Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 18:08:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 18:08:09 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by PatrickB
Page#    15 Blog Entries  next>>
  
Social
0 Followers
1662 views
Oct 02 2016 (21:21)   BCT/Mumbai Central (5 PFs) | BRC/WAP-7
 

Saif Ali   7014 blog posts   114 correct pred (76% accurate)
Entry# 2009305            Tags   Past Edits
#OpenRails:-Trial Run of Humsafar Express in Open Rails from Mumbai Central to Surat it Covered Mumbai to Surat 270 km Distance in Just 1hr 32 mins with a Top Speed of 210 kmph
Loco Link BRC WAP#7 30459

5 posts are hidden.

  
288 views
Oct 03 2016 (00:47)
PatrickB   52 blog posts
Re# 2009305-6            Tags   Past Edits
How I'll get this game.
because I also wants to play
this game

1 posts are hidden.

  
287 views
Oct 03 2016 (07:25)
Saif Ali   7014 blog posts   114 correct pred (76% accurate)
Re# 2009305-8            Tags   Past Edits
Its available at piratesbay site in this site search Microsoft Train Simulator then Download it,it is a Torrent file So You Need utorrent for download file size 1.06 GB

  
251 views
Oct 03 2016 (13:08)
PatrickB   52 blog posts
Re# 2009305-9            Tags   Past Edits
Is it safe to load it.
I mean there will be no virus problem naa.

  
214 views
Oct 03 2016 (16:11)
Saif Ali   7014 blog posts   114 correct pred (76% accurate)
Re# 2009305-10            Tags   Past Edits
yes it is 100 % Safe

5 posts are hidden.

  
805 views
Oct 03 2016 (23:54)
PatrickB   52 blog posts
Re# 2009305-22            Tags   Past Edits
Thanks Bro.
  
General Travel
0 Followers
1570 views
Sep 25 2016 (00:13)   KIR/Katihar Junction (7 PFs)
 

PatrickB   52 blog posts
Entry# 2001371            Tags   Past Edits
I always visit this website Rail Info
and also I used to look at the MAP section of this
website and there I always used to get information
about the route between the Barauni Jn. and
Katihar
...
more...
Jn.
Sometines it shows with Green color which means
that entire route is BG Electrified Section.
And Sometimes it shows with the Blue color
which means Construction of Electricfication on BG
between Katihar Jn. Khagaria Jn. and Green
color from Barauni Jn. to Khagaria Jn.
Why it is so fluctuating that it gives the confusion
NEWS among people.
And as per the the sources they says that the
Trial Run Of Electric Locomotive Took Place Between
Barauni Jn. To Khagaria Jn. along with that
Current Has Been Drawn Through Wires Between
Khagaria Jn. To Katihar Jn.
Main problem is at the Over Bridge just before the Katihar
station and will overcome this situation by end of this year.
So my point is that Fix at the one point and take one stand.
whether the work has been done yet or not.

8 posts - Sun Sep 25, 2016

  
1039 views
Sep 25 2016 (23:54)
पं KAJ   486 blog posts   412 correct pred (71% accurate)
Re# 2001371-9            Tags   Past Edits
I think trial was done up to Semapur.

  
1039 views
Sep 25 2016 (23:59)
पं KAJ   486 blog posts   412 correct pred (71% accurate)
Re# 2001371-10            Tags   Past Edits

  
1039 views
Sep 25 2016 (23:59)
PatrickB   52 blog posts
Re# 2001371-11            Tags   Past Edits
Oooooohhhhhhh
That's great if it is correct then.
But according to the e-print media
trial run took place between the
Barauni Jn. to Khagaria Jn.

  
897 views
Sep 26 2016 (09:33)
©The Dark Lord™~   4873 blog posts
Re# 2001371-12            Tags   Past Edits
Can't tell you the exact date but it would at least take 2-3 months more.

  
784 views
Sep 26 2016 (23:40)
PatrickB   52 blog posts
Re# 2001371-13            Tags   Past Edits
Ok!!!!!
Let's see it.
How much time it will take it.
  
General Travel
0 Followers
5230 views
Sep 11 2016 (23:17)   15624/Kamakhya - Bhagat Ki Kothi Weekly Express
 

BARMER HOWRAH EXPRESS most demand^~   2430 blog posts   247 correct pred (56% accurate)
Entry# 1988632            Tags   Past Edits
आज ये ट्रेन डीडवाना रेलवे स्टेशन से रवाना हो रही थी तभी मेरी नजर लोको पर
पड़ी ओर मैंने देखा की इस ट्रेन का इंजन धुंए के साथ साथ आग भी निकाल रहा था।

2 posts are hidden.

  
241 views
Sep 11 2016 (23:27)
PatrickB   52 blog posts
Re# 1988632-4            Tags   Past Edits
It's a normal thing for diesel locomotive
when they're in dynamic in nature
at a high speed.

2 posts are hidden.

  
462 views
Sep 11 2016 (23:33)
ravi~   469 blog posts   217 correct pred (67% accurate)
Re# 1988632-8            Tags   Past Edits
But E.M.D. is exception.

  
473 views
Sep 11 2016 (23:35)
PatrickB   52 blog posts
Re# 1988632-9            Tags   Past Edits
Hmmmmm!!!!!
They're in exception.

11 posts are hidden.
  
General Travel
0 Followers
2664 views
Sep 07 2016 (12:01)   11124/Gwalior - Barauni Mail (PT) | BJU/Barauni Junction (9 PFs)
 

PatrickB   52 blog posts
Entry# 1983660            Tags   Past Edits
Rapti Sagar along with Barauni Gwalior Mail
gets Electric Locomotive.
So Barauni Gwalior Mail becomes
first train to be hauled by
Electric Locomotive from Gwalior Station.
NEWS
...
more...
Source:- Dainik Jaagran.

  
2512 views
Sep 07 2016 (13:00)
IRI~   496 blog posts   330 correct pred (71% accurate)
Re# 1983660-1            Tags   Past Edits
Taj used to get Eloco from Gwalior when it was GWL-NZM Taj Express.

  
2470 views
Sep 07 2016 (13:27)
PatrickB   52 blog posts
Re# 1983660-2            Tags   Past Edits
Actually
It is used to be but not now
because this train is extend
to Jhansi.
But now none train is hauled by the
electric
...
more...
locomotive from Gwalior
which originates fro Gwalior.

  
2453 views
Sep 07 2016 (14:25)
IRI~   496 blog posts   330 correct pred (71% accurate)
Re# 1983660-3            Tags   Past Edits
That's what I wrote. You can't call it "The First Train to haul and Eloco from Gwalior" as Taj was initially a Gwalior train which got Eloco.

  
2027 views
Sep 11 2016 (23:10)
PatrickB   52 blog posts
Re# 1983660-4            Tags   Past Edits
Bro!!!!!
I'm talking about the current scenario.
  
★★  Info Update
0 Followers
5301 views
Sep 06 2016 (14:48)   15203/Barauni - Lucknow Express | GKP/Gorakhpur Junction (10 PFs)
 

©The Dark Lord™~   4873 blog posts
Entry# 1982927            Tags   Past Edits
One more entry in the club of train being hauled by an Electric loco in the BJU-MFP-CPR-GKP-LJN section. From today 15203/04 BJU-LJN Exp. will run with an E-loco e2e.

29 posts are hidden.

  
487 views
Sep 07 2016 (00:32)
PatrickB   52 blog posts
Re# 1982927-30            Tags   Past Edits
Tell me that when did
Barauni Gwalior Mail
will get a Electric Locomotive.

  
293 views
Sep 07 2016 (12:05)
GKP LKO Section 120kmph Sucessful Trail Done~   2374 blog posts   4 correct pred (100% accurate)
Re# 1982927-31            Tags   Past Edits
Already running with eloco go and spot
1 Maurya
2 GKP-ASN
3 vaishali
4 raptisagar
5
...
more...
gwl-bju
6 bagh
7 ljn-bju

  
232 views
Sep 07 2016 (12:08)
PatrickB   52 blog posts
Re# 1982927-32            Tags   Past Edits
Yup Bro!!!!!
Today I gotta this NEWS
and thanks to telling me
:-)

7 posts are hidden.
  
General Travel
0 Followers
2305 views
Sep 06 2016 (22:18)   15714/Patna - Katihar InterCity Express
 

amaljha411   233 blog posts
Entry# 1983296            Tags   Past Edits
Ise MGS WAP 4 de do as its route is 100% electrified. It would save energy, time, environment.

3 posts are hidden.

  
1801 views
Sep 07 2016 (00:11)
PatrickB   52 blog posts
Re# 1983296-4            Tags   Past Edits
Hmmmmm!!!!!
Your point is right but the thing
is that some of the work is left
at Katihar station area.
And expected to be complete in
the
...
more...
month of December of this
year or January of next year.
Then it is possible to run by
Electric Locomotive.

  
1728 views
Sep 07 2016 (00:18)
PatrickB   52 blog posts
Re# 1983296-5            Tags   Past Edits
No!!!!!
It is electrified route that's why
it is indicating like this.
And current is flowing in the wire.
Biggest reason is that
some
...
more...
of the incident robbery of wire
took place so to avoid it railway has
decided that the section where work is done
there without any further delay pass the
current in the wires.

2 posts are hidden.
  
General Travel
0 Followers
2198 views
Sep 03 2016 (05:20)   11124/Gwalior - Barauni Mail (PT)
 

ramksharma   173 blog posts
Entry# 1979675            Tags   Past Edits
route change for GWL-Barauni ? if planning, then it should also start from JHS so that DBA and DAA will continue to have connectivity to Kanpur and Lucknow and Bihar.
click here
Else railways should start a new train from GWL

  
2010 views
Sep 06 2016 (00:47)
PatrickB   52 blog posts
Re# 1979675-1            Tags   Past Edits
Bro!!!!!
I'm getting this NEWS from a long period of time.
That this train is being permanently diverted from
Jhansi Kanpur line to Gwalior Etawah line.
If it is happened then this train might loose
...
more...
passengers
from Jhansi because Jhansi is the biggest source of
Eastern UP and Bihari passengers for this train.
If this train will go by Gwalior Etawah route then
after Etawah this train will pass by New Delhi Howrah chord section
and in the afternoon at Etawah station prestigious trains pass
such as
Mahananda Express
North East Express
Jammu Tavi Jamshedpur Express
etc.
and it is a mail train so express trains gets more preference than
mail train,
So it will leads to the further more delay to this train and many times
it's gets delayed and arrive at destination very late.
By diverting
Firstly- This train gonna loose its passengers.
Secondly- It is always a late and by doing so it will leads to further late.
so economic as well as timely it is a wrong decision along with that this will
leads to the DARK FUTURE of this train.
If railway wants to start then they can start the train Gwalior To Guwahati
through Gwalior Etawah Route
Firstly- Gwalior will directly gets connected to North East India.
Secondly- It will brings more passengers.
Thirdly- There will be in ease of doing business from North East India.
  
★  General Travel
0 Followers
3169 views
Aug 28 2016 (23:57)   11124/Gwalior - Barauni Mail (PT) | GWL/Gwalior Junction (5 PFs)
 

PatrickB   52 blog posts
Entry# 1975179            Tags   Past Edits
Now,
Barauni Gwalior Mail should get
electric locomotive from Gwalior.
Because the entire route Gwalior to Barauni
is electricfied and CRS has now passed the
Basti
...
more...
Gorakhpur
route which is fit for the running of the
electric locomotive.
Hence It should get WAP-4

12 posts - Mon Aug 29, 2016

  
610 views
Aug 29 2016 (11:30)
Indian Railways the life line of our Nation~   11280 blog posts   136 correct pred (83% accurate)
Re# 1975179-13            Tags   Past Edits
Gwalior se extension nahi kar sakte Barauni se hi kar do.Bgp ya Kir tak

  
2104 views
Aug 29 2016 (11:35)
PatrickB   52 blog posts
Re# 1975179-14            Tags   Past Edits
Don't Know about the Bihar Sampark Kranti Express
but New Delhi Naharlagun AC super fast Express got
Electric Locomotive.
And yesterday Locomotive change doesn't takes place
at Lucknow Junction.
So
...
more...
it won't be take too much time for
others also.

  
2057 views
Aug 29 2016 (11:47)
PatrickB   52 blog posts
Re# 1975179-15            Tags   Past Edits
For Bhagalpur it won't be possibe
because Bhagalpur comes in the
direct route of Patna Via Allahabad Mugalsarai.
But for Katihar may be possible all is possible when
Railway Ministry have to look on it.
...
more...

This trains goes via Lucknow Chhapra Samastipur
And the electrification of Barauni Katihar is in
under progress I'd watched the electrification work
this section has pole as well as wire above the tracks
but some work has to be done in Katihar Junction.
If this job is done may be it would be extend upto
Katihar Junction

  
2018 views
Aug 29 2016 (13:39)
I m back~   4011 blog posts   37 correct pred (62% accurate)
Re# 1975179-16            Tags   Past Edits
14624 aur 11123 ke arrival me sirf 1 ghante ka gap hai jhs pe which is sufficient for attaching slip coaches haan 11124 aur14623 me se kisi ek timing change karni padegi..

1 posts are hidden.

  
1717 views
Aug 30 2016 (00:11)
PatrickB   52 blog posts
Re# 1975179-18            Tags   Past Edits
No bro!!!!!
Because both the train has
different timings.
  
Rail News
0 Followers
3858 views
New Facilities/TechnologyNER/North Eastern  -  
Aug 26 2016 (10:11)   इलेक्ट्रिक इंजन से फर्राटा भरेगी वैशाली,स्टेशन यार्ड में इलेक्ट्रिक ट्रेन चलाने की अनुमति नहीं मिलने से गोरखधाम पिछड़ गई
 

☆अलविदा गोंडा मीटरगेज■☆*^~   4978 news posts
Entry# 1972809   News Entry# 278201         Tags   Past Edits
गोरखपुर : इंतजार की घड़ियां समाप्त हो गई। रेल संरक्षा आयुक्त (सीआरएस) ने गुरुवार को गोरखपुर-बस्ती रेल
गोरखपुर : इंतजार की घड़ियां समाप्त हो गई। रेल संरक्षा आयुक्त (सीआरएस) ने गुरुवार को गोरखपुर-बस्ती रेलमार्ग पर इलेक्ट्रिक ट्रेन चलाने की अनुमति प्रदान कर दी। शुक्रवार से पूर्वोत्तर रेलवे रूट पर भी इलेक्ट्रिक ट्रेन फर्राटा भरने लगेंगी। 12553/12554 सुपरफास्ट वैशाली एक्सप्रेस पहली इलेक्ट्रिक ट्रेन बनी है। वह गुरुवार को नई दिल्ली से इलेक्ट्रिक बनकर ही रवाना हुई। इलेक्ट्रिक ट्रेन के रूप में ही छपरा-गोरखपुर-लखनऊ होते हुए बरौनी से नई दिल्ली के बीच चलाई जाएगी।
निरीक्षण
...
more...
के बाद रेल संरक्षा आयुक्त ने पूर्वोत्तर रेलवे के मुख्य मार्ग बाराबंकी से छपरा (425 किमी) तक दोनों लाइनों पर इलेक्ट्रिक ट्रेन चलाने की अनुमति प्रदान कर दी है। लखनऊ-दिल्ली रूट पर पहले से विद्युत गाड़ियां दौड़ रही हैं। इधर, छपरा से बरौनी तक विद्युतीकरण पूरा हो चुका है। दिल्ली से बरौनी तक लिंक मार्ग जुड़ते ही इलेक्ट्रिक ट्रेनों का संचलन आसान हो गया है।
फिलहाल, सीआरएस ने गोरखपुर जंक्शन यार्ड में 5 रेल लाइनों पर इलेक्ट्रिक ट्रेन चलाने की अनुमति दी है। एक और दो के अलावा टू ए, तीन और चार नंबर प्लेटफार्म से भी ट्रेन चलाई जाएगी। हालांकि, पूर्वोत्तर रेलवे प्रशासन ने 12555/12556 गोरखधाम सुपरफास्ट को पहली इलेक्ट्रिक ट्रेन के रूप में तैयार किया था। लेकिन, अभी स्टेशन यार्ड में इलेक्ट्रिक ट्रेन चलाने की अनुमति नहीं मिलने से गोरखधाम पिछड़ गई है। सूत्रों का कहना है कि यार्ड के लिए भी जल्द ही सीआरएस की रिपोर्ट मिल जाएगी। गोरखधाम सहित 12565/12566 बिहार संपर्क क्रांति आदि अन्य प्रमुख गाड़ियां भी इलेक्ट्रिक बन जाएंगी।
---
उद्घाटन की तैयारी
विद्युतीकरण पूरा होने के बाद पूर्वोत्तर रेलवे प्रशासन ने जोरशोर से उद्घाटन की तैयारी शुरू कर दी है। रेलमंत्री सुरेश प्रभाकर प्रभु का वार्ता चल रही है। सितंबर के प्रथम सप्ताह में रेलमंत्री विद्युतीकरण का उद्घाटन कर सकते हैं। वह गोरखपुर में इलेक्ट्रिक शेड का शिलान्यास और उत्तरी द्वार का उद्घाटन भी करेंगे। उद्घाटन तक वैशाली व अन्य कुछ गाड़ियां इलेक्ट्रिक ट्रेन के रूप में फर्राटा भरती रहेंगी।
- See more at: click here

26 posts are hidden.

  
5852 views
Aug 28 2016 (23:48)
PatrickB   52 blog posts
Re# 1972809-27            Tags   Past Edits
Well!!!!!
Tell me that when did
Barauni Gwalior Mail will gets
elecrtic locomotive.
  
Greetings
0 Followers
997 views
Aug 23 2016 (23:51)   GKP/Gorakhpur Junction (10 PFs)
 

PatrickB   52 blog posts
Entry# 1970961            Tags   Past Edits
Congrats!!!!!
The remaining work of electrification of
Basti Gorakhpur railway route is completed
as well as now by CRS inspection
it becomes the double electrified route.
However
...
more...
it will take little time to run train by
electric locomotive.
And I'm sorry for posting the some others snap

  
785 views
Aug 25 2016 (00:09)
Mazi IRI   644 blog posts
Re# 1970961-1            Tags   Past Edits
good news...
now lots of train ll get eloco
Page#    15 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site