Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Mar 26, 2017 13:31:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Mar 26, 2017 13:31:30 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by BSB AMH GKP New Line TENDER ISSUED for RET Survey~
Page#    87 Blog Entries  next>>
  
★★★  Rail Fanning
0 Followers
3311 views
Feb 13 2017 (20:57)   11071/Kamayani Express

Hussain*^~   19746 blog posts   363387 correct pred (82% accurate)
Entry# 2163347            Tags   Past Edits
The changing times of Kamayani Express-
2014: ICF Rake with 20695 ET WAM4
2017: LHB Rake with 25016 ET WAP4...

13 posts are hidden.

  
1450 views
Feb 23 2017 (01:25)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2163347-14            Tags   Past Edits
1 compliments
kabhi na hoga
Next change is the extension from Varanasi either in 2017 or in 2018.

  
427 views
Mar 20 2017 (12:25)
12165 Ratnagiri Superfast Express~   1676 blog posts   10 correct pred (52% accurate)
Re# 2163347-15            Tags   Past Edits
what kamayani ka extension hoga ?
kaha tak? nhi hona chahiye
  
Rail News
0 Followers
397 views
Other NewsNER/North Eastern  -  
Mar 17 2017 (17:17)   आजमगढ़ रेलवे स्टेशन बनेगा यात्रियों का हब

BSB AMH GKP New Line TENDER ISSUED for RET Survey~   29 news posts
Entry# 2200950   News Entry# 296634         Tags   Past Edits
यात्रियों की सुख सुविधा में विस्तार व रेल यातायात को संरक्षित करने के उद्देश्य से महाप्रबंधक पूर्वोत्तर रेलवे राजीव मिश्र ने बुधवार को आजमगढ़ रेलवे स्टेशन का निरीक्षण किया। उन्होंने कहा कि आजमगढ़ स्टेशन यात्रियों के लिए हब बनेगा। यहां से मालगाड़ी ट्रैक को हटाकर दूसरे स्टेशन पर शिफ्ट किया जाएगा।
पूर्वोत्तर रेलवे गोरखपुर के महाप्रबंधक श्री मिश्र सड़क मार्ग से गोरखपुर से आजमगढ़ आए। निरीक्षण के क्रम में सबसे पहले आजमगढ़ रेलवे स्टेशन के सिंह द्वार का सुंदरीकरण करने, स्वागत बोर्ड लगाने, एलईडी ग्लोशाइन से स्टेशन के नाम का बोर्ड लगाने, सर्कुलेटिंग एरिया में हाई मास्ट लाईट लगाने का निर्देश दिया। उन्होंने कहा कि आजमगढ़ रेलवे स्टेशन को यात्रियों का हब बनाया जाएगा। प्लेट फार्म दो व तीन से मालगाड़ी का
...
more...
ट्रैक हटाकर इसे दूसरे स्टेशन पर शिफ्ट किया जाएगा। इसके साथ ही उन्होंने स्टेशन सर्विस रोड के सुधार और उसे जोड़ने वाली सड़क में सुधार हेतु सम्बंधित अधिकारियों को निर्देश दिया। सर्कुलेटिंग एरिया के गोल पार्क में पर्यावरण में सुधार के लिए उन्होंने अधिकारियों के साथ पौध रोपण भी किया। इसके पश्चात महाप्रबंधक ने आजमगढ़ स्टेशन पर चल रहे यात्री सुविधा विकास कार्यों का निरीक्षण किया। इस दौरान उन्होंने रेलवे स्टेशन के प्लेटफार्म संख्या 2 और 3 पर चल रहे उच्चीकरण एवं सरफेस सुधार के कार्यों को अतिशीघ्र पूरी गुणवत्ता के साथ समय सीमा के अंदर कार्य पूरा करने का निर्देश दिया। निरीक्षण के दौरान स्टेशन पर उपलब्ध यात्री सुख सुविधाओं का संज्ञान लिया साथ ही गार्ड, ड्राइवर के साथ ही विश्रामालयों में उपलब्ध सुविधाओं का निरीक्षण किया । नवनिर्मित वाशिंग पीट के कार्यकुशलता की जांच की। आजमगढ़ स्टेशन एवं परिसर की साफ सफाई को और चुस्त दुरुस्त बनाने का निर्देश दिया।
जीएम ने स्टेशन परिसर में स्थित यात्री आरक्षण केंद्र का निरीक्षण के साथ ही आरक्षण काउंटर, पूछताछ काउंटर तथा ऑटोमेटिक टिकट वेंडिंग मशीनों का परीक्षण किया । उन्होंने वेंडिंग मशीनों के ऊपर उसकी कार्यविधि और सुविधाओं की जानकारी हेतु बोर्ड लगाने, आरक्षण केंद्र में यात्रियों के आरक्षण फार्म भरने में सहूलियत हेतु टेबल लगवाने,आरक्षण हाल में प्रकाश की समुचित व्यवस्था करने हेतु सम्बंधित को दिशा निर्देश दिया। निरीक्षण के दौरान उनके साथ मंडल रेल प्रबंधक वाराणसी एसके कश्यप, मुख्य संरक्षा अधिकारी एनके अम्बिकेश, प्रिंसिपल चीफ इंजीनियर पीडी शर्मा, मुख्य विद्युत इंजीनियर योगेश अस्थाना, वरिष्ठ मंडल इंजीनियर अजय वार्ष्णेय, वरिष्ठ मंडल परिचालन प्रबंधक पीसी जायसवाल, वरिष्ठ मंडल चिकित्साधिकारी डॉ. नीरज कुमार, वरिष्ठ मंडल विद्युत इंजीनियर एमके सिंह, मंडल इंजीनियर एनकेपी गुप्ता, वरिष्ठ विद्युत इंजीनियर एमके सिंह, वरिष्ठ सिंगनल एवं दूरसंचार इंजीनियर आशुतोष पाण्डेय, मुख्यालय के प्रमुख विभागाध्यक्ष, वाराणसी मंडल के पदाधिकारी, पर्यवेक्षक के अलावा आजमगढ़ रेलवे स्टेशन के स्टेशन अधीक्षक बाबू राम, वाणिज्य निरीक्षक अखिलेश सिंह, रेलवे सुरक्षा बल के निरीक्षक राजेश कुमार सहित अन्य लोग मौजूद रहे।

  
600 views
Mar 17 2017 (19:06)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 2200950-1            Tags   Past Edits
Bas ye sirf newspapers tak hi simit na rah jaaye

  
674 views
Mar 18 2017 (00:28)
My new name Divans Aught Yup^~   32194 blog posts   23040 correct pred (76% accurate)
Re# 2200950-2            Tags   Past Edits
AMH- Mau- BUI ye sb ko suvidha milni chahiye
Varanasi ja k train lene me bhut dikkat hoti h

  
642 views
Mar 18 2017 (01:43)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2200950-3            Tags   Past Edits
Aisa hona to nahi chahiye...Let us wait & watch

  
616 views
Mar 18 2017 (01:46)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2200950-4            Tags   Past Edits
Mau Terminal banne ke bad to Mau se to kuchh trains start ho hi jaengi...Ek had tak Mau ki problem solve ho jaegi

  
531 views
Mar 18 2017 (08:32)
My new name Divans Aught Yup^~   32194 blog posts   23040 correct pred (76% accurate)
Re# 2200950-5            Tags   Past Edits
Kb tk banega mau terminal
  
Rail News
0 Followers
601 views
Commentary/Human InterestNER/North Eastern  -  
Mar 16 2017 (21:05)   सहजनवा-दोहरीघाट रेललाइन के लिए भूमि अधिग्रहण शीघ्र

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   5256 news posts
Entry# 2200120   News Entry# 296567         Tags   Past Edits
लाइफ लाइन बनेगी रेल लाइन
गोरखपुर वरिष्ठ संवाददातासहजनवा से दोहरीघाट तक 70 किलोमीटर नई रेललाइन के लिए अंतिम सर्वे पूरा होने के बाद लाइन बिछाने के लिए भूमि अधिग्रहण में तेजी आ गई है। सूत्रों के अनुसार जल्द ही भूमि अधिग्रहण की प्रक्रिया शुरू हो जाएगी। केन्द्र के साथ ही अब प्रदेश में भी भाजपा की सरकार आ जाने से काम में और तेजी आने के आसार हैं। पूर्वोत्तर रेलवे ने लाइन सर्वे की फाइनल रिपोर्ट भी बोर्ड को भेज दी है। जून या जुलाई से लाइन बिछाने का काम शुरू हो सकता है। रेल प्रशासन का दावा है कि तीन साल में 70 किलोमीटर की लम्बी लाइन बिछा ली जाएगी। लम्बे समय से लंबित सहजनवा-दोहरीघाट वाया बांसगांव रेल लाइन की मांग
...
more...
पर रेल मंत्रलय ने मुहर लगाते हुए 2016 के रेज बजट में 746 करोड़ रुपये का बजट जारी कर दिया था। शहर के लोग तहसीलों में रेल से जा सकेंगे और तहसील के लोग रेल से सीधे शहर आ सकेंगे। इसके साथ ही अब गोरखपुर-कुशीनगर रेललाइन और महराजगंज-घुघली रेल परियोजना में भी तेजी आने की उम्मीद है।
सहजनवा से दोहरीघाट रेल लाइन बन जाने से दक्षिणांचल के विकास की उम्मीद है। यह रेल लाइन दक्षिणांचल के हर प्रमुख कस्बे बांसगांव, खजनी, गोला और बड़हलगंज से गुजरेगी। लाइन सरयू पार कर दोहरीघाट पहुंचेगी।

1 posts are hidden.

  
618 views
Mar 17 2017 (17:13)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2200120-2            Tags   Past Edits
Very good news but source of news is not mentioned. it is only correspondent view.
Work will start since June or July...70 kms in 3 years...Is it looking practical?

  
420 views
Mar 17 2017 (19:42)
a2z~   365 blog posts
Re# 2200120-3            Tags   Past Edits
Land acquisition procedure and laws are so tedious that, 3 year period is often not enough to complete the land acquisition forget about completion of construction and commissioning of the project.

  
1125 views
Mar 18 2017 (01:23)
☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   12382 blog posts   3041 correct pred (65% accurate)
Re# 2200120-4            Tags   Past Edits
News confirmed by gm ner ....so no point of doubt here☺

  
1099 views
Mar 18 2017 (01:53)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2200120-5            Tags   Past Edits
News confirmed by gm ner... Where? On twitter?

  
1037 views
Mar 18 2017 (02:11)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2200120-6            Tags   Past Edits
We are not so hopeless creatures...Land acquisition will be done...but completion in 3 years is doubtful.
  
General Travel
0 Followers
300 views
Mar 17 2017 (17:31)   AMH/Azamgarh (2 PFs)

BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Entry# 2200844            Tags   Past Edits
GM NER & DRM BSB with other officials inspected Azamgarh railway station on 15 Mar 2017 and announced following facilities -
1. Goods shed will be shifted to another station.
2. Remaining work of PF2 & 3 will be completed in 2 or 3 months.
3. Beatification of Singh Gate
4.
...
more...
Welcome board
5. LED Glow shine station name board
6. High mast light at circulating area
7. Pay & use toilet outside station etc.

  
294 views
Mar 17 2017 (17:35)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2200844-1            Tags   Past Edits
Hope that announcements will become reality soon.
  
Rail News
0 Followers
347 views
New Facilities/TechnologyCR/Central  -  
Mar 10 2017 (09:49)   India's first AC ambulance on rails to aid in golden hour

BSB AMH GKP New Line TENDER ISSUED for RET Survey~   29 news posts
Entry# 2192350   News Entry# 295905         Tags   Past Edits
MUMBAI: Central Railway (CR) unveiled India's first airconditioned rail ambulance that will rush to the aid of injured passengers during the vital 'golden hour'.
An accident victim's chances of survival are greatest if treatment is provided within an hour or less, known as the golden hour. The ambulance, which will be stationed at Kalyan, was made by modifying an AC coach used for passenger service.
CR's chief public relations officer Narendra Patil said, "The four-coach rail ambulance of CR is the first fully airconditioned medical recovery van of the Indian railway."
...
more...

The ide a for such a facility came after 19 passengers died and around 145 got injured after the Diva-Sawantwadi train derailed between Nagothane and Roha stations in Maharashtra's Raigad district in May 2014. Former CR general manager S K Sood felt such an ambulance was necessary for quick response to emergency situations. A rail ambulance will also be able to ferry more people and travel faster compared to regular ambulances.
When not used for accidents, the ambulance will be used for medical facilities in large congregations .

  
1050 views
Mar 10 2017 (09:52)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2192350-1            Tags   Past Edits
Central Railway (CR) unveiled India's first air-conditioned rail ambulance...Very good initiative for injured passengers.
  
Info Update
0 Followers
1932 views
Feb 02 2017 (22:21)   AMH/Azamgarh (2 PFs)

BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Entry# 2149489            Tags   Past Edits
Tender issued for Reconnaissance Engineering- Cum - Traffic Survey (Civil Engineering portion
only) of Varanasi-Lalganj-Azamgarh-Gorakhpur new rail line.
Now Varanasi-Lalganj-Azamgarh-Gorakhpur new line is officially confirmed.
New year gift to people of Varanasi, Azamgarh & Gorakhpur.

  
1697 views
Feb 02 2017 (23:38)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2149489-1            Tags   Past Edits
As per this survey there will be two lines -
1. Varanasi-Lalganj-Azamgarh-Gorakhpur line (this survey)
2. Dohrighat-Sahjanwa line for which DPR of Final Location Survey has been sent to RB

  
1722 views
Feb 02 2017 (23:54)
My new name Divans Aught Yup^~   32194 blog posts   23040 correct pred (76% accurate)
Re# 2149489-2            Tags   Past Edits
congratulations
change the category to info update

  
1594 views
Feb 03 2017 (12:01)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2149489-3            Tags   Past Edits
For two lines two new bridges needs to be constructed on Ghaghra river...practically & economically feasible or not?

  
958 views
Feb 24 2017 (10:48)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 2149489-4            Tags   Past Edits
Not feasible at all
  
Rail News
0 Followers
894 views
Rail BudgetNER/North Eastern  -  IR Press Release 
Feb 12 2017 (13:07)   Important Railway Projects over N.E.Railway in Budget-2017-18

BSB AMH GKP New Line TENDER ISSUED for RET Survey~   29 news posts
Entry# 2162394   News Entry# 293724         Tags   Past Edits
Important Railway Projects over N.E.Railway in Budget-2017-18

  
1570 views
Feb 13 2017 (09:05)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 2162394-1            Tags   Past Edits
What is in this news????

  
1748 views
Feb 15 2017 (11:48)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2162394-2            Tags   Past Edits
Download word file & see...Survey of Varanasi-Lalganj-Azamgarh-Gorakhpur rail line is mentioned in official press release.

  
1574 views
Feb 15 2017 (21:40)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 2162394-3            Tags   Past Edits
Not getting open.....Plz send me via WhatsApp
Departure: Sat Feb 11 2017 @ 10:55
11059/Godan Express (PT)
Trip# 96833    Traveller: RAVI PRAJAPATI*^~    Linked PNR Entry# 2033371
Class: Sleeper - SL
From: LTT/Lokmanya Tilak Terminus
To: AMH/Azamgarh
11 wishes
HJ HJ HJ HJ HJ HJ HJ HJ HJ Happy Journey Bhai HJ Ravi bro
TRIP HAS ENDED.
Blog  Time-Table

25 posts are hidden. Click to open.

  
1732 views
Feb 12 2017 (12:13)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2033371-26            Tags   Past Edits
Please take & post pics of under construction PF 2 & 3 at Azamgarh station...Work on PF 2 & 3 may be completed within 1-2 months. Please inspect & check how much work (cement concrete - CC plaster) has been completed?
  
Imaginary
0 Followers
768 views
011
Feb 08 2017 (23:55)   IMG11589/♥♥Azamgarh - Indore Jn Weekly Exp♥♥

मोहम्मद राशिद खान*^~   19 img trains   17 popular
261 green flags   16 red flags   13 green per Train
Entry# 2156573            Tags   Past Edits
How is it?

  
607 views
Feb 09 2017 (23:23)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156573-1            Tags   Past Edits
A practical TT
Useful for Azamgarh, Jaunpur & Allahabad

  
539 views
Feb 10 2017 (09:44)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 2156573-2            Tags   Past Edits
Iski RSA wali train Dekhii???

  
556 views
Feb 10 2017 (10:43)
मोहम्मद राशिद खान*^~   5511 blog posts   8017 correct pred (86% accurate)
Re# 2156573-3            Tags   Past Edits

  
548 views
Feb 10 2017 (10:46)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156573-4            Tags   Past Edits
  
Rail News
0 Followers
1788 views
Commentary/Human InterestNER/North Eastern  -  
Feb 08 2017 (14:01)   गोरखपुर से वाराणसी के बीच 200 किमी लम्बी रेल लाइन को मंजूरी

BSB AMH GKP New Line TENDER ISSUED for RET Survey~   29 news posts
Entry# 2156010   News Entry# 293410         Tags   Past Edits
केंद्र सरकार ने पूर्वोत्तर रेलवे के गोरखपुर से वाराणसी के बीच आजमगढ होते हुए 200 किलोमीटर लम्बी रेल लाइन बनाये जाने की मंजूरी प्रदान की है। ...
गोरखपुर। केंद्र सरकार ने पूर्वोत्तर रेलवे के गोरखपुर से वाराणसी के बीच आजमगढ होते हुए 200 किलोमीटर लम्बी रेल लाइन बनाये जाने की मंजूरी प्रदान की है। पूर्वोत्तर रेलवे के प्रवक्ता ने बताया कि वाराणसी और गोरखपुर के बीच इस 200 किलोमीटर लाइन के सर्वे के लिए 30 लाख रूपये की लागत आयेगी।
उन्होंने बताया कि इस नई रेल लाइन के होने से गोरखपुर और
...
more...
वाराणसी के बीच की दूरी कम हो जायेगी तथा आजमगढ और बांसगांव के कई क्षेत्र रेल लाइन सम्पर्क मार्ग से जुड जायेंगे।
उन्होंने बताया कि इसके अलावा अनवरगंज और मन्धाना के बीच 17 किलोमीटर नई लाइन के सर्वे के लिए सात लाख और गोरखपुर कैन्ट से वाल्मिकी नगर के 91 किलोमीटर दोहरीकरण के सर्वे के लिए 45 लाख रूपये की मंजूरी प्रदान की गयी है।
92 साल बाद पहली बार आम बजट के साथ घोषित रेल बजट पूर्वोत्तर रेलवे के लिए सौगात लेकर आया है। इसी प्रकार गोरखपुर से होते हुए बुद्ध की परिनिर्वाणस्थली कुशीनगर तक 64 किलोमीटर नई रेल लाइन बिछाने के लिए सरकार ने मंजूरी दे दी है जिसकी लागत 1345 करोड रूपये आयेगी।
प्रवक्ता ने बताया कि वित्त मंत्रालय ने नई रेल लाइन, दोहरीकरण, अमान परिवर्तन और विद्युतीकरण समेत कई परियोजनाओं की पूर्वोत्तर रेलवे को कई सौगात मिली है। उन्होंने बताया कि पडरौना कुशीनगर केअलावा एटा कासगंज क्षेत्र में भी नयी रेल लाइन बिछेगी। पीलीभीत-शाहजहांपुर और नानपारा-नेपालगंज रोड का भी आमान परिवर्तन होगा और मल्हौर-डालीगंज रेल खंड का दोहरीकरण भी होगा।

6 posts - Wed Feb 08, 2017

17 posts are hidden.

  
3252 views
Feb 08 2017 (18:55)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156010-18            Tags   Past Edits
Not sanctioned yet...Only tender for RET survey has been issued.

  
3328 views
Feb 08 2017 (18:58)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156010-19            Tags   Past Edits
Two different lines means two bridges on Ghaghra river that is not possible.

  
3209 views
Feb 08 2017 (19:08)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156010-20            Tags   Past Edits
Chahe jitna samay lage lekin is line ko to ban na hi hai...
Varanasi Lalganj Azamgarh Gorakhpur rail line is badly needed for overall development of railways in Azamgarh

  
3112 views
Feb 08 2017 (19:33)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156010-21            Tags   Past Edits
Complete route may be like this-
Gorakhpur jn-...Sahjanwa Jn-Piprauli-Khajni-Unwal-Bansgaon-Uruwa-Gola Bazar-Barhalganj-Dohrighat Jn - Confirmed by Final Location Survey of Sahjanwa-Dohrighat line
Dohrighat-Jiyanpur-Mubarakpur-Sidhari Junction-Azamgarh Jn-Lalganj-Deogaon-Dobhi Jn-Sarnath Jn...Varanasi - Just proposed route after field survey (RET survey) route will be confirmed.

  
3076 views
Feb 08 2017 (19:38)
BSB AMH GKP New Line TENDER ISSUED for RET Survey~   254 blog posts   13 correct pred (58% accurate)
Re# 2156010-22            Tags   Past Edits
Seven stations between Sahjanwa Jn-Dohrighat Jn
Page#    87 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Apr 5
Trains with ARP 15 Dep on: Mon Apr 10
Trains with ARP 30 Dep on: Tue Apr 25
Trains with ARP 120 Dep on: Mon Jul 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site