Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Mar 2, 2017 01:52:17 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Mar 2, 2017 01:52:17 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Mukesh
Page#    14 Blog Entries  next>>
  
★  Rail Fanning
0 Followers
691 views
Feb 20 2017 (18:11)   HSR/Hisar Junction (6 PFs) | PTRU/WDG-3A/13531

हिसार जंक्शन   1077 blog posts   11 correct pred (58% accurate)
Entry# 2172022            Tags   Past Edits
#ScienceExpress lead by 13531/PTRU/WDG 3A standing on Plateform No. 6 at #HisarJunction
1- PTRU/WDG 3A/13531
2- Science Express
3-TB of Science Express
4- Solar Pannel fitted coaches of #ScienceExpress
...
more...

5- Train standing on PF 6 of Hisar

  
478 views
Feb 20 2017 (18:35)
Mukesh   20 blog posts
Re# 2172022-1            Tags   Past Edits
I think common problem with NWR Stations is
Lack of facilities even proper flooring...
However, most of them seem cleaner than their eastern counterparts.
Churu Jn.

  
434 views
Feb 20 2017 (19:01)
रोहित सिंह मुंदालिया   370 blog posts   429 correct pred (66% accurate)
Re# 2172022-2            Tags   Past Edits
Hisar station have proper platform but shed not covering whole platform

  
398 views
Feb 20 2017 (19:10)
Mukesh   20 blog posts
Re# 2172022-3            Tags   Past Edits
I know, what about flooring?
Same problem is for almost all of NWR stations...
SDLP has only 3 PF despite being junction of four lines.

  
388 views
Feb 20 2017 (19:35)
रोहित सिंह मुंदालिया   370 blog posts   429 correct pred (66% accurate)
Re# 2172022-4            Tags   Past Edits
Proper flooring bhi hin

1 posts are hidden.
  
Social
0 Followers
318 views
Feb 20 2017 (19:15)   ABO/Asthal Bohar Junction (4 PFs)

Mukesh   20 blog posts
Entry# 2172081            Tags   Past Edits
Asthal Bohar Junction
  
General Travel
0 Followers
947 views
Jan 27 2017 (18:01)   RE/Rewari Junction (8 PFs)

College exams~   197 blog posts   4381 correct pred (79% accurate)
Entry# 2142516            Tags   Past Edits
*** Some Useful info related to REWARI Station and RAIL MUSEUM at one place ***
REWARI Station
Code – RE , Division Jaipur, Zone NWR, Elevation 246m above sea level
• 6 Diversion Routes from Rewari station :-
1. Rewari
...
more...
– Delhi
2. Rewari – Alwar – Jaipur
3. Rewari – Ringas – Ajmer
4. Rewari – Loharu – Sadulpur
5. Rewari – Bhiwani – Hisar
6. Reawri – Jhajjar – Rohtak
• Distance from Various main nearby Railway Stations: -
Delhi (DLI)- 82.48Km
New Delhi (NDLS)- 83.7Km
Gurugram (GGN)- 51.3Km
Alwar (AWR) 74.8Km
Jaipur (JP) 225.6Km
Ajmer (AII)- 295.7Km
Hisar (HSR) – 143Km
Rohtak (ROK) – 81Km
• Platforms at Rewari Station :-
PF 1 - 540m * 10m (Attached to station Building)
PF 2-3 - 540m * 10.88m
PF 4-5 - 580m * 12m ( Also have a Ramp)
PF 6-7 - 619m * 11m
PF 8 - 540m * 11m
Saloon siding 110m (At west end of PF-1 ) (Also Rail Mail office at this end)*
Total lines -14 -- using 52 kg FR PRC ( Press Rest concrete) sleeper
• Long Route Trains stoppage at Rewari :- (Destinations more than 1500Kms from Rewari)
1. JSM-HWH (12371/72)  RE -> HWH (1552Km)
2. UDZ-NJP (19601/02)  RE -> NJP (1577Km)
3. BGKT-KYQ (15623/24)  RE -> KYQ (1997Km)
• Important Trains from Rewari :-
Rajdhnai – 0 (1 passing without stop 12957/8)
Duranto – 0
Shatabdi – 1 (12015/16)
Jan Shatabdi – 1 (12065/66)
Garib rath – 3* (12215/16 , 12983/84 , 04971/72*)
Humsafar – 0
Sampark Kranti – 0 ( 1 passing without stop 12463/64)
Double Decker – 0 (1 passing without stop 12985/86)
• Passenger amenities :-
Parking -> Available
ATM -> Available
city bus service -> Available
Auto-taxi -> Available
Watercoolers
retiring rooms, waiting rooms, restaurants, computerized ticket reservation, bookshop
Staircases, Shed
• Another Railway station in same city AMRI (use freight trains for Wheat and other products)
******* Rail Museum ********
• Only steam Loco Heritage Shed of India
• Having Fairy Queen (oldest working steam engine of world)
• Other locomotives are Rewari King, Sahib, Sultan, Sindh, Angadh, Akbar, Azad, Sher-e-Punjab and Virat.
• Rail Museum daily opens.
• Museum Timing : - 8:00 to 17:00 IST
• Ticket Charge – Free

  
320 views
Feb 20 2017 (18:58)
Mukesh   20 blog posts
Re# 2142516-1            Tags   Past Edits
Double
  
General Travel
0 Followers
688 views
Feb 20 2017 (13:16)   NDLS/New Delhi (16 PFs)

©The Dark Lord™~   5089 blog posts
Entry# 2171711            Tags   Past Edits
Passenger Earnings from Major Delhi based Stations--->
-------------------------------------------------- -------------------------------------------------- -------------------------------
*NDLS- 2170 Crore
*NZM- 834 Cr.
*Delhi Jn- 441 Cr.
*ANVT-
...
more...
364 Cr.
*DEE-131 Cr.
*Delhi Cantt- 30.33 Cr.
*Delhi Shahdara- 20.32 Cr.
.
.
Total Earnings from all Major Delhi based Stations From Passenger movement- 3990.65 Crore (Based on 2014-15 Earnings)

1 posts are hidden.

  
245 views
Feb 20 2017 (14:22)
Mukesh   20 blog posts
Re# 2171711-2            Tags   Past Edits
DLI only ₹441 Crore, I thought it is bigger than NZM.
I think DLI have much better connectivity than all these stations maybe except NDLS.

2 posts are hidden.

  
207 views
Feb 20 2017 (16:37)
Divert ShalimarGorakhpur Express via BKSC*^   4291 blog posts   4501 correct pred (76% accurate)
Re# 2171711-5            Tags   Past Edits
Even, I think DLI has better connectivity and more trains.

6 posts are hidden.
  
Rail News
0 Followers
782 views
Commentary/Human Interest
Feb 19 2017 (19:39)   Indian Railways: New Delhi railway station set to get world class makeover through South Korean Railways

rdb*^   126189 news posts
Entry# 2171156   News Entry# 294294         Tags   Past Edits
South Korea has come forward to redevelop the New Delhi railway station, one of the busiest terminals in the country, as a world-class facility. Catering to more than five lakh passengers in a day, the station will be converted into a swanky complex at an estimated cost of Rs 10,000 crore, offering best facilities and shopping experience to travellers, according to an ambitious plan unveiled by the railways. Besides the multi-storey station building with separate sections for departures and arrivals, there is a provision for three skyscrapers for commercial use at the Ajmeri Gate side of the station which handles 361 trains a day.
South Korean Railways has shown keenness for the redevelopment of New Delhi station, said a senior Railway Ministry
...
more...
official. The railways has explored the possibility of redeveloping the station leveraging commercial development of vacant land and air space in and around the station and has submitted a detailed plan with a possible layout to South Korean Railways. The architectural plan was elaborately drawn up with approach and exit routes, keeping the heavy traffic movement near the station at Connaught Place, the official said.
While passengers waiting for trains will have adequate space on the first floor of the station, those disembarking will go out of the station through platforms on the ground level. The second floor will house offices, as per the plan.If everything goes accordingly, there will be a joint inspection of New Delhi station with South Korean team soon.
These redeveloped station would have digital signage, escalators and elevators, automatic self-ticketing counters, executive lounges and many other facilities for passengers.
The redevelopment of New Delhi station is part of Railway Minister Suresh Prabhu’s emphasis on attracting substantial revenue through redevelopment of 400 stations with private participation.
The railways has recently launched the first phase of the ambitious station redevelopment project for 23 junctions.

17 posts are hidden.

  
679 views
Feb 20 2017 (03:06)
Mukesh   20 blog posts
Re# 2171156-19            Tags   Past Edits
lagta hai aapka selection nhi hua jee me....
Today less than 1% go outside India.
& station redevelopment ke liye education ki nhi capital ki jaruat hoti hai.
& 4th health & most of education come under state govts.

  
498 views
Feb 20 2017 (09:09)
©The Dark Lord™~   5089 blog posts
Re# 2171156-21            Tags   Past Edits
Sahi pakde hai, all this frustration is just a result of not getting selected for JEE although I never appeared in that exam...Now happy so for next time plz. refrain yourself from making personal comments...thanks.

  
426 views
Feb 20 2017 (09:58)
Mukesh   20 blog posts
Re# 2171156-23            Tags   Past Edits
Sorry, if I hurt your sentiments.
Number of IITians coming out of IIT every year is more than 20000(10000 JEE, JAM, GATE...) but less than 100 went abroad last year.
Lekin aapne to bhi IITians ke khilaf kuchh to kaha tha....
There are many in so-called upper class only they want to go outside India & no one can stop them while they get
...
more...
everything in India.
  
General Travel
0 Followers
1103 views
Feb 19 2017 (14:06)   MGR/Munger (2 PFs)

Apna Munger😎~   189 blog posts   20 correct pred (53% accurate)
Entry# 2170536            Tags   Past Edits
Bimar y-leg 😂😂😂

  
1024 views
Feb 19 2017 (14:32)
Mukesh   20 blog posts
Re# 2170536-1            Tags   Past Edits
Dudharu gaay, Ashiqpur, Daulatpur

1 posts are hidden.

  
Feb 20 2017 (02:58)
Mukesh   20 blog posts
Re# 2170536-3            Tags   Past Edits
TBH all WB, JH, Bihar & UP have enough share of railways.
Remaining states can claim they are cheated.
  
General Travel
0 Followers
404 views
Feb 19 2017 (11:51)  

©The Dark Lord™~   5089 blog posts
Entry# 2170350            Tags   Past Edits
DLW will develop more powerful High Speed locomotives with a max. speed capability of 200 km/hr. So, if DLW is developing an obvious question arises in mind that whether that would a Diesel loco or an Electric one?

3 posts are hidden.

  
200 views
Feb 19 2017 (14:22)
Mukesh   20 blog posts
Re# 2170350-4            Tags   Past Edits
How can WAP7 can be converted into 9000HP locomotive?
If IR can do it why not build new... Converting existing one doesn't make sense.
  
General Travel
0 Followers
134 views
Feb 19 2017 (13:48)   NDLS/New Delhi (16 PFs)

Mukesh   20 blog posts
Entry# 2170507            Tags   Past Edits
South Korea likely to develop New Delhi railway station as world class
Besides the multi-storey station building with separate sections for departures and arrivals, there is a provision for three skyscrapers for commercial use at the Ajmeri Gate side of the station.
By: PTI | New Delhi | Published:February 19, 2017 1:25 pm
South Korea has come forward to redevelop the New Delhi railway
...
more...
station, one of the busiest terminals in the country, as a world-class facility. Catering to more than five lakh passengers in a day, the station will be converted into a swanky complex at an estimated cost of Rs 10,000 crore, offering best facilities and shopping experience to travellers, according to an ambitious plan unveiled by the railways. Besides the multi-storey station building with separate sections for departures and arrivals, there is a provision for three skyscrapers for commercial use at the Ajmeri Gate side of the station which handles 361 trains a day. South Korean Railways has shown keenness for the redevelopment of New Delhi station, said a senior Railway Ministry official.

The railways has explored the possibility of redeveloping the station leveraging commercial development of vacant land and air space in and around the station and has submitted a detailed plan with a possible layout to South Korean Railways.
The architectural plan was elaborately drawn up with approach and exit routes, keeping the heavy traffic movement near the station at Connaught Place, the official said.
While passengers waiting for trains will have adequate space on the first floor of the station, those disembarking will go out of the station through platforms on the ground level. The second floor will house offices, as per the plan.
If everything goes accordingly, there will be a joint inspection of New Delhi station with South Korean team soon.
These redeveloped station would have digital signage, escalators and elevators, automatic self-ticketing counters, executive lounges and many other facilities for passengers.
The redevelopment of New Delhi station is part of Railway Minister Suresh Prabhu’s emphasis on attracting substantial revenue through redevelopment of 400 stations with private participation.
The railways has recently launched the first phase of the ambitious station redevelopment project for 23 junctions.
click here
  
अब मार्च में शुरू होगी पिपरिया-इटारसी लाइन, क्राॅसिंग पर केबल डालने ठेकेदार की फूली सांसें
बिजली ट्रैक पर इंजन ट्रॉयल को रेड सिग्नल
भाससे | जबलपुर।
विद्युतीकरण परियोजना के पहले चरण का काम पूरी तरह से फेल हो गया। पिपरिया-इटारसी रेल खण्ड को पहले जनवरी माह में चालू कर दिया जाना था। इसके बाद ठेका कंपनी को फरवरी का नया टारगेट
...
more...
दिया गया था, पर उसमें भी उसकी सांसें फूल गईं। रेल ट्रैक क्रॉसिंग पर अंडरग्राउंड केबल डालने के लिये कंपनी ने अपने हाथ खड़े कर लिए हैं। कंपनी की न के बाद बिजली ट्रैक पर इस माह होने वाली इंजन ट्रॉयल को भी रेड सिग्नल मिल गया। रेल इलेक्ट्रिकल आरई विभाग ने मार्च में बिजली से ट्रेनों को दौड़ाने की तैयारियां शुरू कर दी हैं।
आरई जोन इलाहाबाद ने नए सिरे से विद्युतीकरण के काम में तेजी लाने के लिए छिवकी-जबलपुर-इटारसी के बीच काम को चार खंडों में बांट दिया है, जिससे इस परियोजना के काम में तेजी लाई जा सके। रेलवे बोर्ड ने इस काम के लिए 15 माह की अवधि निर्धारित की है। आरई विभाग के इस प्रोजेक्ट को पूरा करने के लिये मार्च 2018 तक कार्य पूरा करने का टारगेट दिया है।
कहां से कब पूरा होगा कार्य
मानिकपुर-मझगवां 37 किमी मार्च 2017
मझगवां-सतना रीवा 84 किमी दिसंबर 2017
सतना-कटनी 98 किमी मार्च 2018
कटनी-जबलपुर 91 किमी जून 2017
जबलपुर-पिपरिया 178 किमी जुलाई 2017
पिपरिया-इटारसी 67 किमी मार्च 2017
चार खण्डों में बंटा प्रोजेक्ट
छिवकी (नैनी) से इटारसी के बीच सतना-रीवा, सतना-कटनी, कटनी-जबलपुर व जबलपुर इटारसी रेलखंड के विद्युतीकरण कार्य को वर्ष 2012-13 में मंजूरी दी गई थी, 653 रूट किमी तथा 1611 ट्रैक किमी जिसकी लागत लगभग 861 करोड़ 33 लाख रुपए है, के विद्युतीकरण कार्य की जिम्मेदारी चीफ प्रोजेक्ट डायरेक्टर को दी गई।

6 posts are hidden.

  
540 views
Feb 18 2017 (01:40)
Mukesh   20 blog posts
Re# 2167575-7            Tags   Past Edits
What is 2.2kV...
Which loco uses this voltage???

  
443 views
Feb 18 2017 (06:17)
Aditya*^~   4258 blog posts   2413 correct pred (70% accurate)
Re# 2167575-8            Tags   Past Edits
it is for stopping theft
  
★  Rail News
Other News
Feb 06 2017 (08:39)   Railways to show green signal to a train in Andaman and Nicobar | The Indian Express

Mukesh   1 news posts
Entry# 2153120   News Entry# 293248         Tags   Past Edits
240-km track from Port Blair to Diglipur will benefit tourists, defence forces.
A 240-KM broad-gauge railway line connecting two major islands, with bridges and stations along the coast, will be part of an ambitious rail link connecting Port Blair with Diglipur on the Andaman and Nicobar Islands — a first in the country that will bring the archipelago on the rail map.
The Railway Ministry is set to approve the project, which will connect the Union Territory’s capital city in the south with the largest town on the north Andaman island currently linked
...
more...
by a 350-km bus service that takes over 14 hours and a ship that takes around 24 hours. There is no air connectivity.
According to an internal survey report of the ministry, the cost of the line will be Rs 2,413.68 crore with a negative rate of return on investment of -9.64 per cent. The Railways considers a line to be commercially viable if this figure is at least a positive of 12 per cent. But the ministry is set to approve this project owing to its “uniqueness and strategic importance”, according to documents reviewed by The Indian Express.
The ministry’s Planning and Finance directorates cleared the project last week saying it is desirable because “it is unique, away from the mainland, and has tourism potential.”
andamaan
Giving a fillip to the rail link, the Union Territory administration has agreed to share 50 per cent of the project’s operational cost — or loss.
“As soon as the line is commissioned, tourism will see a jump from the current 4.5 lakh visitors a year to around 6 lakh a year, as per our estimates. So even though the railway survey shows a negative return, our assessment is otherwise. However, we have agreed to share the operational losses, if any,” Jagdish Mukhi, Lieutenant Governor of Andaman and Nicobar Islands, told The Indian Express.
According to the UT administration, the line has tourism potential and is of “immense strategic value” to the defence forces because Diglipur is just 300 km by sea from the southern coast of Myanmar — a broad-gauge train line from Port Blair to Diglipur will take three hours at the most.
The Railways’ Planning wing has suggested that the project may be taken up as part of the strategic lines it will build for Defence ministry, such as those in the border regions of the Northeast. The Finance arm has said that it may be taken up as a national project, like the Kashmir link, in which the general exchequer is billed. The Railway Board will take a final view on this issue soon.
The initial survey for the proposed line was completed in December 2014 but the plan was dropped. Last year, the project received a fresh push when the Railways updated the survey and the UT administration said it would chip in.
Among the major tourist attractions in Diglipur are the Ross and Smith islands. “These are just two of the main attractions. Lakhs of tourists take great pains to reach there from Port Blair every year. With the railway line in place, that part essentially become a part of the capital, beneficial to tourists, local residents and the defence forces,” said Mukhi.

7 posts - Mon Feb 06, 2017

1 posts - Tue Feb 07, 2017

2 posts are hidden.

  
570 views
Feb 07 2017 (14:20)
AK84   2195 blog posts   2758 correct pred (76% accurate)
Re# 2153120-10            Tags   Past Edits
Dear...I am talking about IT not about Railways in different countries

2 posts are hidden.

  
425 views
Feb 09 2017 (16:09)
Savaari Gaadi   824 blog posts   2 correct pred (100% accurate)
Re# 2153120-13            Tags   Past Edits
Finally this poll came true :)
/blog/post/1937663

  
277 views
Feb 09 2017 (18:24)
Mukesh   20 blog posts
Re# 2153120-14            Tags   Past Edits
DLW exports some locos to different countries, Goldrock workshop converted YDM to broad gauge, so it can do otherwise.
Official twitter handle has twitted so definitely something is going on.

  
245 views
Feb 09 2017 (18:31)
©The Dark Lord™~   5089 blog posts
Re# 2153120-15            Tags   Past Edits
Railways has adopted uniguage theory so it will construct Indian guage network here too+ this is a project of strategic importance which holds great importance in countering the growing influence of China in this region so prospective from deference point of view will also be looked.

  
249 views
Feb 09 2017 (18:34)
Hrishik Mukherjee~   98 blog posts   4 correct pred (86% accurate)
Re# 2153120-16            Tags   Past Edits
Please send a screenshot as I dont have a Twitter account
Page#    14 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 12
Trains with ARP 15 Dep on: Fri Mar 17
Trains with ARP 30 Dep on: Sat Apr 1
Trains with ARP 120 Dep on: Fri Jun 30

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site