Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Mar 25, 2017 15:23:17 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Mar 25, 2017 15:23:17 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by achyuthkumar
Page#    12 Blog Entries  next>>
  
Predictions: 13
confirm: 12
rac: 1
wl: 0
Journey: Fri Oct 28, 2011 @ 18:20
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 116   |   Charting: < 15:15
Travel: SBC/KSR Bengaluru City Junction (Bangalore)   to   KCG/Hyderabad Kacheguda   |   626 km / 626 km
12786/KSR Bengaluru City - Kacheguda SF Express (PT)
Entry# 258368
 

Posted by: achyuthkumar   11 blog posts   831 correct pred (60% accurate)
PNR: 443-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Oct 16 2011 (04:28)
From: Bangalore City Junction/SBC
To: Hyderabad Kacheguda/KCG
Date of Journey: Fri Oct 28, 2011 @ 18:20
Class: AC 3-tier - 3A
Passenger 1: Waitlist# 13 (Booking Status: W/L 22,GNWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Oct 28 2011 (15:20)
Passenger 1: Can/Mod (Booking Status: W/L 22,GNWL)
Chart PREPARED
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Mon Oct 10, 2011 @ 01:35
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 1
Travel: KCG/Hyderabad Kacheguda   to   YPR/Yesvantpur Junction   |   624 km / 1625 km
12252/Wainganga SF Express (PT)
Entry# 253484
 

Posted by: achyuthkumar   11 blog posts   831 correct pred (60% accurate)
PNR: 640-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Oct 09 2011 (13:43)
From: Hyderabad Kacheguda/KCG
To: Bangalore Yesvantpur Junction/YPR
Date of Journey: Mon Oct 10, 2011 @ 01:35
Class: AC 2-tier - 2A
Passenger 1: Confirmed (Booking Status: W/L 4,RLGN)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Oct 12 2011 (20:45)
Passenger 1: A1,28 (Booking Status: W/L 4,RLGN)
Chart PREPARED
  
0 Followers
2251 views
Oct 01 2011 (11:03)   12649/Karnataka Sampark Kranti Express (Via Kacheguda) (PT)
 

achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Entry# 247274            Tags   Past Edits
Superb train upto Kacheguda reached Kcg one hr before sheduled time

  
1084 views
Oct 01 2011 (15:19)
Idris492   11 blog posts
Re# 247274-1            Tags   Past Edits
Its more superb after hyderabad(kacheguda)

  
1026 views
Oct 01 2011 (15:21)
Guest: 871531a2   show all posts
Re# 247274-2            Tags   Past Edits
So u mean to say from Banglore to hyderbad in 9 hr 40 min !!

  
1019 views
Oct 01 2011 (15:23)
★Prayas★*^~   15726 blog posts   54753 correct pred (63% accurate)
Re# 247274-3            Tags   Past Edits
1 H Before Not Possible.

11 posts are hidden.

  
1077 views
Oct 06 2011 (10:08)
Idris492   11 blog posts
Re# 247274-17            Tags   Past Edits
Is this train karnataka samparkkranti 2649 has technical halt at ballharshah

3 posts are hidden.
  
Predictions: 14
confirm: 5
rac: 0
wl: 9
Journey: Fri Sep 30, 2011 @ 22:00
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 30   |   Charting: < 18:00
Travel: YPR/Yesvantpur Junction   to   KCG/Hyderabad Kacheguda   |   612 km / 2279 km
12649/Karnataka Sampark Kranti Express (Via Kacheguda) (PT)
Entry# 246769
 

Posted by: achyuthkumar   11 blog posts   831 correct pred (60% accurate)
PNR: 454-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Sep 30 2011 (16:01)
From: Bangalore Yesvantpur Junction/YPR
To: Hyderabad Kacheguda/KCG
Date of Journey: Fri Sep 30, 2011 @ 22:10
Class: AC 2-tier - 2A
Passenger 1: Waitlist# 16 (Booking Status: W/L 78,GNWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Sep 30 2011 (20:43)
Passenger 1: A1,41 (Booking Status: W/L 78,GNWL)
Chart PREPARED

  
677 views
Sep 30 2011 (16:12)
achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Re# 246769-1            Tags   Past Edits
Is der ny chance to confirm

  
708 views
Sep 30 2011 (16:12)
Guest: 6063b424   show all posts
Re# 246769-2            Tags   Past Edits
:( .. We have to see.

  
609 views
Sep 30 2011 (16:26)
achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Re# 246769-3            Tags   Past Edits
Moving some what faster

  
549 views
Sep 30 2011 (22:13)
Manish Jain*^   2414 blog posts   26414 correct pred (62% accurate)
Re# 246769-4            Tags   Past Edits
confirm
  
0 Followers
434 views
Sep 30 2011 (16:13)  
 

achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Entry# 246785            Tags   Past Edits
What are upgradation rules and regulations

  
426 views
Sep 30 2011 (16:14)
Guest: 6063b424   show all posts
Re# 246785-1            Tags   Past Edits
  
0 Followers
1138 views
Sep 27 2011 (15:09)  
 

achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Entry# 244335            Tags   Past Edits
Yesterday when I am traveling from Kacheguda to yeswanthapur some one pulled chain in some bogie how driver knows chain is pulled how automatically trains stops

  
485 views
Sep 27 2011 (15:35)
12658 Chennai Mail*^~   8897 blog posts   22313 correct pred (65% accurate)
Re# 244335-1            Tags   Past Edits
The moment u pull d chain, the air / vacuum goes off, thus makes d engine stop... u can c all d bogies are inter connected and are connected with hosepipe, inturn connects to d loco

5 posts are hidden.

  
498 views
Sep 27 2011 (15:50)
amit singh ™ ♥♪ ♫♥*^~   5077 blog posts   3453 correct pred (75% accurate)
Re# 244335-8            Tags   Past Edits
More detailed explanation:
The alarm chain in a passenger coach is designed to create a break in the continuity of the brake pipes (whether vacuum or air brakes), immediately resulting in a loss of brake pressure (or vacuum) and thereby cause the train brakes to be applied. With vacuum brakes, a clappet valve is provided that is released by the pulling of the alarm chain, and with air brakes, there is a similar passenger emergency valve that can vent the brake pipe to the atmosphere. See the page on IR brake systems.
At
...
more...
the locomotive, in addition to a warning lamp or buzzer being sounded, in most locos the master controller undergoes auto-regression, with the notches falling to zero rapidly as the locomotive's motive power is switched off. The guard may also notice the loss of brake pressure (although he may not know it is due to the pulling of the alarm chain) and is expected to apply his brakes as well immediately. It is possible for a driver to override the alarm chain pull in a few circumstances, and this is in fact done in a few cases where it is known that miscreants resort to pulling the emergency chain solely to get the train to stop at a point convenient for themselves (but note that such an act by the driver or guard of deliberately ignoring an indication of alarm chain pulling is a serious offence).
In recent years, locos have been fitted with emergency flashers on the roof of the cab, and these flashers are also activated when the brake pipe pressure is lost for any reason other than the driver's application of the brake valve (A9). This alerts drivers of oncoming trains of the possibility of a derailed or parted rake which may foul other tracks, since the brake pressure may have been lost for those reasons as well, and at the locomotive it is not possible to tell whether the loss of brake pressure is due to the pulling of the alarm chain.
ACP also causes a small lever to be released near the emergency brake valve (usually mounted near one end of the coach) which does not retract to its normal position even when the chain is released. This allows the driver or guard to find out in which coach the ACP actually occurred. When the coach is isolated, the lever needs to be manually reset. Until this is done, the lamp and buzzer in the locomotive cab are continuously activated. A circuit breaker controls the lamp and alarm bell in the locomotive cab; in cases where defective equipment causes the lamp and bell to go off, the driver can disable them by placing the MCB in the 'off' position; despite the obvious safety hazards, sometimes this is resorted to by drivers when driving trains through sections where spurious ACP incidents ae very common.
(Source IRFCA)

6 posts are hidden.
  
0 Followers
787 views
Sep 25 2011 (19:58)  
 

Guest: 84af528d   show all posts
Entry# 243430            Tags   Past Edits
how much amount i ll get if i cancelled confirmed tatkal ticket befor 24 hrs any one please i have only 1 hr time please

3 posts - Sun Sep 25, 2011

  
463 views
Sep 25 2011 (20:04)
Guest: 683b79db   show all posts
Re# 243430-4            Tags   Past Edits
Max you'll get 900/-
(In that reductions of SF Charge, reservation charge would not be refunded).
Hence Base fare is what you have to give us !!

  
454 views
Sep 25 2011 (20:06)
§ąī ĴīńĘńđŗą*^~   1676 blog posts   3946 correct pred (77% accurate)
Re# 243430-5            Tags   Past Edits
tkt is from where to where , which class, how may passengers ?

1 posts are hidden.

  
573 views
Sep 25 2011 (20:07)
achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Re# 243430-7            Tags   Past Edits
ticket from kcg too ypr fare is 1242 jourmey tommorow 21hrs

  
576 views
Sep 25 2011 (20:08)
Guest: 683b79db   show all posts
Re# 243430-8            Tags   Past Edits
Do one thing, if its an e ticket, log in to your account.
Then proceed with the cancellation process. Before you click the last button,it will display the amount to be refunded. That's the amount you'll get back !!!

  
548 views
Sep 25 2011 (20:18)
§ąī ĴīńĘńđŗą*^~   1676 blog posts   3946 correct pred (77% accurate)
Re# 243430-9            Tags   Past Edits
u will get a refund of 244/- only

7 posts are hidden.
  
0 Followers
1958 views
Sep 24 2011 (23:05)   17603-Slip2/Kacheguda - Vasco Da Gama Express | KCG/Hyderabad Kacheguda (5 PFs)
 

achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Entry# 243037            Tags   Past Edits
Is tommorow 17603 train running or cancelled please provide urgent information about this please

  
1895 views
Sep 24 2011 (23:10)
Guest: 3fbe7773   show all posts
Re# 243037-2            Tags   Past Edits
Its starts from KRNT.

  
1917 views
Sep 24 2011 (23:12)
ThE BoSs*^~   14216 blog posts   63832 correct pred (69% accurate)
Re# 243037-3            Tags   Past Edits
CANCELLED BETWEEN STATIONS.
17603 ---- KCG/Hyderabad Kacheguda----KRNT/Kurnool Town on 25/09/2011
  
Predictions: 33
confirm: 15
rac: 1
wl: 17
Journey: Sat Sep 24, 2011 @ 20:45
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 26
Travel: NZM/Hazrat Nizamuddin   to   SC/Secunderabad Junction   |   1660 km / 2367 km
22692/Delhi Hazrat Nizamuddin - KSR Bengaluru City Rajdhani Express
Entry# 241479
 

PNR: 265-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Sep 22 2011 (09:51)
From: Delhi Hazrat Nizamuddin/NZM
To: Secunderabad Junction/SC
Date of Journey: Sat Sep 24, 2011 @ 20:50
Class: AC 3-tier - 3A
Passenger 1: Waitlist# 21 (Booking Status: W/L 38,RSWL)
Passenger 2: Waitlist# 22 (Booking Status: W/L 39,RSWL)
Passenger 3: Waitlist# 23 (Booking Status: W/L 40,RSWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Sep 25 2011 (19:58)
Passenger 1: B3,41/Coach Position:4 (Booking Status: W/L 38,RSWL)
Passenger 2: B3,44/Coach Position:4 (Booking Status: W/L 39,RSWL)
Passenger 3: B3,42/Coach Position:4 (Booking Status: W/L 40,RSWL)
Chart PREPARED

  
620 views
Sep 23 2011 (14:00)
achyuthkumar   11 blog posts   831 correct pred (60% accurate)
Re# 241479-1            Tags   Past Edits
train route diverted it seems
  
Predictions: 24
confirm: 24
rac: 0
wl: 0
Journey: Sun Sep 25, 2011 @ 21:05
Class: AC 3-tier - 3A
Travel: KCG/Hyderabad Kacheguda   to   YPR/Yesvantpur Junction
17603-Slip2/Kacheguda - Vasco Da Gama Express
Entry# 240624
 

Posted by: achyuthkumar   11 blog posts   831 correct pred (60% accurate)
PNR: 125-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Sep 20 2011 (12:52)
From: Hyderabad Kacheguda/KCG
To: Bangalore Yesvantpur Junction/YPR
Date of Journey: Sun Sep 25, 2011 @ 21:00
Class: AC 3-tier - 3A
Passenger 1: RAC 7 (Booking Status: RAC 7,GNWL)
Chart NOT Prepared
Please analyze my PNR, and predict my chances of confirmation. Thanks.

Latest Status as of: Sep 26 2011 (21:02)
Passenger 1: B1,33 (Booking Status: RAC 7,GNWL)
Chart PREPARED
Page#    12 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Apr 4
Trains with ARP 15 Dep on: Sun Apr 9
Trains with ARP 30 Dep on: Mon Apr 24
Trains with ARP 120 Dep on: Sun Jul 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site