Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Feb 22, 2017 20:59:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Feb 22, 2017 20:59:07 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by Krishan Kant Mittal
Page#    4 Blog Entries  
  
0 Followers
864 views
Jun 05 2012 (19:12)  
 

Krishan Kant Mittal   4 blog posts
Entry# 445624            Tags   Past Edits
How to book a ticket from NJPS/New Jalpaiguri OR SGUJ/Siliguri Junction to DJ/Darjeeling ? IRCTC does not show any train . . ..

  
633 views
Jun 05 2012 (19:38)
Krishan Kant Mittal   4 blog posts
Re# 445624-1            Tags   Past Edits
Found the answer . . .
NJP to Darjeeling Toy Train service is suspended after railway track damage due to earth-quake. The service may not be restored until 2013.

  
764 views
Jun 05 2012 (19:42)
Guest: 7cfff56a   show all posts
Re# 445624-2            Tags   Past Edits
where did you find the answer?

  
627 views
Jun 05 2012 (19:44)
Soumitra Chawathe*^~   30224 blog posts   98197 correct pred (71% accurate)
Re# 445624-3            Tags   Past Edits
Source of this news please

1 posts are hidden.
  
Predictions: 14
confirm: 5
rac: 9
wl: 0
Journey: Sun Apr 29, 2012 @ 05:55
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 11   |   Charting: < 20:30
Travel: ASR/Amritsar Junction   to   ERS/Ernakulam Junction (South)   |   3094 km / 3293 km
12484/Amritsar - Kochuveli Weekly SF Express
Entry# 406719
 

Posted by: Krishan Kant Mittal   4 blog posts
PNR: 213-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 25 2012 (01:58)
Passenger 1: Waitlist# 3 (Booking Status: W/L 13,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks..

Latest Status as of: Apr 29 2012 (20:43)
Passenger 1: Waitlist# 1 (Booking Status: W/L 13,GNWL)
Chart PREPARED

  
868 views
Apr 27 2012 (11:02)
Krishan Kant Mittal   4 blog posts
Re# 406719-1            Tags   Past Edits
i think ye toh RAC bhi nai hogi :(

  
820 views
Apr 27 2012 (15:27)
ThE BoSs*^~   14210 blog posts   63666 correct pred (69% accurate)
Re# 406719-2            Tags   Past Edits
There is ONLY 1 2AC Coach, hence RAC will be 2 or 4 So CNF Chances are there, Still
  
0 Followers
652 views
Apr 24 2012 (22:23)  
 

Krishan Kant Mittal   4 blog posts
Entry# 406632            Tags   Past Edits
Why IRCTC is not opening ?

  
562 views
Apr 24 2012 (22:24)
Soumitra Chawathe*^~   30224 blog posts   98197 correct pred (71% accurate)
Re# 406632-1            Tags   Past Edits
Load on server as always. Opening at my end.

  
633 views
Apr 24 2012 (22:29)
Guest: 7cfff4e6   show all posts
Re# 406632-2            Tags   Past Edits
IRCTC experiences downtime during greater hours of the day.
kindly be aquantd with it.
  
Predictions: 26
confirm: 23
rac: 3
wl: 0
Journey: Mon Mar 05, 2012 @ 22:00
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 26   |   Charting: < 18:00
Travel: YPR/Yesvantpur Junction   to   NZM/Hazrat Nizamuddin   |   2289 km / 2289 km
12649/Karnataka Sampark Kranti Express (Via Kacheguda) (PT)
Entry# 362704
 

Posted by: Krishan Kant Mittal   4 blog posts
PNR: 443-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 02 2012 (22:27)
Passenger 1: Waitlist# 3 (Booking Status: W/L 22,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 05 2012 (18:16)
Passenger 1: Confirmed (Booking Status: W/L 22,GNWL)
Chart NOT Prepared
Page#    4 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Mar 4
Trains with ARP 15 Dep on: Thu Mar 9
Trains with ARP 30 Dep on: Fri Mar 24
Trains with ARP 120 Dep on: Thu Jun 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site