Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 28, 2017 18:09:15 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 28, 2017 18:09:15 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by rooky1979
Page#    35 Blog Entries  next>>
  
★★★  Rail Fanning
0 Followers
1204 views
Feb 24 2017 (18:40)   11302/Udyan Express (PT) | MJBK/Manjari Budruk (2 PFs) | KYN/WCAM-3/21897

Ayush Kamal~   5582 blog posts   58738 correct pred (87% accurate)
Entry# 2177166            Tags   Past Edits
The newest addition to the E-loco hauled trains family in Daund-Pune-Mumbai section.
.
11302 Krantiveera Sangolli Rayanna Bengaluru - Chhatrapati Shivaji Terminus Mumbai UDYAN Express hauled by KYN WCAM-3 21897 blazing through Manjari Budruk at MPS.

4 posts are hidden.

  
386 views
Feb 25 2017 (00:17)
rooky1979   36 blog posts
Re# 2177166-6            Tags   Past Edits
KJM / UBL WDP4/ 4B & WDG4 LOCOS

  
387 views
Feb 25 2017 (11:54)
Ayush Kamal~   5582 blog posts   58738 correct pred (87% accurate)
Re# 2177166-7            Tags   Past Edits
Even I'm aware of that. I was talking about the electric loco.

6 posts are hidden.
  
★★★  Rail Fanning
0 Followers
685 views
Feb 23 2017 (21:15)   22630/Tirunelveli - Mumbai Dadar Express (via Konkan) | ROHA/Roha (3 PFs) | UBL/WDG-4/12078

ALLP RailFan~   916 blog posts
Entry# 2175982            Tags   Past Edits
Super Offlink Hubballi WDG 4 12078 Waiting For Starters with 22630 Tirunelveli- Dadar Superfast Express at ROHA

  
509 views
Feb 23 2017 (23:54)
rooky1979   36 blog posts
Re# 2175982-1            Tags   Past Edits
Seems the train does have a crew change at Roha Station.

  
493 views
Feb 24 2017 (00:04)
So Paddy Got Up~   2738 blog posts   1236 correct pred (71% accurate)
Re# 2175982-2            Tags   Past Edits
Many of the newer trains introduced on KR have crew change at roha.
  
★★  General Travel
0 Followers
5134 views
Nov 22 2016 (14:09)   11028/Chennai Central - Mumbai CST Mail | GTL/Guntakal Junction (6 PFs) | RPM/WAP-7/30333

Vishnu Datta Jacke~   113 blog posts
Entry# 2067809            Tags   Past Edits
11028 Chennai Central ~ CSTM Mail with RPM WAP7 #30333

  
459 views
Nov 24 2016 (13:22)
rooky1979   36 blog posts
Re# 2067809-1            Tags   Past Edits
Is WAP 7 now a permanent link for Chennai Mail or LSA arrangement

7 posts are hidden.
  
Rail Fanning
0 Followers
962 views
Nov 24 2016 (12:47)   SDAH/Sealdah (20 PFs)

ALI🚂~   1102 blog posts   2007 correct pred (67% accurate)
Entry# 2069793            Tags   Past Edits
New Electromotive Diesel Locomotive Being Transferred To Sealdah #Railfanstuff #DieselPower

  
725 views
Nov 24 2016 (13:22)
rooky1979   36 blog posts
Re# 2069793-3            Tags   Past Edits
Why still new diesel locomotives are being produced & modernised as in some years all Indian rail network will be electrified & already there are ample amount of diesel locomotives are lying idle in lot of sheds.

2 posts are hidden.
  
Rail News
0 Followers
920 views
Other News
Nov 04 2016 (12:16)   Railway targets electrification of 24,000 km track in five years

Jayashree ❖ Amita*^   35492 news posts
Entry# 2047760   News Entry# 284783         Tags   Past Edits
Electrification of majority of routes will help railways in reducing the energy bill, says Suresh Prabhu
Setting an ambitious target of electrification of 24,000 km long track in the next five years, Railway Minister Suresh Prabhu on Thursday said it will help in running trains in a faster and cleaner manner.
Besides, electrification of majority of routes will help railways in reducing the energy bill considerably, he said.
"Railways'
...
more...
expenditure on energy is the second highest after salary and pension bill. Expansion of electrified routes across the country will also help in reducing the energy bill as we have committed to reduce the energy cost," he said at global seminar on Mission Electrification and Decarbonisation of Indian Railways here.
Describing the event as an "important milestone", Prabhu said, "When railways started its operation it used horses to pull the train. Now we are using horsepower to move trains at faster pace. So it is back to roots."
Currently about 2000 km track is being electrified in a year and the aim is to reach 4,000 km per year by 2017-18 and 6,000 km in subsequent year.
Talking about mission electrification, Prabhu said, "The target is electrification of about 24,000 km in the next five years and the electrification will also reduce the energy bill. We have tied up with three PSUs to increase the pace of route electrification. With the expansion of electrification of majority of rail network, railways will run trains in a faster and cleaner manner."
In order too fast track the pace of electrification Railways have joined hands with three PSUs - IRCON, RITES and PGCIL.
He also asked the three PSUs to compete with each other to complete the electrification work in faster way.
Railways expect to reduce fuel bill by Rs 10,000 cr annually through electrification of major routes.
Expressing concern over the ever-increasing pollution, he said, "Carbon emission is a major challenge in India and also in the world. We have reached level where carbon cannot be absorbed. We have to reduce the greenhouse gas significantly to prevent ill-effect of pollution on human lives."
He said using clean energy including solar and wind power is key to reduce the emission level.
"Through electrification trains speed will go up. We have framed a time frame. Three PSUs have been roped in to do the electrification. It is very important for the environment point of view."
Prabhu also highlighted railway's partnership with various ministries including power, science and technology, environment to achieve its goal.
A new App for monitoring energy conservation scheme was also launched at the event.

1 posts are hidden.

  
1945 views
Nov 04 2016 (12:50)
rooky1979   36 blog posts
Re# 2047760-2            Tags   Past Edits
Bitter truth

1 posts are hidden.
  
General Travel
0 Followers
4975 views
Oct 25 2016 (12:04)   12484/Amritsar - Kochuveli Weekly SF Express

God of Underworld   891 blog posts   6 correct pred (86% accurate)
Entry# 2035730            Tags   Past Edits
No halt at Ratnagiri only 12483 halt at Ratnagiri, bookings also not allowed on 12484

  
886 views
Oct 25 2016 (12:07)
rooky1979   36 blog posts
Re# 2035730-1            Tags   Past Edits
Ratnagiri will be only crew change halt for both 12483 & 12484

5 posts are hidden.
TRIP HAS ENDED.
Blog  Time-Table

34 posts are hidden. Click to open.

  
2627 views
Oct 24 2016 (12:22)
rooky1979   36 blog posts
Re# 2031009-35            Tags   Past Edits
Is Roha Official Halt or only for crew change purpose

1 posts are hidden. Click to open.
  
★  Rail Fanning
0 Followers
1258 views
Oct 19 2016 (11:34)  
 

🅰rpïť p🅰reek 🚉^~   1704 blog posts   934 correct pred (79% accurate)
Entry# 2028912            Tags   Past Edits
The king is taking rest .........
The mighty wag-9 at kalyan trip shed

9 posts are hidden.

  
531 views
Oct 19 2016 (16:26)
rooky1979   36 blog posts
Re# 2028912-10            Tags   Past Edits
This is the place where Old DC Locomotives use to rule i.e.WCG / WCM series locos

2 posts are hidden.
  
Rail News
0 Followers
754 views
Commentary/Human InterestSR/Southern  -  
Oct 17 2016 (06:54)   Track electrification up to Mangaluru by Dec.
 

rdb*^   126143 news posts
Entry# 2027014   News Entry# 283229         Tags   Past Edits
Work up to theNetravathibridge hasalready been executed
The track-electrification work up to Mangaluru is progressing as per schedule and is likely to be completed by December end.
The electrified track up to Cheruvathur was commissioned a few months ago and now the Southern Railway is working overtime to complete electrification of the 85-km track up to Mangaluru, which is part of the 307-km Shoranur-Mangaluru stretch.
Leftover
...
more...
work
Railway sources told The Hindu that electrification up to the Netravathi bridge, near Mangaluru, had already been executed. The focus now was on the leftover work at the Mangaluru Central station yard and the nearby Mangaluru Junction, which was expected to be completed within schedule, they said. The Kerala State Electricity Board has commenced laying underground 110 kV electric lines so as to feed the traction sub-station at Cheruvathur and near Elathur in Kozhikode by December itself, while the works on the sub-station at Uppala could take two more months, they said.
Upon completion, the authorities would approach the
Office of the Chief Railway Safety Commissioner in Bengaluru for the formal commissioning of the line which would mark the completion of the mainline track electrification works in Kerala.
Once commissioned, Railways would use electric locomotives for 75 per cent of the freight and passenger traffic, thereby opening avenues to run additional services, including Mainline Electric Multiple Unit (MEMU), that would offer cheaper and swift travel for short-distance passengers. Besides, Railways are also planning to set up an electric loco shed in Mangaluru to carry out urgent mechanical works.
Commissioning of the electrified stretch will mark a major milestone in the Railways drive to reduce fuel expenses, ensure punctual rail services, and introducing new train services in the sector.
KSEB lays underground lines to feed traction sub-stations at Cheruvathur, Elathur
Electrified track up to Cheruvathur commissioned
Work up to Netravathi bridge has already been executed

2 posts are hidden.

  
571 views
Oct 19 2016 (14:47)
rooky1979   36 blog posts
Re# 2027014-3            Tags   Past Edits
Very true
  
Poll
0 Followers
1169 views
7 votes
Oct 12 2016 (12:52)  
 

🅰rpïť p🅰reek 🚉^~   1704 blog posts   934 correct pred (79% accurate)
Entry# 2020662            Tags   Past Edits
Which loco shed holds maximum no.of WAG-6 LOCO
KANPUR14%1
BONDAMUNDA14%1
KAZIPET14%1
BHILAI43%3
GOMOH14%1
LUDHIANA0%0

12 posts are hidden.

  
339 views
Oct 12 2016 (13:58)
rooky1979   36 blog posts
Re# 2020662-13            Tags   Past Edits
Vishakapatnam

5 posts are hidden.
Page#    35 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 10
Trains with ARP 15 Dep on: Wed Mar 15
Trains with ARP 30 Dep on: Thu Mar 30
Trains with ARP 120 Dep on: Wed Jun 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site