Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Mon Jul 28, 2014 17:52:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 7, 2014
Trains with ARP 30 Dep on: Wed Aug 27, 2014
Trains with ARP 60 Dep on: Fri Sep 26, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
  • Entry# 871813
    Oct 09 2013 (06:44AM)


    Some new features have been introduced: #siteannouncement . Blogs: 1. Multiple Train & Station tags can be added to each Blog Entry as well as each Blog Reply within the Blog Entry. The "Tags" link within each Blog Entry/Reply will show the list of Train/Station Tags. . 2. The Forum submenu within the Train &...
Blog Posts by ram.mishra
Page#    Showing 1 to 2 of 2 blog entries  
Predictions: 35
confirm: 33
rac: 0
wl: 2
Journey: Fri Apr 19, 2013 @ 19:15
12615/Grand Trunk (GT) Express
Entry# 726040
   Posted by: ram.mishra   1 blog posts   5 correct pred (55% accurate)
PNR: 444-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >36   |   Charting: < 15:39   |   Similar PNRs
MAS/Chennai Central   to   BPL/Bhopal Junction   |   1479 km / 2182 km
Original Status as of: Apr 18 2013 (12:49AM)
Passenger 1: Waitlist# 1 (Booking Status: W/L 2,PQWL)
Passenger 2: Waitlist# 2 (Booking Status: W/L 3,PQWL)
Passenger 3: Waitlist# 3 (Booking Status: W/L 4,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 19 2013 (4:20PM)
Passenger 1: B1,3 (Booking Status: W/L 2,PQWL)
Passenger 2: Waitlist# 1 (Booking Status: W/L 3,PQWL)
Passenger 3: Waitlist# 2 (Booking Status: W/L 4,PQWL)
Chart PREPARED

276 views
Apr 19 2013 (10:21AM)        

ram.mishra   1 blog posts   5 correct pred (55% accurate)  
Re# 726040-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Please analyze
Predictions: 21
confirm: 21
rac: 0
wl: 0
Journey: Fri Jan 20, 2012 @ 19:15
12615/Grand Trunk (GT) Express
Entry# 327020
   Posted by: ram.mishra   1 blog posts   5 correct pred (55% accurate)
PNR: 433-xxxxxxx (E-Ticket)   |   AC 2-tier - 2A   |   Tot Seats: Avbl >17   |   Charting: < 13:10   |   Similar PNRs
MAS/Chennai Central   to   NGP/Nagpur Junction   |   1090 km / 2182 km
Original Status as of: Jan 13 2012 (11:13PM)
Passenger 1: Waitlist# 3 (Booking Status: W/L 10,PQWL)
Passenger 2: Waitlist# 4 (Booking Status: W/L 11,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jan 20 2012 (4:31PM)
Passenger 1: A1,41 (Booking Status: W/L 10,PQWL)
Passenger 2: A1,42 (Booking Status: W/L 11,PQWL)
Chart PREPARED

290 views
Jan 18 2012 (7:21PM)        

goyalwc**   20356 blog posts   16484 correct pred (76% accurate)  
Re# 327020-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Congrats. Confirmed. Wish you a happy journey.
Page#    2 blog entries  

Scroll to Top
Scroll to Bottom