Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun May 28, 2017 17:45:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun May 28, 2017 17:45:14 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Narendra yadav
Page#    147 Blog Entries  next>>
  
General Travel
0 Followers
328 views
May 08 2017 (10:31)   AGI/Amguri Junction (2 PFs)

Narendra yadav   157 blog posts
Entry# 2267725            Tags   Past Edits
hello all,
Is Amguri-tuli gauge conversion is over in NFR.
as shown in atlas.

  
253 views
May 08 2017 (15:37)
IR no more Safe^~   21839 blog posts   97805 correct pred (75% accurate)
Re# 2267725-1            Tags   Past Edits
  
General Travel
0 Followers
797 views
Apr 12 2017 (15:32)  

Narendra yadav   157 blog posts
Entry# 2232451            Tags   Past Edits
Hello,
#admin #moderator #atlasmonitor
please check is there any MG/NG line exists or not.
  
★  Greetings
0 Followers
1524 views
Apr 08 2017 (14:14)   NDLS/New Delhi (16 PFs)

Avadh Assam Express The Tragedy King~   4698 blog posts   1683 correct pred (74% accurate)
Entry# 2227158            Tags   Past Edits
Major Achievements by Railway from 2016-17

1 posts are hidden.

  
1149 views
Apr 08 2017 (16:47)
Narendra yadav   157 blog posts
Re# 2227158-2            Tags   Past Edits
Is amguri to Tuli gauge conversion is over in NEFR

  
1132 views
Apr 08 2017 (18:28)
Avadh Assam Express The Tragedy King~   4698 blog posts   1683 correct pred (74% accurate)
Re# 2227158-3            Tags   Past Edits
No Interest Is on this Section only Can see Rail lines now vacant no Rails only Bushes

2 posts are hidden.
  
General Travel
0 Followers
6901 views
Feb 28 2017 (16:25)   INDB/Indore Junction BG (6 PFs)

vipinpandit   595 blog posts   1 correct pred (100% accurate)
Entry# 2181213            Tags   Past Edits
#indorenews
Speed trial between Tihi-Rau (single line) and Rau-Indore (second line). After almost a year, the second line between Rau and Indore is ready and CRS Inspection Train ran @110 for the speed trial. With this there will be two lines avaialble from Indore to Rau Jn. and then 2 single lines towards Mhow and Tihi (Pithampur) respectively. In Tihi, ConCor has constructed a new container depot which will have goods and container trains from Tihi to Ratlam.
Enjoy the video..

  
5247 views
Mar 02 2017 (10:43)
Narendra yadav   157 blog posts
Re# 2181213-1            Tags   Past Edits
Great.
please update it on map.
#admin #moderator

  
3658 views
Mar 09 2017 (11:07)
Narendra yadav   157 blog posts
Re# 2181213-2            Tags   Past Edits
dear #admin #moderator #atlasmonitor
please update it on map.
as now it is double diesel line with electrification is in progress.
so please update it to dobule from indore to rau.
TIA
...
more...

2 posts are hidden.

  
2558 views
Mar 29 2017 (18:49)
Narendra yadav   157 blog posts
Re# 2181213-5            Tags   Past Edits
is Both line is electrified between indore and Rau.

  
2292 views
Mar 31 2017 (12:56)
vipinpandit   595 blog posts   1 correct pred (100% accurate)
Re# 2181213-6            Tags   Past Edits
Yes Indore to Rau double line and Rau to INdore single line is fully electrified now.. Trials are underway and a CRS inspection is scheduled for 31st March
  
General Travel
0 Followers
1357 views
Mar 30 2017 (17:25)   INDB/Indore Junction BG (6 PFs)

Narendra yadav   157 blog posts
Entry# 2216187            Tags   Past Edits
Hello ,
#admin #moderator #atlasmonitor
please check and update INDB to RAU is double line, CRS already done.
so please update it on atlas.
TIA

  
1215 views
Mar 30 2017 (19:19)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10064 blog posts   14938 correct pred (63% accurate)
Re# 2216187-3            Tags   Past Edits
done
  
Info Update
0 Followers
876 views
Mar 23 2017 (10:36)  

Narendra yadav   157 blog posts
Entry# 2207443            Tags   Past Edits
Hello
#admin #moderator #atlasmonitor
is Ahmedpur - Katwa and Baraigram - Dullabcherra gauge conversion is over.
bcoz atlas shows both line as Single Diesel-Line
please check.

  
812 views
Mar 23 2017 (11:44)
IR no more Safe^~   21839 blog posts   97805 correct pred (75% accurate)
Re# 2207443-1            Tags   Past Edits
AMP PNDI sec GC completed & commissioned already.
/blog/post/2205568
  
General Travel
0 Followers
2839 views
Mar 18 2017 (18:19)  

bti jhl without cross~   375 blog posts   4 correct pred (83% accurate)
Entry# 2202107            Tags   Past Edits
#electrification #crs on rok jind route

11 posts are hidden.

  
2187 views
Mar 20 2017 (12:29)
Narendra yadav   157 blog posts
Re# 2202107-12            Tags   Past Edits
#admin #moderator #atlasmonitor
please look into this matter
is Rohtak-jind line is single electrified line where doubling is in progress.
Please check
  
Site-Related
0 Followers
1316 views
Mar 09 2017 (12:36)  

Narendra yadav   157 blog posts
Entry# 2191150            Tags   Past Edits
Hello,
#admin #moderator #atlasmonitor
katni singrauli railway line currently is single diesel line.
atlas shows it is double diesel line and electrification is in progress.
where as it is single diesel line
...
more...
with doubling and electrification is in progress.
please check this matter and correct it on atlas.
source : click here

  
Mar 09 2017 (22:36)
Few SF trains in NCR have silver spoon of PRIORITY*^~   5335 blog posts   9540 correct pred (75% accurate)
Re# 2191150-1            Tags   Past Edits
Yes doubling and electrification is under progress , nothing wrong in it
  
Rail News
0 Followers
1679 views
Commentary/Human InterestNER/North Eastern  -  
Mar 08 2017 (07:47)   Railway official inspects newly laid track

rdb*^   129386 news posts
Entry# 2190923   News Entry# 295690         Tags   Past Edits
CHHAPRA: Decks are likely to be cleared for plying of passenger trains between Mashrakh and Thawe by the end of March or the first week of April this year.
Hope for introduction of passenger train services on the route brightened following an inspection by P K Acharya, commissioner of railway safety, NE Railway, on Monday. A high speed train ran on the newly laid track as trial. Currently, passenger trains run between Chhapra and Mashrakh only.
Sanjai Yadav, CPRO, NE Railway, Gorakhpur, said the Railway Board would soon be approached to give green
...
more...
signal to the project. “Necessary rectifications, as suggested by Acharya, would be done soon,” the CPRO added.,
He said Acharya arrived at Mashrakh station from Chhapra by a special inspection van and left for Thawe in a motor trolley to inspect the newly laid track. During his return journey, the CRS inspected the route on a high speed train. There are 24 stations and about 13 halt stations in the section.
Locals hoped that express trains, especially the New Delhi-bound trains from Pataliputra station, would also pass through the section. At Mashrakh, some rail passengers narrated their problems to the railway officials accompanying the CRS and demanded that basic facilities, such as toilet and drinking water, be improved at the station.

1 posts are hidden.

  
1447 views
Mar 09 2017 (11:27)
Narendra yadav   157 blog posts
Re# 2190923-2            Tags   Past Edits
in atlas still showing under gauge conversion.
CRS is done so please update it
#admin #moderator #atlasmonitor

1 posts are hidden.

  
798 views
Mar 09 2017 (11:45)
IR no more Safe^~   21839 blog posts   97805 correct pred (75% accurate)
Re# 2190923-4            Tags   Past Edits
Need to know, if CRS Is successful.
  
Rail News
0 Followers
1172 views
New Facilities/TechnologyWR/Western  -  
Feb 28 2017 (07:16)   Train zips at 110 kmph on new track

rdb*^   129386 news posts
Entry# 2181292   News Entry# 294925         Tags   Past Edits
Indore: A train at a speed of 110km/hour on the tracks threw away dust making it look like a thick cloud of dust suspended in the air here.
It was a scene near Juni Indore on Monday evening when the railways conducted speed trial of a newly laid broad gauge rail line between Indore and Tihi to check performance of the track.
This new 23-km line between Indore and Tihi under Indore-Dahod rail line project is expected to be commissioned by the western railways in 15 days. The commissioner of railways safety (CRS)
...
more...
Sushil Chandra conducted trial on this newly converted track at a speed of 110km/hour.
Chandra is expected to give trial report by this week and he would also mention speed limits of the track. After this the railway would issue an authorization and then the train would become operational.
Authorities on Sunday also carried out a technical inspection of this track.
"The track is almost ready for operations of passenger trains, but a final decision in this regard will be taken up by the railway board," said Chandra. He further said the track has been developed in best manner, there were few shortcomings which will be rectified soon and then the track would be made open for train operations.
The CRS began his trial from Tihi railway station around 5.10 pm and concluded at Indore at 5.31pm. The train also had halts at Rau and Rajendra Nagar railway stations.

  
1488 views
Feb 28 2017 (17:05)
Narendra yadav   157 blog posts
Re# 2181292-1            Tags   Past Edits
So now there is 2 lines between indore and rau.
please update it on map
#admin #moderator #atlasmonitor
Page#    147 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jun 7
Trains with ARP 15 Dep on: Mon Jun 12
Trains with ARP 30 Dep on: Tue Jun 27
Trains with ARP 120 Dep on: Mon Sep 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site