Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri May 26, 2017 18:56:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri May 26, 2017 18:56:30 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by indradhanush
Page#    39 Blog Entries  next>>
  
General Travel
0 Followers
295 views
Apr 22 2017 (16:04)  

indradhanush   65 blog posts   1 correct pred (50% accurate)
Entry# 2246001            Tags   Past Edits
#admin
#atlasmonitors change colour between KKDI and PKT stretch. Because gauge convertion work not complete in that.
  
General Travel
0 Followers
253 views
Apr 19 2017 (08:56)  

indradhanush   65 blog posts   1 correct pred (50% accurate)
Entry# 2241504            Tags   Past Edits
GOC WDG4 waiting for signal @ SA/Salem Junction
  
Site-Related
0 Followers
1011 views
Apr 07 2017 (12:33)  

indradhanush   65 blog posts   1 correct pred (50% accurate)
Entry# 2225877            Tags   Past Edits
Is the electrification work completed or not between Arakkonam(AJJ) and Tirumalpur? Any one plz tell

  
719 views
Apr 07 2017 (21:08)
YAM1YCG1~   57 blog posts
Re# 2225877-1            Tags   Past Edits
The track works around AJJ for diversion line has not started. Though some sleepers have been stacked, no earthwork has been done. At TMLP side, diversion line has been constructed and electric poles are in place. Nothing else has happened.

  
629 views
Apr 07 2017 (21:13)
vaigai express~   178 blog posts
Re# 2225877-2            Tags   Past Edits
Electrification is there till Takkolam. Due to the presence of INS Rajali in right side of the track, it is still a diesel line. The Navy has agreed to give SR a total of 60 crore for the construction of the new line. However they have given only 30 crore. Once the second installment has been made, the new line can constructed

  
576 views
Apr 07 2017 (22:17)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2225877-3            Tags   Past Edits
Wt abt blue line ji?

  
602 views
Apr 08 2017 (07:20)
YAM1YCG1~   57 blog posts
Re# 2225877-4            Tags   Past Edits
Thats unelectrfied. Electrification ends just after Kallaaru river bridge.

1 posts are hidden.
  
General Travel
0 Followers
977 views
Mar 30 2017 (07:55)   AYVN/New Aryankavu (1 PFs)

indradhanush   65 blog posts   1 correct pred (50% accurate)
Entry# 2215664            Tags   Past Edits
#admin
#atlasmonitors plzz update the section between Aryankavu and New Aryankavu in Kollam - Tenkasi stretch. CRS speed trial over between SCT and New Aryankavu last month.

  
801 views
Mar 30 2017 (15:56)
Faiz~   2781 blog posts   198 correct pred (67% accurate)
Re# 2215664-1            Tags   Past Edits
As of now,The train services between Sengottai to New Aryankavu and punalur to edamon has not been started,Even though the Line has been commissioned and open for traffic.Works are going on in New Aryankavu to Edamon stretch and it seems to take some more months to complete...

2 posts are hidden.

  
576 views
Mar 30 2017 (16:40)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2215664-4            Tags   Past Edits
Yes. SCT to AYVN CRS speed trail over last month.

  
676 views
Mar 30 2017 (16:49)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2215664-5            Tags   Past Edits
Bro update also Valadi to GOC section. Double electrified BG work over.
  
General Travel
0 Followers
359 views
Mar 30 2017 (07:50)  

indradhanush   65 blog posts   1 correct pred (50% accurate)
Entry# 2215661            Tags   Past Edits
#admin
#atlasmonitors plzz verify the section between valadi and goc. Today CRS going to conduct speed trail.
  
General Travel
0 Followers
857 views
Mar 29 2017 (08:28)  

Waiting for mass VAIGAI trip   53 blog posts
Entry# 2214562            Tags   Past Edits
Is doubling completed between villupuram and trichy?

5 posts are hidden.

  
386 views
Mar 29 2017 (12:49)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2214562-6            Tags   Past Edits
Plz update Aryankavu to New Aryankavu into single diesel line. Last month CRS inspection over.

  
Mar 29 2017 (12:52)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2214562-7            Tags   Past Edits
Tmr CRS going to conduct speed trail in Valavadi to Golden rock stretch.
  
Rail News
0 Followers
398 views
New Facilities/TechnologySR/Southern  -  
Mar 12 2017 (11:24)   Railways keen on east coast line

rdb*^   129373 news posts
Entry# 2194903   News Entry# 296165         Tags   Past Edits
Suresh Prabhu urges Tamil Nadu government to go for joint ventures
The Railways is keen on reviving the proposal on building a railway line along the east coast from Chennai via Mamallapuram and Puducherry to Kanniyakumari and the State government should join hands with it to execute the project and other pending proposals, said Union Railway Minister Suresh Prabhu here on Saturday.
The Centre was keen on taking up large-scale development of the railway network in Tamil Nadu and the State government should partner the railways to execute infrastructure projects, he said.
Backlog
...
more...
of projects
Mr. Prabhu told presspersons here that there had been a large backlog of railway projects in Tamil Nadu over the past several years because of poor financial allocation to the State under the previous United Progressive Alliance government. The BJP government, the Minister said, had reversed this trend.
Earlier, speaking at a function to mark the commissioning of a 2.13-km bypass line connecting the main and the chord lines at Golden Rock in Tiruchi and other projects here, Mr. Prabhu said the average annual allocation for railway projects in Tamil Nadu was only Rs. 878 crore in 10 years prior to the BJP coming to power at the Centre in 2014. During 2015-16 and 2016-17, the allocation was more than doubled and in 2017-18 it was scaled up to Rs. 2,300 crore.
“Tamil Nadu is an important State with big tourism potential, industries and the population which needs investments to improve the infrastructure,” he said.
Pointing out that proposals on laying new lines on the Karaikal-Mayiladuthurai-Tranquebar, Ramananathapuram-Tuticorin-Kanniyakumari and other sections in the State had been shelved as not feasible, Mr. Prabhu said he was trying to find ways to execute them over the next few years.
“I have requested the State government to form a joint venture with the railways to implement such infrastructure projects. This will benefit Tamil Nadu in a big way,” he said.
There had been demand for providing important connectivity between Chennai and Kanniyakumari and there had been a proposal on laying a new line along the east coast, which would connect important tourism centres such as Mamallapuram and the Union territory of Puducherry. “I want to revive this and request the Tamil Nadu government to join us,” he said. It would bring about rail connectivity to ports, which was vital for economic growth, he further added.
Mr. Prabhu commissioned a 16-km electrified double line stretch between Villupuram Junction and Tiruvennainallur Road and a new waiting hall and a VIP lounge at Vriddhachalam Railway Junction through video conference from here. He announced the extension of the Tiruchi-Tirunelveli Intercity Express up to Thiruvananthapuram.

1 posts are hidden.

  
1510 views
Mar 12 2017 (11:28)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2194903-2            Tags   Past Edits
Update Atlas in Virudhachalam - Mathur section ...CRS inspection is over in that stretch.
  
Rail News
0 Followers
639 views
New/Special TrainsER/Eastern  -  
Nov 24 2016 (07:12)   Special AC special train between Santragachi and Pune from Dec 3

indradhanush   22 news posts
Entry# 2069546   News Entry# 286614         Tags   Past Edits
Nagpur: The Railways has decided to run a special AC train between Santragachi and Pune from December 3 to January 28.Accordingly train number 02822 will depart Santragachi on every Saturday from Dec 3 to Jan 28 at 6-30 pm and arrive in Pune on third day at 2-45 am. It will pass through Nagpur on Dec 4 (every Sunday) till Jan 29 at 11-15 am.
Similarly train number 02821 AC special will leave Pune on Dec 4 (Every Sunday) at 10-30 am and reach Santragachi second day at 6-15 pm. It will pass through Nagpur on Dec 6 to Jan 31 (every Tuesday) at 1-20 am, a release from Nagpur division of Central Railway, said, here today.
The
...
more...
special AC train will stop at Kharagpur, Tatanagar, Chakradharpur, Raurkela, Jharsauguda, Bilaspur, Raipur, Nagpur, Bhusawal and Panvel and consisrs of three 2AC and eight 3AC coaches, the release added.

  
3093 views
Nov 24 2016 (08:37)
srinivasvasanthi~   3844 blog posts   13 correct pred (50% accurate)
Re# 2069546-1            Tags   Past Edits
Congrats to the CR and Pune Railway division to operate AC expresses in between Pune and Santrakachi.
They avoid SUVITHA Airfares trains in this route for the benefit of the passengers.
Requested that Similarly, our SR s Madurai ,Chennai and Thiruvananthapuram Railway divisions shall be operated AC specials in lieu of SUVITHA Airfares train for the benefit of the passengers.
  
Imaginary
0 Followers
599 views
06
Oct 14 2016 (19:49)   IMG85137/♥♥BARDDHAMAN-KOCHUVELI WEEKLY SUPER EXPRESS (VIA HOWRAH-VISAKHAPATNAM-YESVANTPUR-TRIVANDRUM)♥♥
 

MY FRIEND IS BACK~   2347 img trains   1601 popular
16515 green flags   99 red flags   7 green per Train
Entry# 2023520            Tags   Past Edits
Flags/Comments/Suggestions for this Link Please.
Thanks

  
541 views
Oct 14 2016 (21:17)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2023520-3            Tags   Past Edits
What is the reason to connect YPR ...
This may inrease travel time.

  
531 views
Oct 14 2016 (21:36)
MY FRIEND IS BACK~   12766 blog posts   41 correct pred (48% accurate)
Re# 2023520-4            Tags   Past Edits
concept 1 train 3 destinations u can think

1 posts are hidden.
  
Imaginary
0 Followers
899 views
013
Oct 11 2016 (08:28)   IMG18870/♥♥Agartala-Nagercoil SF Express♥♥ | MS/Chennai Egmore (11 PFs) | ED/WAP-4
 

MI won a nail biting Final~   296 img trains   290 popular
3188 green flags   12 red flags   11 green per Train
Entry# 2019210            Tags   Past Edits
Please rate this first connection from Agartala to Southern India via Lumding, Guwahati, New Jalpaiguri, Malda Town, Durgapur, Dhanbad, Ranchi, Sambalpur, Vishakapatnam, Vijayawada, Chennai Egmore, Madurai
Please give your suggestions too...

  
686 views
Oct 11 2016 (11:08)
indradhanush   65 blog posts   1 correct pred (50% accurate)
Re# 2019210-1            Tags   Past Edits
Add Dindigul...

  
681 views
Oct 11 2016 (11:56)
MI won a nail biting Final~   4776 blog posts   347 correct pred (64% accurate)
Re# 2019210-2            Tags   Past Edits
DG added

2 posts are hidden.
Page#    39 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jun 5
Trains with ARP 15 Dep on: Sat Jun 10
Trains with ARP 30 Dep on: Sun Jun 25
Trains with ARP 120 Dep on: Sat Sep 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site