Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 25, 2017 01:09:54 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 25, 2017 01:09:54 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Engineer
Page#    25 Blog Entries  next>>
  
Rail News
0 Followers
547 views
New Facilities/TechnologyKR/Konkan  -  
Jul 30 2016 (09:58)   Phase-II of Sawantwadi Terminus work sanctioned by Suresh Prabhu
 

For Better Managed Indian Railways~   945 news posts
Entry# 1946526   News Entry# 275375         Tags   Past Edits
Various infrastructure works including terminus building, ticket window, waiting hall, and train watering arrangement will be put in plac in this phase of construction, says chief PRO of Konkan Railway, Siddheshwar Telugu.
Railway Minister Suresh Prabhu has sanctioned Phase-II development works of the Sawantwadi Terminus in Sindhudurg district of coastal Maharashtra, a Konkan Railway official said on Friday.
“Suresh Prabhu has sanctioned the work of Phase-II which will cost Rs 8.15 crore. Under this, various infrastructure works including terminus building, ticket window, waiting hall, circulating area on Sawantwadi town side, new approach road
...
more...
with drive-in facility along the new platform and train watering arrangement will be put in place,” Siddheshwar Telugu, chief PRO of Konkan Railway said.
The Phase-I of Sawantwadi Terminus, the work of which was launched in June last, was recently completed at a cost of Rs 11.42 crore.The foundation stone laying ceremony of Phase-I of the Terminus was performed on June 27, 2015 by Prabhu in the presence of Maharashtra Chief Minister Devendra Fadnavis.
“It was a challenge to complete Phase-I work within a year. Taking into account the importance of the Sawantwadi Terminus and in order to augment the traffic facility, the Railway Minister sanctioned Phase-II,” he said.

  
1229 views
Jul 30 2016 (23:01)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1946526-1            Tags   Past Edits
please change station name to sawantwadi terminus
  
Info Update
0 Followers
1035 views
Jul 22 2016 (14:46)  
 

Engineer   71 blog posts   1 correct pred (50% accurate)
Entry# 1937764            Tags   Past Edits
#admin in sawantwadi there are 3pfs..plz update it

  
804 views
Jul 23 2016 (15:13)
AP™^~   1386 blog posts   329 correct pred (93% accurate)
Re# 1937764-1            Tags   Past Edits
Last time I checked, construction for the new PF was going on. Has that been completed?
We can't update PF No if it's under construction. If the PF is currently being used, then it can be updated right now.

  
738 views
Jul 27 2016 (21:45)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1937764-2            Tags   Past Edits
yes its under use... sawantwadi - dadar rajyarani express departs from new platform

  
621 views
Jul 28 2016 (21:40)
AP™^~   1386 blog posts   329 correct pred (93% accurate)
Re# 1937764-3            Tags   Past Edits
It has been updated now. /timeline/entry/865173
Thank you.
  
Imaginary
0 Followers
1678 views
015
Mar 19 2016 (14:24)   IMG21091/♥♥Brahmani Superfast Express (Vasco-da-Gama - Santragachi)♥♥
 

superenthucutlet   82 img trains   48 popular
529 green flags   6 red flags   7 green per Train
Entry# 1772540            Tags   Past Edits
Please flag this train, which will be the first to connect coastal Maharashtra and Goa with Tatanagar, Rourkela, Bilaspur, Raipur, Nagpur and Amravati. It will also provide the much needed connection between Goa and Kolkata; it runs on the days 18048 Amravati express does not run on. It will definitely be a super hit if introduced.

5 posts are hidden.

  
893 views
Mar 19 2016 (20:12)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1772540-6            Tags   Past Edits
add sawantwadi

1 posts are hidden.

  
956 views
Mar 19 2016 (20:14)
superenthucutlet   520 blog posts   29 correct pred (80% accurate)
Re# 1772540-8            Tags   Past Edits
But this train already halts at KKW (Kankavali). Most trains in KR halt at alternate stations, so I don't think Sawantwadi is required.

  
953 views
Mar 19 2016 (20:26)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1772540-9            Tags   Past Edits
ohk then

4 posts are hidden.

  
648 views
Apr 22 2016 (22:19)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1772540-14            Tags   Past Edits
have a red flag
  
Imaginary
0 Followers
4407 views
312
Mar 21 2016 (15:31)   IMG72267/♥♥RMM - LTT RAMANA EXPRESS♥♥ | RMM/Rameswaram (5 PFs)
 

I Love Pondicherry~   53 img trains   51 popular
702 green flags   42 red flags   12 green per Train
Entry# 1774812            Tags   Past Edits
Rameshwaram And Mumbai Ltt Weekly Ramana Express Direct train Views/Suggestions/Comments And FLAGS Please Rate This Train Provides True Flag For Reasons More Good Give Green Give More Flagged To This Trains Super Fast Express

10 posts are hidden.

  
682 views
Mar 31 2016 (10:05)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1774812-11            Tags   Past Edits
add swv also

  
668 views
Mar 31 2016 (10:08)
I Love Pondicherry~   932 blog posts   46 correct pred (77% accurate)
Re# 1774812-12            Tags   Past Edits
Not different route types. .

17 posts are hidden.
  
General Travel
0 Followers
3379 views
Dec 18 2015 (21:31)   SWV/Sawantwadi Road (3 PFs)
 

Engineer   71 blog posts   1 correct pred (50% accurate)
Entry# 1683145            Tags   Past Edits
what should be the name of sawantwadi terminus aft
its completion? ex. CSTM, CSMT, LTT
  
Rail News
0 Followers
1697 views
New Facilities/TechnologyKR/Konkan  -  
Dec 16 2015 (14:16)   टर्मिनसचे काम जलद करा
 

ameyambre   1764 news posts
Entry# 1681064   News Entry# 251090         Tags   Past Edits
सावंतवाडी : सावंतवाडीतील रेल्वे टर्मिनसच्या कामाची गती मंदावली आहे. कोकण रेल्वेचे नूतन संचालक संजय गुप्ता यांनी मळगाव व झाराप या दोन रेल्वे स्थानकांना सोमवारी भेट देऊन पाहणी करून गती वाढवण्याची सूचना केली. झाराप येथे प्लॅटफॉर्मची उंची वाढवण्यात येणार असल्याचेही त्यांनी यावेळी स्पष्ट केले.संजय गुप्ता यांनी सोमवारी एक दिवसाचा सिंधुदुर्ग दौरा केला. यावेळी त्यांनी टर्मिनसला भेट देऊन येथील कामाची माहिती घेतली. त्यांच्यासोबत कोकण रेल्वेचे व्यवस्थापक बी. बी. निकम उपस्थित होते. संजय गुप्ता यांनी एक महिन्यापूर्वी कार्यभार स्वीकारला. त्यानंतर सोमवारी प्रथमच कोकण रेल्वे मार्गाचे सर्वेक्षण करून अधिकाऱ्यांसोबत चर्चा केली. सावंतवाडी रेल्वे टर्मिनसच्या मंदावलेल्या कामाबाबत गुप्ता यांनी अधिकाऱ्यांना सूचना करत टर्मिनसच्या कामानंतर होणाऱ्या इमारती तसेच रेल्वे रूळ वाढवण्याबाबत त्यांनी अधिकाऱ्यांकडून माहिती घेतली. झाराप रेल्वे स्थानकाला भेट दिल्यानंतर त्यांनी रेल्वे प्लॅटफॉर्मची उंची वाढवण्याबाबत अधिकाऱ्यांना सांगितले असून, भाविष्यात कोणतीही दुर्घटना घडू नये, याची दक्षता घ्या, असे अधिकाऱ्यांना सांगितले. तसेच रेल्वे प्रवाशांना पुरवण्यात येणाऱ्या पाण्यासह इतर सोयींबाबतही त्यांनी माहिती घेतली.
दरम्यान,
...
more...
सावंतवाडी टर्मिनसचा प्रलंबित असलेला आणि मंदगतीने सुरु असलेल्या प्रकल्पाला चालना मिळणार आहे. (प्रतिनिधी)

  
3978 views
Dec 17 2015 (00:20)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1681064-1            Tags   Past Edits
great... waiting for its completion

3 posts are hidden.

  
3632 views
Dec 17 2015 (19:11)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1681064-5            Tags   Past Edits
click here details
  
03
Station Tip
General
0 Followers
1734 views
Dec 17 2015 (09:59)   SWV/Sawantwadi Road (3 PFs)

Engineer   71 blog posts   1 correct pred (50% accurate)
Entry# 1681206            Tags   Past Edits
There is CANCER CARE CENTER near kolgaon_nirukhe road 2.5KMS from City. its sindhudurga's first and a lone cancer care center. it designed for patients suffering from 3rd and 4rth stage.
  
★★  General Travel
2 Followers
16247 views
Nov 24 2015 (02:01)   11004/Sawantwadi Road - Dadar Rajya Rani Express | SWV/Sawantwadi Road (3 PFs)
 

Engineer   71 blog posts   1 correct pred (50% accurate)
Entry# 1659499            Tags   Past Edits
\**PROPOSED SAWANTWADI TERMINUS**/
Hello all, i got an unclear image of sawantwadi station up-gradation project. I could able to conclude some results from that. Few are as follows:
1. old goods track(@EAST) has been removed and a 12m wide PF is constructed.
2. PF1(old) will be widen to 10m as of now 6m.
3.
...
more...
a new FOB(3m high,2-3m wide will connect new12m PF and 10m PF(old pf1).
4. old PF2 will be dismantled as doubling track(main line2) is overlapping it.
5. loop line is being constructed besides new 12m PF.
6. station is going to have a stabling line between main line1(current) and new loop line.
7. so in future station will have 2PFs with total 5 lines(2main+2loopPF+1stabling).
8. old station building(@WEST) will be dismantled and new building will be formed @EAST side.
9. Entry and Exit road(around 16m wide+4m for parking+12m unused land upto boundary) will be from EAST.
10. a overbridge for vehicles @old railway crossing(madgoan end) will be formed.
11. provision for escalator is made along with FOB.
As per my opinion, they are going to use the current station front space(WEST side) for other utilization(in future).
Up to my utter surprise, there are no pit lines and terminal line PF in the plan, though the project is commissioned as SAWANTWADI TERMINUS.
**Being a wadikar, an engineer and a big fan of Konkan railway, i would like to know the detailed project plan of SAWANTWADI TERMINUS upgradation. So thinking to take help of RIGHT TO INFORMATION ACT. I request your opinion regarding the concern.
Thank you.

1 posts - Nov 2015

1 posts - Wed Dec 02, 2015

35 posts - Thu Dec 03, 2015

11 posts - Sat Dec 12, 2015

  
12564 views
Dec 12 2015 (17:08)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1659499-50            Tags   Past Edits
Ill start my lapi aft 9pm..will discuss then..be online

  
12545 views
Dec 12 2015 (17:09)
rameezshaikh9~   162 blog posts
Re# 1659499-51            Tags   Past Edits
I tried to search from ur pic at Sawantwadi Terminus. But, it's difficult. Do one thing. U send me d req. click here

  
12529 views
Dec 12 2015 (17:12)
rameezshaikh9~   162 blog posts
Re# 1659499-52            Tags   Past Edits
Not possible today then. bcoz i m going to attend one party today in the evening. so, it will be late.

  
12524 views
Dec 12 2015 (17:16)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1659499-53            Tags   Past Edits
2row?

  
12481 views
Dec 12 2015 (17:30)
rameezshaikh9~   162 blog posts
Re# 1659499-54            Tags   Past Edits
Yes. I'll be at home. I've given u my whatsapp number on fb messages.
  
★  General Travel
0 Followers
9748 views
Dec 03 2015 (09:46)  
 

WAP7 30201   4771 blog posts   61 correct pred (68% accurate)
Entry# 1668985            Tags   Past Edits
Just curious how many stations are there in IR which are not skipped by any trains......has to be a normal station only....terminal stations won't be considered as it is obvious that all trains must stop at terminals!!!
Thanks in advance.....

120 posts are hidden.

  
1224 views
Dec 10 2015 (14:07)
Engineer   71 blog posts   1 correct pred (50% accurate)
Re# 1668985-122            Tags   Past Edits
Mao

3 posts are hidden.
  
General Travel
0 Followers
9404 views
Dec 08 2015 (20:05)   11003/Dadar - Sawantwadi Road Rajya Rani Express | SWV/Sawantwadi Road (3 PFs)
 

Engineer   71 blog posts   1 correct pred (50% accurate)
Entry# 1674567            Tags   Past Edits
***सावंतवाडी टर्मिनसचे काम धिम्या गतीने***
रेल्वे मंत्र्यांनी घोषणा करूनही वेळेत हे काम झाले
नसल्याने प्रवासी वर्गात चर्चा आहे.
वार्ताहर, सावंतवाडी | November 27, 2015
------------------------------------
सावंतवाडी
...
more...
रोड रेल्वे (मळगाव) स्टेशनवर रेल्वे
टर्मिनसचे काम सुरू आहे. हे काम धिम्या गतीने सुरू
असल्याचे सांगण्यात आले. रेल्वे मंत्र्यांनी घोषणा
करूनही वेळेत हे काम झाले नसल्याने प्रवासी
वर्गात चर्चा आहे. कोकण रेल्वेचा सावंतवाडी
रोड रेल्वे स्टेशन, नवीन फलाट, रेल्वे सायडिंग
उभारणीकरिता २१ कोटी २० लाख रुपयांचा
निधी रेल्वे मंत्रालयाने मंजूर केला. तसेच या
स्टेशनवर शंभर रुमचे पर्यटनाच्या धर्तीवर हॉटेलही
उभारण्याचा संकल्प रेल्वेमंत्रालयाचा आहे.
मुख्यमंत्री देवेंद्र फडणवीस, रेल्वेमंत्री सुरेश प्रभू,
पालकमंत्री दीपक केसरकर, खासदार विनायक
राऊत आदींच्या उपस्थितीत सावंतवाडी रोड
स्थानकावर भुमिपूजन करण्यात आले. टर्मिनसचा
शुभारंभही लवकरच करण्याची घोषणा झाली.
ऑक्टोबर महिना संपला. सध्या सुरू असणाऱ्या
कामामुळे टर्मिनसकरिता उशीर होण्याची
शक्यता आहे.
पालकमंत्री दीपक केसरकर यांनी महाराष्ट्र
सरकारच्या वर्षपूर्तीनिमित्ताने बोलताना
टर्मिनचे काम वेळीच पूर्ण होईल, असे म्हटले आहे.
कोकण रेल्वेमुळे सिंधुदुर्गच्या पर्यटनात निश्चितच
वाढ झाली आहे.
सावंतवाडी येथे नव्याने होणाऱ्या रेल्वे
टर्मिनसमुळेही भविष्यात सिंधुदुर्गमध्ये रेल्वे
फेऱ्यांची संख्या वाढण्यास मदत होणार आहे, असे
पालकमंत्री केसरकर यांनी म्हटले आहे.
सावंतवाडी रेल्वे टर्मिनसअंतर्गत विविध कामे
करण्यात येणार असून
डिसेंबर २०१५ पर्यंत सावंतवाडी रेल्वे टर्मिनसची
१३ कोटींची कामे पूर्ण होणार असून,
टप्प्याटप्प्याने ३० कोटींची कामे पूर्ण
अस्तित्वात येणार आहेत. सावंतवाडी रेल्वे
टर्मिनसमुळे जिल्ह्य़ाच्या पर्यटनात व आर्थिक
सुबत्ता वाढण्यास मदत होणार आहे. तसेच
स्थानिकांना मोठय़ा प्रमाणात
रोजगाराची संधीदेखील उपलब्ध होईल असे
पालकमंत्री दीपक केसरकर यांनी म्हटले आहे.
सावंतवाडी रेल्वे टर्मिनसचा पालकमंत्री दीपक
केसरकर यांनी इश्यु केला होता, पण रेल्वेमंत्री
सुरेश प्रभू यांनी प्रत्यक्षात कृती करून चालना
दिली आहे. रेल्वे गाडय़ांसाठी नवीन फलाट
उभारण्यात येत आहेत, तसेच उड्डाणपुलाचीदेखील
कामे हाती घेण्यात आली आहेत. येत्या
डिसेंबरच्या अखेपर्यंत टर्मिनसचे काम अपेक्षित
आहे. पण प्रत्यक्षात हेही काम वेगाने सुरू नसल्याने
पुढील काही दिवस टर्मिनसचे स्वप्न पुढे जाईल,
असे प्रवासीवर्गात बोलले जात आहे.
Copied from dainik loksatta[click here|click here href=] title="click here href="click here title="click here rel="nofollow" target="_blank" >click here</a> rel="nofollow" target="_blank" >click here</a>
Page#    25 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Feb 4
Trains with ARP 15 Dep on: Thu Feb 9
Trains with ARP 30 Dep on: Fri Feb 24
Trains with ARP 120 Dep on: Thu May 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2136570
    Yesterday (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
  • Entry# 2126247
    Jan 13 (11:57PM)


    Here are some guidelines for members regarding the new Report button and the revamped FM system: 1. If you have ANY complaint about a blog or ANY other issues, please USE the Report button and file a Complaint. Most complaints are resolved by FMs within seconds/minutes. (Some require further discussion). FMs have...
  • Entry# 2125399
    Jan 13 (08:58AM)


    Often we have some TL Entries seemingly in WaitList forever. Usually, the reason for this is that TLMs have already looked at the TL Entry but are not confident enough to Confirm it or are looking for more inputs from the Member regarding the source, etc. And this delay eventually causes...
  • Entry# 2122843
    Jan 10 (10:15PM)


    This is to address persistent and lingering questions about FM Appointments: . 1. Being an FM is a service. It is NOT supposed to be some kind of "reward" or "medal" to "deserving" members. The ULTIMATE OBJECTIVE of the process is to promptly handle/look into Reports filed by members, which is expected to...
Scroll to Top
Scroll to Bottom


Go to Mobile site