Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 03:37:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 03:37:27 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Narendra yadav
Page#    143 Blog Entries  next>>
  
Info Update
0 Followers
331 views
Mar 23 2017 (10:36)  

Narendra yadav   152 blog posts
Entry# 2207443            Tags   Past Edits
Hello
#admin #moderator #atlasmonitor
is Ahmedpur - Katwa and Baraigram - Dullabcherra gauge conversion is over.
bcoz atlas shows both line as Single Diesel-Line
please check.

  
264 views
Mar 23 2017 (11:44)
Pran Pratim Ghosh   20296 blog posts   94904 correct pred (75% accurate)
Re# 2207443-1            Tags   Past Edits
AMP PNDI sec GC completed & commissioned already.
/blog/post/2205568
  
General Travel
0 Followers
958 views
Mar 18 2017 (18:19)  

bti jhl without cross~   338 blog posts   3 correct pred (80% accurate)
Entry# 2202107            Tags   Past Edits
#electrification #crs on rok jind route

11 posts are hidden.

  
587 views
Mar 20 2017 (12:29)
Narendra yadav   152 blog posts
Re# 2202107-12            Tags   Past Edits
#admin #moderator #atlasmonitor
please look into this matter
is Rohtak-jind line is single electrified line where doubling is in progress.
Please check
  
Site-Related
0 Followers
793 views
Mar 09 2017 (12:36)  

Narendra yadav   152 blog posts
Entry# 2191150            Tags   Past Edits
Hello,
#admin #moderator #atlasmonitor
katni singrauli railway line currently is single diesel line.
atlas shows it is double diesel line and electrification is in progress.
where as it is single diesel line
...
more...
with doubling and electrification is in progress.
please check this matter and correct it on atlas.
source : click here

  
Mar 09 2017 (22:36)
Few SF trains in NCR have silver spoon of PRIORITY*^~   5174 blog posts   8949 correct pred (74% accurate)
Re# 2191150-1            Tags   Past Edits
Yes doubling and electrification is under progress , nothing wrong in it
  
Rail News
0 Followers
860 views
Commentary/Human InterestNER/North Eastern  -  
Mar 08 2017 (07:47)   Railway official inspects newly laid track

rdb*^   127239 news posts
Entry# 2190923   News Entry# 295690         Tags   Past Edits
CHHAPRA: Decks are likely to be cleared for plying of passenger trains between Mashrakh and Thawe by the end of March or the first week of April this year.
Hope for introduction of passenger train services on the route brightened following an inspection by P K Acharya, commissioner of railway safety, NE Railway, on Monday. A high speed train ran on the newly laid track as trial. Currently, passenger trains run between Chhapra and Mashrakh only.
Sanjai Yadav, CPRO, NE Railway, Gorakhpur, said the Railway Board would soon be approached to give green
...
more...
signal to the project. “Necessary rectifications, as suggested by Acharya, would be done soon,” the CPRO added.,
He said Acharya arrived at Mashrakh station from Chhapra by a special inspection van and left for Thawe in a motor trolley to inspect the newly laid track. During his return journey, the CRS inspected the route on a high speed train. There are 24 stations and about 13 halt stations in the section.
Locals hoped that express trains, especially the New Delhi-bound trains from Pataliputra station, would also pass through the section. At Mashrakh, some rail passengers narrated their problems to the railway officials accompanying the CRS and demanded that basic facilities, such as toilet and drinking water, be improved at the station.

1 posts are hidden.

  
752 views
Mar 09 2017 (11:27)
Narendra yadav   152 blog posts
Re# 2190923-2            Tags   Past Edits
in atlas still showing under gauge conversion.
CRS is done so please update it
#admin #moderator #atlasmonitor

1 posts are hidden.

  
421 views
Mar 09 2017 (11:45)
Pran Pratim Ghosh   20296 blog posts   94904 correct pred (75% accurate)
Re# 2190923-4            Tags   Past Edits
Need to know, if CRS Is successful.
  
General Travel
0 Followers
3915 views
Feb 28 2017 (16:25)   INDB/Indore Junction BG (6 PFs)

vipinpandit   592 blog posts   1 correct pred (100% accurate)
Entry# 2181213            Tags   Past Edits
#indorenews
Speed trial between Tihi-Rau (single line) and Rau-Indore (second line). After almost a year, the second line between Rau and Indore is ready and CRS Inspection Train ran @110 for the speed trial. With this there will be two lines avaialble from Indore to Rau Jn. and then 2 single lines towards Mhow and Tihi (Pithampur) respectively. In Tihi, ConCor has constructed a new container depot which will have goods and container trains from Tihi to Ratlam.
Enjoy the video..

  
3358 views
Mar 02 2017 (10:43)
Narendra yadav   152 blog posts
Re# 2181213-1            Tags   Past Edits
Great.
please update it on map.
#admin #moderator

  
2167 views
Mar 09 2017 (11:07)
Narendra yadav   152 blog posts
Re# 2181213-2            Tags   Past Edits
dear #admin #moderator #atlasmonitor
please update it on map.
as now it is double diesel line with electrification is in progress.
so please update it to dobule from indore to rau.
TIA
...
more...

2 posts are hidden.
  
Rail News
0 Followers
673 views
New Facilities/TechnologyWR/Western  -  
Feb 28 2017 (07:16)   Train zips at 110 kmph on new track

rdb*^   127239 news posts
Entry# 2181292   News Entry# 294925         Tags   Past Edits
Indore: A train at a speed of 110km/hour on the tracks threw away dust making it look like a thick cloud of dust suspended in the air here.
It was a scene near Juni Indore on Monday evening when the railways conducted speed trial of a newly laid broad gauge rail line between Indore and Tihi to check performance of the track.
This new 23-km line between Indore and Tihi under Indore-Dahod rail line project is expected to be commissioned by the western railways in 15 days. The commissioner of railways safety (CRS)
...
more...
Sushil Chandra conducted trial on this newly converted track at a speed of 110km/hour.
Chandra is expected to give trial report by this week and he would also mention speed limits of the track. After this the railway would issue an authorization and then the train would become operational.
Authorities on Sunday also carried out a technical inspection of this track.
"The track is almost ready for operations of passenger trains, but a final decision in this regard will be taken up by the railway board," said Chandra. He further said the track has been developed in best manner, there were few shortcomings which will be rectified soon and then the track would be made open for train operations.
The CRS began his trial from Tihi railway station around 5.10 pm and concluded at Indore at 5.31pm. The train also had halts at Rau and Rajendra Nagar railway stations.

  
930 views
Feb 28 2017 (17:05)
Narendra yadav   152 blog posts
Re# 2181292-1            Tags   Past Edits
So now there is 2 lines between indore and rau.
please update it on map
#admin #moderator #atlasmonitor
  
General Travel
0 Followers
343 views
Feb 24 2017 (08:38)  

Narendra yadav   152 blog posts
Entry# 2176388            Tags   Past Edits
Indore bhopal intercity express between maxi and berchha
  
Rail News
0 Followers
1538 views
IR Affairs
Feb 22 2017 (09:52)   Work to introduce semi-high speed trains on two routes to begin soon

©The Dark Lord™~   33 news posts
Entry# 2173925   News Entry# 294511         Tags   Past Edits
Indian Railways will soon start sub-projects aimed at introducing semi-high speed trains on the Delhi-Howrah and Delhi-Mumbai routes, a senior ministry official said on Tuesday. “The two sub-projects under ‘Mission Raftaar’ are expected to be completed in three years with a total outlay of Rs 18,163 crore,” the official said. After the upgrade, trains on the routes will run at a speed of 160 km per hour.
The ‘Mission Raftaar’ project of the Indian Railways envisages to raise the average speed of both passenger and freight trains. The mission is being spearheaded by a cross disciplinary mobility directorate in the Railway Board. The official, who spoke on the condition of anonymity, said a Detailed Project Report of the routes is being prepared.
...
more...

..
The Delhi-Howrah section will be upgraded at a cost of Rs 6,974 crore, and the Delhi-Mumbai section at an estimated Rs 11,189 crore. The official said the work involved replacing locomotives-hauled trains with Main line Electric Multiple Units and Diesel Electric Multiple Units trains.

1 posts are hidden.

  
1444 views
Feb 22 2017 (10:24)
Narendra yadav   152 blog posts
Re# 2173925-2            Tags   Past Edits
i think NDLS-HWH whole section is already 130 kmph.
but NDLS-BCT is 130 kmph upto kota then kota to Vadodara its either 110 or 100 kmph because of curve.

  
1416 views
Feb 22 2017 (10:41)
Akshay Gupta~   407 blog posts   4 correct pred (44% accurate)
Re# 2173925-3            Tags   Past Edits
NDLS - RTM is 130, RTM - GODHRA 120, GODHRA - BRC 120, BRC- VR - 130, VR-BVI - 100

  
1166 views
Feb 22 2017 (12:58)
Narendra yadav   152 blog posts
Re# 2173925-4            Tags   Past Edits
thanks for sharing info
so its clear NDLS-BCT is currently not capable of 130 kmph.

  
1083 views
Feb 22 2017 (14:38)
ranjitg370   2277 blog posts   1141 correct pred (74% accurate)
Re# 2173925-5            Tags   Past Edits
Now rajdhani, shatabdi, duronto types LHB trains are running 130 kmph between BCT-NDLS route. I think BCT-VR speed is 105 kmph now. After the speed upgradation works will start then 160 kmph is possible for all LHB trains.

9 posts are hidden.
  
General Travel
0 Followers
1389 views
Feb 20 2017 (10:42)   AYV/Aryankavu (1 PFs)

podhigai charal~   206 blog posts
Entry# 2171510            Tags   Past Edits
High speed trial run

  
703 views
Feb 20 2017 (17:20)
Narendra yadav   152 blog posts
Re# 2171510-1            Tags   Past Edits
please update it to atlas / map
#admin #Moderator #moderator #atlasmonitor

  
734 views
Feb 20 2017 (22:02)
podhigai charal~   206 blog posts
Re# 2171510-2            Tags   Past Edits
What u say?

  
683 views
Feb 21 2017 (10:09)
Narendra yadav   152 blog posts
Re# 2171510-3            Tags   Past Edits
change construction gauge conversion to single diesel line in atlas (aryankavu to Sengottai)

3 posts are hidden.
  
Rail News
0 Followers
2012 views
Other NewsWR/Western  -  
Nov 13 2016 (20:04)   इंदौर-मनमाड़ रेल लाइन:14 हजार करोड़ रुपए से ज्यादा होंगे खर्च

🚂अलविदा खंडवा मिटरगेज🙋🙋~   87 news posts
Entry# 2058712   News Entry# 285583         Tags   Past Edits
सभी प्रोजेक्ट पर तेजी से हो रहा अमल
इंदौर-मनमाड़ रेल लाइन,इंदौर-देवास-उज्जैन दोहरीकरण सहित चार प्रोजेक्टों के होने को लेकर स्थिति स्पष्ट हो गई है। इनके लिए केंद्र सरकार ने 21 हजार करोड़ मंजूर किए हैं। इंदौर-मनमाड़ प्रोजेक्ट के लिए सर्वे प्रक्रिया शुरू हो गई है। वहीं फतेहाबाद-उज्जैन प्रोजेक्ट का काम 30 दिनों में शुरू हो जाएगा। अन्य दो प्रोजेक्ट के लिए भी रेलवे ने तैयारी कर ली है। इनकी लोकसभा स्पीकर सुमित्रा महाजन के निर्देश पर हर स्तर पर माॅनिटरिंग भी हो रही है।
ये काम भी होंगे
बरलाई-देवास
...
more...
लेवल क्रॉसिंग 30 के स्थान पर अब रेलवे ओवरब्रिज।
बरलाई मांगलिया गांव लेवल क्रॉसिंग 45 के बजाय अब रेलवे ओवरब्रिज।
लक्ष्मीबाई नगर स्टेशन पर लेवल क्राॅसिंग 5 के जगह ओवरब्रिज।
रतलाम-खंडवा प्रोजेक्ट,राजेंद्र नगर यार्ड में लेवल क्राॅसिंग 254 एक्स की जगह आरओबी।
इंदौर-मनमाड़,इंदौर-जबलपुर नई रेल लाइन से लेकर अन्य प्रोजेक्ट पर भी तेजी से अमल हो रहा है। फतेहाबाद-उज्जैन ब्राॅड गेज का काम महीनेभर में शुरू होने की संभावना है। इंदाैर-देवास-उज्जैन दोहरीकरण का काम भी दो माह में चालू हो जाएगा।-नागेश नामजोशी,लोकसभा स्पीकर के प्रतिनिधि व रेलवे विशेषज्ञ
इंदौर-देवास-उज्जैन दोहरीकरण:60 दिन में शुरू होगा काम
79 किमी लंबी इंदौर-देवास-उज्जैन रेल लाइन का काम 60 दिन में शुरू हो जाएगा। इस रूट पर रोजाना 40 ट्रेनों का दबाव है। इसका खामियाजा यात्रियों को भुगतना पड़ता है। क्राॅसिंग के कारण कई ट्रेनें लंबे समय तक आउटर पर ही खड़ी रहती हैं। पहले इंदौर-देवास के बीच दोहरीकरण होगा। फिर देवास से उज्जैन के बीच। इससे कई समस्याएं खत्म हो जाएंगी। यात्रियों का समय भी बचेगा। प्रोजेक्ट पर 460 करोड़ रुपए खर्च होंगे।
इंदौर-जबलपुर नई रेल लाइन:10 माह में होगा मूल काम
इंदौर-जबलपुर के बीच नई रेल लाइन के लिए अगले माह सर्वे शुरू होगा। इस प्रोजेक्ट का मूल काम भी 10 माह में चालू हो जाएगा। इसकी कुल लागत 4320 करोड़ है। 342 किलोमीटर लंबी रेल लाइन की डिमांड तो काफी समय से थी,लेकिन इस बजट में इसकी मंजूरी मिली। इससे इंदौर-जबलपुर के बीच की दूरी भी घटेगी और कई नए रूट भी जुड़ जाएंगे।
फतेहाबाद-उज्जैन ब्राॅड गेज:इंदौर-उज्जैन की दूरी रह जाएगी 62 किमी
इस अहम प्रोजेक्ट पर सबसे पहले 30 दिन में काम शुरू होगा। इस पर 130 करोड़ खर्च होंगे। इसे लेकर लंबे समय से कवायद चल रही थी। यह इसलिए भी महत्वपूर्ण है क्योंकि इंदौर-उज्जैन के बीच की दूरी 79 किमी है,लेकिन फतेहाबाद-उज्जैन के बीच करीब 22 किमी में मीटर गेज लाइन है। इसे ब्राॅड गेज में बदलने से इंदौर-उज्जैन के बीच की दूरी घटकर 62 किमी रह जाएगी।
इंदौर-मनमाड़ रेल लाइन:14 हजार करोड़ रुपए से ज्यादा होंगे खर्च
रेल लाइन के लिए सर्वे प्रक्रिया शुरू हो गई है,जो छह माह में यह पूरी होगी। सात से आठ माह में काम भी शुरू हो जाएगा। इस पर 14 हजार करोड़ से ज्यादा खर्च होंगे। इसके पूरा होने से इंदौर-मुंबई के बीच की दूरी 829 से घटकर 560 किमी हो जाएगी। फिलहाल इंदौर से मुंबई के लिए ट्रेन वड़ोदरा-सूरत होते हुए जाती है। 339 किमी लंबी लाइन डाली जाएगी। यह महू से सेंधवा,शीरपुर,धुलिया होते हुए मनमाड़ पहुंचेगी। इससे पीथमपुर के उद्योग भी निर्यात के लिए सीधा बंदरगाह से जुड़ जाएंगे।
इन प्रोजेक्ट पर होना है काम

2 posts are hidden.

  
1790 views
Nov 14 2016 (10:01)
Narendra yadav   152 blog posts
Re# 2058712-3            Tags   Past Edits
Fatehabad-Ujjain #gc must be completed first. it will reduce some trafic on indore-dewas-ujjain route.
and then doubling of indore-dewas-ujjain must be done on priority basis to play more train on this route.

  
1107 views
Nov 14 2016 (10:06)
Narendra yadav   152 blog posts
Re# 2058712-4            Tags   Past Edits
Fatehabad-Ujjain 22 km railway line : First 3 KM in dual gauge line from ujjain station to shipra bridge.
is it true.
Page#    143 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site