66,CK)
Chart PREPARED

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 16 2014 (16:48)
Passenger 1: CE 1, 66 (Booking Status: D3,66,CK)
Chart PREPARED

  
1526 views
Dec 12 2014 (21:07)
🌟🌟©® Kushinagar Express ©®🌟🌟*^~   4961 blog posts   43131 correct pred (83% accurate)
Re# 1305762-1            Tags   Past Edits

  
1315 views
Dec 16 2014 (10:48)
Swarag Madavi   812 blog posts   4948 correct pred (77% accurate)
Re# 1305762-2            Tags   Past Edits
  
Predictions: 13
confirm: 13
rac: 0
wl: 0
Journey: Sat Dec 06, 2014 @ 12:33
Class: AC 3-tier - 3A
Travel: TNA/Thane   to   PUNE/Pune Junction   |   156 km / 1628 km
11017/Mumbai LTT - Karaikal Weekly Express (PT)
Entry# 1290657

Posted by: ashishsagrawal   1 blog posts
PNR: 845-xxxxxxx   |   Similar PNRs
Posted Status as of: Nov 29 2014 (10:16)
Passenger 1: Confirmed (Booking Status: B1,6,GN)
Passenger 2: Waitlist# 27 (Booking Status: W/L 36,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 06 2014 (13:56)
Passenger 1: Can/Mod (Booking Status: B1,6,GN)
Passenger 2: Can/Mod (Booking Status: W/L 36,GNWL)
Chart PREPARED

  
1495 views
Nov 29 2014 (12:07)
Soumitra Chawathe*^~   30227 blog posts   98197 correct pred (72% accurate)
Re# 1290657-1            Tags   Past Edits
  
Predictions: 13
confirm: 11
rac: 0
wl: 2
Journey: Fri Aug 15, 2014 @ 06:15
Class: Chair Car - CC   |   Tot Seats: Avbl 52
Travel: CSTM/Mumbai Chhatrapati Shivaji Terminus   to   AWB/Aurangabad   |   370 km / 606 km
17617/Tapovan Express
Entry# 1187294
 

Posted by: ashishsagrawal   1 blog posts
PNR: 851-xxxxxxx   |   Similar PNRs
Posted Status as of: Aug 14 2014 (09:13)
Passenger 1: Waitlist# 17 (Booking Status: W/L 105,GNWL)
Passenger 2: Waitlist# 18 (Booking Status: W/L 106,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 17 2014 (02:30)
Passenger 1: CE1,52 (Booking Status: W/L 105,GNWL)
Passenger 2: CE1,53 (Booking Status: W/L 106,GNWL)
Chart PREPARED

  
1764 views
Aug 14 2014 (21:56)
rdb*^   31430 blog posts   378308 correct pred (80% accurate)
Re# 1187294-1            Tags   Past Edits
  
Predictions: 2
confirm: 2
rac: 0
wl: 0
Journey: Sat Jul 05, 2014 @ 06:50
Class: Chair Car - CC   |   Tot Seats: Avbl 52
Travel: TNA/Thane   to   AWB/Aurangabad   |   337 km / 606 km
17617/Tapovan Express
Entry# 1147692
 

Posted by: ashishsagrawal   1 blog posts
PNR: 872-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 26 2014 (20:35)
Passenger 1: Waitlist# 13 (Booking Status: W/L 14,GNWL)
Passenger 2: Waitlist# 14 (Booking Status: W/L 15,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 07 2014 (21:17)
Passenger 1: CE1,51 (Booking Status: W/L 14,GNWL)
Passenger 2: CE1,55 (Booking Status: W/L 15,GNWL)
Chart PREPARED

  
2054 views
Jul 04 2014 (22:12)
rdb*^   31430 blog posts   378308 correct pred (80% accurate)
Re# 1147692-1            Tags   Past Edits
Page#    19 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jul 8
Trains with ARP 15 Dep on: Thu Jul 13
Trains with ARP 30 Dep on: Fri Jul 28
Trains with ARP 120 Dep on: Thu Oct 26

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.